Parcel 001-860-044
Owners
VEGA REAL ESTATE COMPANY LLC
4100 E IDAHO ST
ELKO, NV 89801-4694
Parcel Summary
Location | 4100 IDAHO ST ELKO CITY, NV |
---|---|
Use Code | 500: General Industrial - light industry, trucking and warehousing, service, repair, etc. |
Tax District | 11.0: City of Elko |
Map Parcel | 229410 P3 |
Acreage | 16.7200 |
Plat Maps | 001-860Ind.pdf (683kb) 001-860P1.pdf (239kb) 001-860P2.pdf (259kb) 001-860P3.pdf (266kb) 001-860P4.pdf (41kb) 001-860P5.pdf (1,047kb) 001-860P6.pdf (1,056kb) |
Value History
2024 | 2023 | 2022 | 2021 | 2020 | 2019 | 2018 | |
---|---|---|---|---|---|---|---|
Total Building Value | $732,720 | $918,946 | $713,960 | $703,754 | $722,563 | $711,046 | $697,020 |
Total Extra Features Value | $283,696 | $0 | $0 | $0 | $0 | $0 | $0 |
Total Secured Pers Prop | $43,648 | $42,749 | $39,129 | $39,709 | $40,006 | $39,100 | $39,680 |
Total Land Value | $802,560 | $802,560 | $802,560 | $802,560 | $802,560 | $802,560 | $802,560 |
Taxable Value | $1,862,624 | $1,764,254 | $1,555,649 | $1,546,023 | $1,565,129 | $1,552,706 | $1,539,260 |
Net Exemptions Value | $0 | $0 | $0 | $0 | $0 | $0 | $0 |
Net Assessed Value | $651,918 | $617,489 | $544,477 | $541,108 | $547,795 | $543,447 | $538,741 |
New Improvements | $0 | $107,920 | $3,583 | $0 | $0 | $0 | $0 |
New Land | $0 | $0 | $0 | $0 | $0 | $0 | $0 |
Document/Transfer/Sales History
Buildings
Building # 1, Section # 1, VEGA CONST/TRUCKING OFFICE, Office Building
Building # 2, Section # 1, VEGA CONST/TRUCKING STORAGE & REPAIR, Storage Garage
Building # 3, Section # 1, VEGA CONST/TRUCKING EQ STORAGE, Equipment (Shop) Building
Extra Features
Code | Description | Length | Width | Units | Unit Price | AYB | Repl Cost | % Good Condition | Dpr Value* | Final Value |
---|---|---|---|---|---|---|---|---|---|---|
C/L4T | FENCE C/L 4' W/ TOP RAIL | 480.00 | $16 | 1989 | $7,824 | 46% | $3,599 | $3,599 | ||
SH T1F3 | SHED W/FLOOR COSTS, ALL SIDES CLOSED | 6 | 10 | 60.00 | $58 | 1988 | $3,460 | 45% | $1,540 | $1,540 |
MDT | GAS STN DISPENSR TWIN MECHANICAL | 4.00 | $10,220 | 1988 | $40,880 | 45% | $18,192 | $18,192 | ||
ASPHC | ASPH COMMERCIAL | 9560.00 | $10 | 1989 | $92,732 | 46% | $42,657 | $42,657 | ||
SUBPUMP2 | GAS STN 3/4HP SUBMRGD PUMP | 2.00 | $2,934 | 1988 | $5,868 | 45% | $2,611 | $2,611 | ||
SH T1F1 | SHED W/FLOOR COSTS, ALL SIDES CLOSED | 8 | 20 | 160.00 | $27 | 1989 | $4,387 | 46% | $2,018 | $2,018 |
SH T1F1 | SHED W/FLOOR COSTS, ALL SIDES CLOSED | 8 | 40 | 320.00 | $24 | 1989 | $7,676 | 46% | $3,531 | $3,531 |
PIPEDISP | GAS STN PIPING-COST PER PRODUCT | 2.00 | $2,057 | 1988 | $4,114 | 45% | $1,831 | $1,831 | ||
FUG500 | FUEL STRG U/G 5,000 GAL | 2.00 | $29,331 | 1988 | $58,662 | 45% | $26,105 | $26,105 | ||
