Parcel 001-860-122

Owners

BOART LONGYEAR COMPANY
754505

2455 S 3600 W
SALT LAKE CITY, UT 84119-1127

Parcel Summary

Location 605 UNION PACIFIC WAY
ELKO CITY, NV
Use Code 500: General Industrial - light industry, trucking and warehousing, service, repair, etc.
Tax District 11.0: City of Elko
Map Parcel 753230 P1
Acreage 16.1900
Plat Maps 001-860Ind.pdf (683kb)
001-860P1.pdf (239kb)
001-860P2.pdf (259kb)
001-860P3.pdf (266kb)
001-860P4.pdf (41kb)
001-860P5.pdf (735kb)
001-860P6.pdf (1,056kb)
Lineage 001-860-053

Additional Site Addresses

645 UNION PACIFIC WAY

Value History

202420232022202120202019
Total Building Value$2,705,696$3,353,491$2,915,934$2,759,886$2,817,820$2,767,343
Total Extra Features Value$1,078,066$0$0$0$0$0
Total Secured Pers Prop$0$0$0$0$0$0
Total Land Value$777,120$777,120$777,120$777,120$777,120$777,120
Taxable Value$4,560,882$4,130,611$3,693,054$3,537,006$3,594,940$3,544,463
Net Exemptions Value$0$0$0$0$0$0
Net Assessed Value$1,596,309$1,445,714$1,292,569$1,237,952$1,258,229$1,240,562
New Improvements$0$71,457$0$0$0$0
New Land$0$0$0$0$0$777,120

Document/Transfer/Sales History

Instrument /
Official Record
DateTypeV/IDcl ValueOwnership
7545052019-05-14Improved$1Grantor: BOART LONGYEAR NEVADA
Grantee: BOART LONGYEAR COMPANY
M 6028352008-09-15Vacant$5,600,000Grantor: L&L EXPLORATION LLC
Grantee: BOART LONGYEAR NEVADA
5928582008-03-25Vacant$1Grantor: L & L EXPLORATION
Grantee: L&L EXPLORATION LLC
0528001831986-07-10Vacant$3Grantee: L & L EXPLORATION

Buildings

Building # 1, Section # 1, BOART LONGYEAR NEVADA, Service Repair Garage

TypeModelHeated Sq FtRepl Cost NewYrBltWAYOther % DprNormal % Dpr% CondValue
COMM52811120$917,936198819880.00%55.50%44.50%$408,482

Structural Elements

TypeDescriptionCodeDetails
EW_CEXT WALL-Commercial916Single Wall - Metal On Steel Frame
HEAT_CHEAT-Commercial606Space Heater
STNumber of Stories (COMM)1.00
WHAverage Wall Height (COMM)35.00
763Mezzanine - Storage1600.00
Subareas
TypeGross AreaPercent of BaseAdjusted Area
GBA11,120100%11,120

Building # 2, Section # 1, BOART LONGYEAR DRILLING, Storage Garage

TypeModelHeated Sq FtRepl Cost NewYrBltWAYOther % DprNormal % Dpr% CondValue
COMM3262400$163,440199119910.00%51.00%49.00%$80,086

Structural Elements

TypeDescriptionCodeDetails
EW_CEXT WALL-Commercial916Single Wall - Metal On Steel Frame
HEAT_CHEAT-Commercial606Space Heater
STNumber of Stories (COMM)1.00
WHAverage Wall Height (COMM)12.00
Subareas
TypeGross AreaPercent of BaseAdjusted Area
GBA2,400100%2,400

Building # 3, Section # 1, BOART LONGYEAR DRILLING, Storage Garage

TypeModelHeated Sq FtRepl Cost NewYrBltWAYOther % DprNormal % Dpr% CondValue
COMM3263360$250,051200020000.00%37.50%62.50%$156,282

Structural Elements

TypeDescriptionCodeDetails
EW_CEXT WALL-Commercial916Single Wall - Metal On Steel Frame
HEAT_CHEAT-Commercial606Space Heater
STNumber of Stories (COMM)1.00
WHAverage Wall Height (COMM)18.00
Subareas
TypeGross AreaPercent of BaseAdjusted Area
GBA3,360100%3,360

Building # 4, Section # 1, BOART LONGYEAR DRILLING, Office Building

TypeModelHeated Sq FtRepl Cost NewYrBltWAYOther % DprNormal % Dpr% CondValue
COMM3443802$706,868199119910.00%51.00%49.00%$346,365

