Parcel 001-860-122
Owners
BOART LONGYEAR COMPANY
754505
754505
2455 S 3600 W
SALT LAKE CITY, UT 84119-1127
Parcel Summary
Location | 605 UNION PACIFIC WAY ELKO CITY, NV |
---|---|
Use Code | 500: General Industrial - light industry, trucking and warehousing, service, repair, etc. |
Tax District | 11.0: City of Elko |
Map Parcel | 753230 P1 |
Acreage | 16.1900 |
Plat Maps | 001-860Ind.pdf (683kb) 001-860P1.pdf (239kb) 001-860P2.pdf (259kb) 001-860P3.pdf (266kb) 001-860P4.pdf (41kb) 001-860P5.pdf (1,047kb) 001-860P6.pdf (1,056kb) |
Lineage | 001-860-053 |
Additional Site Addresses
645 UNION PACIFIC WAY
Value History
2024 | 2023 | 2022 | 2021 | 2020 | 2019 | |
---|---|---|---|---|---|---|
Total Building Value | $2,705,696 | $3,353,491 | $2,915,934 | $2,759,886 | $2,817,820 | $2,767,343 |
Total Extra Features Value | $1,078,066 | $0 | $0 | $0 | $0 | $0 |
Total Secured Pers Prop | $0 | $0 | $0 | $0 | $0 | $0 |
Total Land Value | $777,120 | $777,120 | $777,120 | $777,120 | $777,120 | $777,120 |
Taxable Value | $4,560,882 | $4,130,611 | $3,693,054 | $3,537,006 | $3,594,940 | $3,544,463 |
Net Exemptions Value | $0 | $0 | $0 | $0 | $0 | $0 |
Net Assessed Value | $1,596,309 | $1,445,714 | $1,292,569 | $1,237,952 | $1,258,229 | $1,240,562 |
New Improvements | $0 | $71,457 | $0 | $0 | $0 | $0 |
New Land | $0 | $0 | $0 | $0 | $0 | $777,120 |
Document/Transfer/Sales History
Buildings
Building # 1, Section # 1, BOART LONGYEAR NEVADA, Service Repair Garage
Building # 2, Section # 1, BOART LONGYEAR DRILLING, Storage Garage
Building # 3, Section # 1, BOART LONGYEAR DRILLING, Storage Garage
Building # 4, Section # 1, BOART LONGYEAR DRILLING, Office Building
Building # 5, Section # 1, BOART LONGYEAR DRILLING, Service Repair Garage
Building # 6, Section # 1, BOART LONGYEAR DRILLING, Service Repair Garage
Building # 7, Section # 1, EKCO DRILLING WAREHOUSE, Storage Warehouse
Extra Features
Code | Description | Length | Width | Units | Unit Price | AYB | Repl Cost | % Good Condition | Dpr Value* | Final Value |
---|---|---|---|---|---|---|---|---|---|---|
MCCP1 | PORCH-CONCRETE,COVERED W/PREFORMED METAL | 92.00 | $28 | 1991 | $2,605 | 49% | $1,276 | $1,276 | ||
BOLLARD | PARKING BARRIER POSTS/BOLLARDS | 5.00 | $189 | 1991 | $946 | 49% | $463 | $463 | ||
CC/L6T | FENCE CC/L 6' W/ TOPRAIL | 2165.00 | $28 | 1991 | $60,555 | 49% | $29,672 | $29,672 | ||
CLGSWG3 | GATE-C/L 3'WIDE SWINGING CLASS=HEIGHT | 1.00 | $566 | 1991 | $566 | 49% | $277 | $277 | ||
CLGSLD20 | GATE-C/L20'WIDE SLIDER | 2.00 | $2,708 | 1991 | $5,416 | 49% | $2,654 | $2,654 | ||
CLGSWG20 | GATE-C/L20'WIDE SWINGING CLASS=HGT | 2.00 | $2,167 | 1991 | $4,333 | 49% | $2,123 | $2,123 | ||
BBW3 | FENCE-BARB WIRE 2-3 STR LOW | 2300.00 | $5 | 1991 | $11,247 | 49% | $5,511 | $5,511 | ||