SH T1F1 | SHED W/FLOOR COSTS, ALL SIDES CLOSED | 8 | 20 | 160.00 | $27 | 1989 | $4,387 | 46% | $2,018 | $2,018 |
SH T1F1 | SHED W/FLOOR COSTS, ALL SIDES CLOSED | 8 | 40 | 320.00 | $24 | 1989 | $7,676 | 46% | $3,531 | $3,531 |
PIPETANK | GAS STN PIPE-COST PER TANK | 2.00 | $1,342 | 1988 | $2,684 | 45% | $1,194 | $1,194 | ||
CONISL | ISLAND - CONCRETE LOW - SF | 60.00 | $18 | 1988 | $1,054 | 45% | $469 | $469 | ||
CPRKLOT | PARKING LOT-8" CFW | 5635.00 | $11 | 1988 | $62,887 | 45% | $27,985 | $27,985 | ||
CC/L6T | FENCE CC/L 6' W/ TOPRAIL | 2021.00 | $28 | 1988 | $56,527 | 45% | $25,155 | $25,155 | ||
BBW3 | FENCE-BARB WIRE 2-3 STR LOW | 2171.00 | $5 | 1988 | $10,616 | 45% | $4,724 | $4,724 | ||
CLGSLD20 | GATE-C/L20'WIDE SLIDER | 4.00 | $2,334 | 1988 | $9,337 | 45% | $4,155 | $4,155 | ||
CLGSWG15 | GATE-C/L15'WIDE SWINGING CLASS=HGT | 2.00 | $1,532 | 1988 | $3,064 | 45% | $1,364 | $1,364 | ||
CLGSWG20 | GATE-C/L20'WIDE SWINGING CLASS=HGT | 2.00 | $1,867 | 1988 | $3,735 | 45% | $1,662 | $1,662 | ||
CFW | CONC FLATWORK | 6375.00 | $6 | 1997 | $38,569 | 58% | $22,370 | $22,370 | ||
MVL | LIGHTS - MERCURY VAPOR, COST P/EACH | 2.00 | $1,532 | 1988 | $3,064 | 45% | $1,363 | $1,363 | ||
CSCCP2 | PORCH-CONCRETE,COVERED W/COMP. SHINGLE | 40.00 | $49 | 1989 | $1,953 | 46% | $898 | $898 | ||
SH T1F1 | SHED W/FLOOR COSTS, ALL SIDES CLOSED | 8 | 40 | 320.00 | $24 | 2010 | $7,676 | 78% | $5,949 | $5,949 |
CFW | CONC FLATWORK | 3572.00 | $6 | 1989 | $21,611 | 46% | $9,941 | $9,941 | ||
CFW | CONC FLATWORK | 11205.00 | $6 | 1988 | $67,790 | 45% | $30,167 | $30,167 | ||
CAR AL | CARPORT-ALUM FLT RF W/SLAB | 18 | 36 | 648.00 | $17 | 1989 | $11,146 | 46% | $5,127 | $5,127 |
CANOPYSL | GAS STN CANOPY LOW STEEL COST P/SF | 20 | 50 | 1000.00 | $36 | 1988 | $36,360 | 45% | $16,180 | $16,180 |
SH T1F1 | SHED W/FLOOR COSTS, ALL SIDES CLOSED | 8 | 40 | 320.00 | $24 | 2010 | $7,676 | 78% | $5,949 | $5,949 |
Land Lines
Personal Property
Account | Secured/ Unsecured | Owner | Description |
---|---|---|---|
BS000168 | Secured | VEGA REAL ESTATE COMPANY LLC | BS - BUSINESS EQUIPMENT |
BU230399 | Unsecured | MAJOR DRILLING AMERICA | BU - BUSINESS EQUIPMENT |
Disclaimer
All parcel data on this page is for use by the Elko County Assessor for assessment purposes only. The summary data on this page may not be a complete representation of the parcel or of the improvements thereon. Building information, including unit counts and number of permitted units, should be verified with the appropriate building and planning agencies. Zoning information should be verified with the appropriate planning agency. All parcels are reappraised each year. This is a true and accurate copy of the records of the Elko County Assessor's Office as of November 24, 2024.