Structural Elements

TypeDescriptionCodeDetails
EW_CEXT WALL-Commercial804Block with Stucco
HEAT_CHEAT-Commercial612Warm/Cool Air
STNumber of Stories (COMM)1.00
WHAverage Wall Height (COMM)12.00
Subareas
TypeGross AreaPercent of BaseAdjusted Area
GBA3,802100%3,802

Building # 5, Section # 1, BOART LONGYEAR DRILLING, Service Repair Garage

TypeModelHeated Sq FtRepl Cost NewYrBltWAYOther % DprNormal % Dpr% CondValue
COMM52811360$1,409,262200420040.00%31.50%68.50%$965,344

Structural Elements

TypeDescriptionCodeDetails
EW_CEXT WALL-Commercial916Single Wall - Metal On Steel Frame
HEAT_CHEAT-Commercial621Radiant Space Heaters
STNumber of Stories (COMM)1.00
WHAverage Wall Height (COMM)29.00
763Mezzanine - Storage418.00
Subareas
TypeGross AreaPercent of BaseAdjusted Area
GBA11,360100%11,360

Building # 6, Section # 1, BOART LONGYEAR DRILLING, Service Repair Garage

TypeModelHeated Sq FtRepl Cost NewYrBltWAYOther % DprNormal % Dpr% CondValue
COMM5285400$697,344200720070.00%27.00%73.00%$509,061

Structural Elements

TypeDescriptionCodeDetails
EW_CEXT WALL-Commercial916Single Wall - Metal On Steel Frame
HEAT_CHEAT-Commercial606Space Heater
HEAT_CHEAT-Commercial612Warm/Cool Air
STNumber of Stories (COMM)1.00
WHAverage Wall Height (COMM)18.00
763Mezzanine - Storage960.00
Subareas
TypeGross AreaPercent of BaseAdjusted Area
GBA5,400100%5,400

Building # 7, Section # 1, EKCO DRILLING WAREHOUSE, Storage Warehouse

TypeModelHeated Sq FtRepl Cost NewYrBltWAYOther % DprNormal % Dpr% CondValue
COMM4063154$292,409199419940.00%46.50%53.50%$156,439

Structural Elements

TypeDescriptionCodeDetails
EW_CEXT WALL-Commercial916Single Wall - Metal On Steel Frame
HEAT_CHEAT-Commercial606Space Heater
HEAT_CHEAT-Commercial612Warm/Cool Air
STNumber of Stories (COMM)1.00
WHAverage Wall Height (COMM)20.00
763Mezzanine - Storage800.00
Subareas
TypeGross AreaPercent of BaseAdjusted Area
GBA3,154100%3,154