ASPHC | ASPH COMMERCIAL | 109946.00 | $10 | 1991 | $1,066,476 | 49% | $522,573 | $522,573 | ||
MVL | LIGHTS - MERCURY VAPOR, COST P/EACH | 4.00 | $1,532 | 1994 | $6,128 | 54% | $3,278 | $3,278 | ||
CFW | CONC FLATWORK | 378.00 | $8 | 1994 | $3,050 | 54% | $1,632 | $1,632 | ||
CLGSWG20 | GATE-C/L20'WIDE SWINGING CLASS=HGT | 2.00 | $1,867 | 1994 | $3,735 | 54% | $1,998 | $1,998 | ||
CFW | CONC FLATWORK | 760.00 | $7 | 2000 | $5,518 | 63% | $3,449 | $3,449 | ||
MVL | LIGHTS - MERCURY VAPOR, COST P/EACH | 2.00 | $1,532 | 2000 | $3,064 | 63% | $1,915 | $1,915 | ||
BOLLARD | PARKING BARRIER POSTS/BOLLARDS | 8.00 | $189 | 2000 | $1,513 | 63% | $946 | $946 | ||
QSET361 | QSET36' BLDGS | 30 | 40 | 1200.00 | $39 | 2000 | $46,380 | 63% | $28,988 | $28,988 |
LIGHTS | LIGHTING-LOW 1/AVG 2/GOOD 3 | 1200.00 | $2 | 2000 | $2,376 | 63% | $1,485 | $1,485 | ||
HEAT | HEATING - LOW, AVG, GOOD | 1200.00 | $2 | 2000 | $1,824 | 63% | $1,140 | $1,140 | ||
PAINT | PAINT BOOTH FOR TRUCK FILTERED EXHAUST | 1.00 | $78,993 | 2004 | $78,993 | 69% | $54,110 | $54,110 | ||
TH2 | GAS STN DBL TRUCK HOIST 19,500 LBS | 1.00 | $28,466 | 2004 | $28,466 | 69% | $19,499 | $19,499 | ||
CRANESP | BRIDGE CRANEWAY SPAN 25 TON & UP | 160.00 | $474 | 2004 | $75,840 | 69% | $51,950 | $51,950 | ||
BOLLARD | PARKING BARRIER POSTS/BOLLARDS | 25.00 | $189 | 2004 | $4,728 | 69% | $3,239 | $3,239 | ||
MVL | LIGHTS - MERCURY VAPOR, COST P/EACH | 15.00 | $1,532 | 2004 | $22,980 | 69% | $15,741 | $15,741 | ||
CFW | CONC FLATWORK | 9280.00 | $6 | 2004 | $56,144 | 69% | $38,459 | $38,459 | ||
CPRKLOT | PARKING LOT-8" CFW | 1360.00 | $11 | 2005 | $15,178 | 70% | $10,624 | $10,624 | ||
CPRKLOT | PARKING LOT-8" CFW | 30 | 60 | 1800.00 | $11 | 2005 | $20,088 | 70% | $14,062 | $14,062 |
SH T1F1 | SHED W/FLOOR COSTS, ALL SIDES CLOSED | 8 | 20 | 160.00 | $27 | 2005 | $4,387 | 70% | $3,071 | $3,071 |
SH T1F1 | SHED W/FLOOR COSTS, ALL SIDES CLOSED | 8 | 40 | 320.00 | $24 | 2005 | $7,676 | 70% | $5,373 | $5,373 |
SH T1F1 | SHED W/FLOOR COSTS, ALL SIDES CLOSED | 8 | 40 | 320.00 | $24 | 2005 | $7,676 | 70% | $5,373 | $5,373 |
SH T1F1 | SHED W/FLOOR COSTS, ALL SIDES CLOSED | 8 | 40 | 320.00 | $24 | 2005 | $7,676 | 70% | $5,373 | $5,373 |
SH T1F1 | SHED W/FLOOR COSTS, ALL SIDES CLOSED | 8 | 40 | 320.00 | $24 | 2005 | $7,676 | 70% | $5,373 | $5,373 |
SH T1F1 | SHED W/FLOOR COSTS, ALL SIDES CLOSED | 8 | 40 | 320.00 | $24 | 2005 | $7,676 | 70% | $5,373 | $5,373 |
SH T1F1 | SHED W/FLOOR COSTS, ALL SIDES CLOSED | 8 | 40 | 320.00 | $24 | 2005 | $7,676 | 70% | $5,373 | $5,373 |
SH T1F1 | SHED W/FLOOR COSTS, ALL SIDES CLOSED | 8 | 20 | 160.00 | $27 | 2005 | $4,387 | 70% | $3,071 | $3,071 |
SH T1F1 | SHED W/FLOOR COSTS, ALL SIDES CLOSED | 8 | 20 | 160.00 | $27 | 2005 | $4,387 | 70% | $3,071 | $3,071 |
SH T1F1 | SHED W/FLOOR COSTS, ALL SIDES CLOSED | 8 | 20 | 160.00 | $27 | 2005 | $4,387 | 70% | $3,071 | $3,071 |
