Parcel 001-860-0AY
Owners
ARG BHELKNV001 LLC
726780
726780
C/O BRIDGESTONE HOSEPOWER LLC
50 INDUSTRIAL LOOP N
ORANGE PARK, FL 32073-6258
Parcel Summary
Location | 655 ROMEO WY ELKO CITY, NV |
---|---|
Use Code | 500: General Industrial - light industry, trucking and warehousing, service, repair, etc. |
Tax District | 11.0: City of Elko |
Map Parcel | 404699 P4 |
Acreage | 2.0000 |
Plat Maps | 001-860Ind.pdf (683kb) 001-860P1.pdf (239kb) 001-860P2.pdf (259kb) 001-860P3.pdf (266kb) 001-860P4.pdf (41kb) 001-860P5.pdf (1,047kb) 001-860P6.pdf (1,056kb) |
Value History
2024 | 2023 | 2022 | 2021 | 2020 | 2019 | 2018 | |
---|---|---|---|---|---|---|---|
Total Building Value | $1,101,489 | $1,322,926 | $1,168,271 | $1,103,246 | $1,116,886 | $1,110,351 | $1,072,757 |
Total Extra Features Value | $403,692 | $0 | $0 | $0 | $0 | $0 | $0 |
Total Secured Pers Prop | $0 | $0 | $0 | $0 | $0 | $0 | $0 |
Total Land Value | $156,000 | $156,000 | $156,000 | $156,000 | $156,000 | $156,000 | $156,000 |
Taxable Value | $1,661,181 | $1,478,926 | $1,324,271 | $1,259,246 | $1,272,886 | $1,266,351 | $1,228,757 |
Net Exemptions Value | $0 | $0 | $0 | $0 | $0 | $0 | $0 |
Net Assessed Value | $581,413 | $517,624 | $463,495 | $440,736 | $445,510 | $443,223 | $430,065 |
New Improvements | $0 | $0 | $0 | $0 | $0 | $0 | $0 |
New Land | $0 | $0 | $0 | $0 | $0 | $0 | $0 |
Document/Transfer/Sales History
Buildings
Building # 1, Section # 1, BRIDGESTONE HOSEPOWER, Storage Warehouse
Type | Model | Heated Sq Ft | Repl Cost New | YrBlt | WAY | Other % Dpr | Normal % Dpr | % Cond | Value |
---|---|---|---|---|---|---|---|---|---|
COMM | 406 | 12000 | $1,244,075 | 2016 | 2016 | 0.00% | 13.50% | 86.50% | $1,076,125 |
Structural Elements
Type | Description | Code | Details |
---|---|---|---|
EW_C | EXT WALL-Commercial | 916 | Single Wall - Metal On Steel Frame |
EW_C | EXT WALL-Commercial | 812 | Concrete Block |
HEAT_C | HEAT-Commercial | 621 | Radiant Space Heaters |
HEAT_C | HEAT-Commercial | 606 | Space Heater |
HEAT_C | HEAT-Commercial | 612 | Warm/Cool Air |
ST | Number of Stories (COMM) | 1.00 | |
WH | Average Wall Height (COMM) | 20.00 | |
681 | Sprinkler System Generic - Commercial | 12000.00 |
Extra Features
Code | Description | Length | Width | Units | Unit Price | AYB | Repl Cost | % Good Condition | Dpr Value* | Final Value |
---|---|---|---|---|---|---|---|---|---|---|
CPRKLOT6 | PARKING LOT 6" CFW | 1456.00 | $10 | 2016 | $14,225 | 87% | $12,305 | $12,305 | ||
ASPHC | ASPH COMMERCIAL | 17496.00 | $10 | 2016 | $169,711 | 87% | $146,800 | $146,800 | ||
DHFL1 | FLOOR-DOCK HEIGHT FLOORS-SF | 24 | 80 | 1920.00 | $11 | 2016 | $20,525 | 87% | $17,754 | $17,754 |
SHPDCK7S | DOCK LOAD 7S WD/STL FRAME | 20 | 59 | 1180.00 | $69 | 2016 | $81,361 | 87% | $70,377 | $70,377 |
SHPDCK2S | DOCK SHIP 2S WD/STEEL PIER CL-S | 20 | 21 | 420.00 | $62 | 2016 | $26,141 | 87% | $22,612 | $22,612 |
HYDCKLEV | HYDRAULIC DOCK LEVELORS | 1.00 | $10,123 | 2016 | $10,123 | 87% | $8,756 | $8,756 | ||
COP2 | PORCH-CONCRETE OPEN W/STEPS | 4 | 7 | 28.00 | $32 | 2016 | $886 | 87% | $766 | $766 |
CANOPYSA | GAS STN CANOPY AVE STEEL COST P/SF | 20 | 80 | 1600.00 | $47 | 2016 | $75,168 | 87% | $65,020 | $65,020 |
PIPRA | FENCE - METAL PIPE AVG | 55.00 | $26 | 2016 | $1,436 | 87% | $1,242 | $1,242 | ||
SH T1F1 | SHED W/FLOOR COSTS, ALL SIDES CLOSED | 8 | 40 | 320.00 | $24 | 2016 | $7,676 | 87% | $6,640 | $6,640 |
SH T1F1 | SHED W/FLOOR COSTS, ALL SIDES CLOSED | 8 | 40 | 320.00 | $24 | 2016 | $7,676 | 87% | $6,640 | $6,640 |
CNCBW6 | WALL - COMM'L 6" C/BLOCK, REINFORCED | 5 | 30 | 150.00 | $17 | 2016 | $2,604 | 87% | $2,252 | $2,252 |
MPGA | GATE - MTL PIPE/PORT PANEL AVG | 14.00 | $25 | 2016 | $344 | 87% | $297 | $297 | ||
BOLLARD | PARKING BARRIER POSTS/BOLLARDS | 8.00 | $189 | 2016 | $1,513 | 87% | $1,309 | $1,309 | ||
MVL | LIGHTS - MERCURY VAPOR, COST P/EACH | 11.00 | $1,532 | 2016 | $16,852 | 87% | $14,577 | $14,577 | ||
STLPOLE | LIGHT POLE - STEEL P/LF | 30.00 | $101 | 2016 | $3,017 | 87% | $2,609 | $2,609 | ||
C6 | CURBING 6"CONCRETE NO GUTTER PER LF | 200.00 | $15 | 2016 | $2,916 | 87% | $2,522 | $2,522 | ||
CG1 | CURBING 6"CONCRETE W/1'GUTTER PER LF | 135.00 | $22 | 2016 | $2,905 | 87% | $2,513 | $2,513 | ||
XGUT | GUTTER - CONCRETE CROSS, AT INTERSECTION | 204.00 | $11 | 2016 | $2,232 | 87% | $1,930 | $1,930 | ||
CFW | CONC FLATWORK | 1280.00 | $6 | 2016 | $8,256 | 87% | $7,141 | $7,141 |
Land Lines
Personal Property
Account | Secured/ Unsecured | Owner | Description |
---|---|---|---|
BU212223 | Unsecured | BRIDGESTONE HOSEPOWER LLC | BU - BUSINESS EQUIPMENT |
Disclaimer
All parcel data on this page is for use by the Elko County Assessor for assessment purposes only. The summary data on this page may not be a complete representation of the parcel or of the improvements thereon. Building information, including unit counts and number of permitted units, should be verified with the appropriate building and planning agencies. Zoning information should be verified with the appropriate planning agency. All parcels are reappraised each year. This is a true and accurate copy of the records of the Elko County Assessor's Office as of November 24, 2024.