CFW | CONC FLATWORK | 2711.00 | $6 | 2007 | $17,486 | 73% | $12,765 | $12,765 | ||
TH2 | GAS STN DBL TRUCK HOIST 19,500 LBS | 2.00 | $28,466 | 2007 | $56,932 | 73% | $41,560 | $41,560 | ||
BOLLARD | PARKING BARRIER POSTS/BOLLARDS | 9.00 | $189 | 2007 | $1,702 | 73% | $1,243 | $1,243 | ||
MVL | LIGHTS - MERCURY VAPOR, COST P/EACH | 6.00 | $1,532 | 2007 | $9,192 | 73% | $6,710 | $6,710 | ||
SH T1F1 | SHED W/FLOOR COSTS, ALL SIDES CLOSED | 8 | 40 | 320.00 | $24 | 2012 | $7,676 | 81% | $6,179 | $6,179 |
SH T1F1 | SHED W/FLOOR COSTS, ALL SIDES CLOSED | 8 | 40 | 320.00 | $24 | 2012 | $7,676 | 81% | $6,179 | $6,179 |
SH T1F1 | SHED W/FLOOR COSTS, ALL SIDES CLOSED | 8 | 40 | 320.00 | $24 | 2012 | $7,676 | 81% | $6,179 | $6,179 |
SH T1F1 | SHED W/FLOOR COSTS, ALL SIDES CLOSED | 8 | 40 | 320.00 | $24 | 2012 | $7,676 | 81% | $6,179 | $6,179 |
SH T1F1 | SHED W/FLOOR COSTS, ALL SIDES CLOSED | 8 | 40 | 320.00 | $24 | 2012 | $7,676 | 81% | $6,179 | $6,179 |
CFW | CONC FLATWORK | 12 | 240 | 2880.00 | $6 | 2019 | $18,576 | 91% | $16,904 | $16,904 |
CFW | CONC FLATWORK | 16 | 268 | 4288.00 | $6 | 2019 | $25,942 | 91% | $23,608 | $23,608 |
CFW | CONC FLATWORK | 920.00 | $7 | 2019 | $6,679 | 91% | $6,078 | $6,078 | ||
CFW | CONC FLATWORK | 4362.00 | $6 | 1988 | $26,390 | 45% | $11,744 | $11,744 | ||
MVL | LIGHTS - MERCURY VAPOR, COST P/EACH | 12.00 | $1,532 | 1988 | $18,384 | 45% | $8,181 | $8,181 | ||
BOLLARD | PARKING BARRIER POSTS/BOLLARDS | 20.00 | $189 | 1988 | $3,783 | 45% | $1,683 | $1,683 | ||
CPRKLOT | PARKING LOT-8" CFW | 1760.00 | $11 | 1991 | $19,642 | 49% | $9,624 | $9,624 | ||
CFW | CONC FLATWORK | 1200.00 | $6 | 1991 | $7,740 | 49% | $3,793 | $3,793 | ||
MVL | LIGHTS - MERCURY VAPOR, COST P/EACH | 4.00 | $1,532 | 1991 | $6,128 | 49% | $3,003 | $3,003 | ||
COP1 | PORCH-CONCRETE OPEN SLAB | 1046.00 | $9 | 1991 | $9,811 | 49% | $4,808 | $4,808 |
Land Lines
Personal Property
Account | Secured/ Unsecured | Owner | Description |
---|---|---|---|
BU081580 | Unsecured | TAYLOR MADE IRONSERVICES | BU - BUSINESS EQUIPMENT |
BU240291 | Unsecured | MGX EQUIPMENT SERVICES, LLC | BU - BUSINESS EQUIPMENT |
BU930208 | Unsecured | BOART LONGYEAR CO | BU - BUSINESS EQUIPMENT |
Disclaimer
All parcel data on this page is for use by the Elko County Assessor for assessment purposes only. The summary data on this page may not be a complete representation of the parcel or of the improvements thereon. Building information, including unit counts and number of permitted units, should be verified with the appropriate building and planning agencies. Zoning information should be verified with the appropriate planning agency. All parcels are reappraised each year. This is a true and accurate copy of the records of the Elko County Assessor's Office as of November 24, 2024.