Extra Features

*RCNLD: Replacement Cost New, Less Depreciation

CodeDescriptionLengthWidthUnitsUnit PriceAYBRepl Cost% Good ConditionDpr Value*Final ValueNotes
MCCP1PORCH-CONCRETE,COVERED W/PREFORMED METAL92.00$281991$2,60549%$1,276$1,276
BOLLARDPARKING BARRIER POSTS/BOLLARDS5.00$1891991$94649%$463$463
CC/L6TFENCE CC/L 6' W/ TOPRAIL2165.00$281991$60,55549%$29,672$29,672
CLGSWG3GATE-C/L 3'WIDE SWINGING CLASS=HEIGHT1.00$5661991$56649%$277$277
CLGSLD20GATE-C/L20'WIDE SLIDER2.00$2,7081991$5,41649%$2,654$2,654
CLGSWG20GATE-C/L20'WIDE SWINGING CLASS=HGT2.00$2,1671991$4,33349%$2,123$2,123
BBW3FENCE-BARB WIRE 2-3 STR LOW2300.00$51991$11,24749%$5,511$5,511
ASPHCASPH COMMERCIAL109946.00$101991$1,066,47649%$522,573$522,573
MVLLIGHTS - MERCURY VAPOR, COST P/EACH4.00$1,5321994$6,12854%$3,278$3,278
CFWCONC FLATWORK378.00$81994$3,05054%$1,632$1,632
CLGSWG20GATE-C/L20'WIDE SWINGING CLASS=HGT2.00$1,8671994$3,73554%$1,998$1,998
CFWCONC FLATWORK760.00$72000$5,51863%$3,449$3,449
MVLLIGHTS - MERCURY VAPOR, COST P/EACH2.00$1,5322000$3,06463%$1,915$1,915
BOLLARDPARKING BARRIER POSTS/BOLLARDS8.00$1892000$1,51363%$946$946
QSET361QSET36' BLDGS30401200.00$392000$46,38063%$28,988$28,988
LIGHTSLIGHTING-LOW 1/AVG 2/GOOD 31200.00$22000$2,37663%$1,485$1,485
HEATHEATING - LOW, AVG, GOOD1200.00$22000$1,82463%$1,140$1,140
PAINTPAINT BOOTH FOR TRUCK FILTERED EXHAUST1.00$78,9932004$78,99369%$54,110$54,110built-in exhaust fans, lighting, & track
TH2GAS STN DBL TRUCK HOIST 19,500 LBS1.00$28,4662004$28,46669%$19,499$19,499
CRANESPBRIDGE CRANEWAY SPAN 25 TON & UP160.00$4742004$75,84069%$51,950$51,950Bldg #5 has (2) bridge cranes: (1) 10-ton crane & (1) 3-ton crane 80L' each
BOLLARDPARKING BARRIER POSTS/BOLLARDS25.00$1892004$4,72869%$3,239$3,239
MVLLIGHTS - MERCURY VAPOR, COST P/EACH15.00$1,5322004$22,98069%$15,741$15,741
CFWCONC FLATWORK9280.00$62004$56,14469%$38,459$38,459
CPRKLOTPARKING LOT-8" CFW1360.00$112005$15,17870%$10,624$10,624
CPRKLOTPARKING LOT-8" CFW30601800.00$112005$20,08870%$14,062$14,062
SH T1F1SHED W/FLOOR COSTS, ALL SIDES CLOSED820160.00$272005$4,38770%$3,071$3,071
SH T1F1SHED W/FLOOR COSTS, ALL SIDES CLOSED840320.00$242005$7,67670%$5,373$5,373
SH T1F1SHED W/FLOOR COSTS, ALL SIDES CLOSED840320.00$242005$7,67670%$5,373$5,373
SH T1F1SHED W/FLOOR COSTS, ALL SIDES CLOSED840320.00$242005$7,67670%$5,373$5,373
SH T1F1SHED W/FLOOR COSTS, ALL SIDES CLOSED840320.00$242005$7,67670%$5,373$5,373
SH T1F1SHED W/FLOOR COSTS, ALL SIDES CLOSED840320.00$242005$7,67670%$5,373$5,373
SH T1F1SHED W/FLOOR COSTS, ALL SIDES CLOSED840320.00$242005$7,67670%$5,373$5,373
SH T1F1SHED W/FLOOR COSTS, ALL SIDES CLOSED820160.00$272005$4,38770%$3,071$3,071
SH T1F1SHED W/FLOOR COSTS, ALL SIDES CLOSED820160.00$272005$4,38770%$3,071$3,071
SH T1F1SHED W/FLOOR COSTS, ALL SIDES CLOSED820160.00$272005$4,38770%$3,071$3,071
CFWCONC FLATWORK2711.00$62007$17,48673%$12,765$12,765
TH2GAS STN DBL TRUCK HOIST 19,500 LBS2.00$28,4662007$56,93273%$41,560$41,560
BOLLARDPARKING BARRIER POSTS/BOLLARDS9.00$1892007$1,70273%$1,243$1,243
MVLLIGHTS - MERCURY VAPOR, COST P/EACH6.00$1,5322007$9,19273%$6,710$6,710
SH T1F1SHED W/FLOOR COSTS, ALL SIDES CLOSED840320.00$242012$7,67681%$6,179$6,179
SH T1F1SHED W/FLOOR COSTS, ALL SIDES CLOSED840320.00$242012$7,67681%$6,179$6,179
SH T1F1SHED W/FLOOR COSTS, ALL SIDES CLOSED840320.00$242012$7,67681%$6,179$6,179
SH T1F1SHED W/FLOOR COSTS, ALL SIDES CLOSED840320.00$242012$7,67681%$6,179$6,179
SH T1F1SHED W/FLOOR COSTS, ALL SIDES CLOSED840320.00$242012$7,67681%$6,179$6,179
CFWCONC FLATWORK122402880.00$62019$18,57691%$16,904$16,904
CFWCONC FLATWORK162684288.00$62019$25,94291%$23,608$23,608
CFWCONC FLATWORK920.00$72019$6,67991%$6,078$6,078
CFWCONC FLATWORK4362.00$61988$26,39045%$11,744$11,744
MVLLIGHTS - MERCURY VAPOR, COST P/EACH12.00$1,5321988$18,38445%$8,181$8,181
BOLLARDPARKING BARRIER POSTS/BOLLARDS20.00$1891988$3,78345%$1,683$1,683
CPRKLOTPARKING LOT-8" CFW1760.00$111991$19,64249%$9,624$9,624
CFWCONC FLATWORK1200.00$61991$7,74049%$3,793$3,793
MVLLIGHTS - MERCURY VAPOR, COST P/EACH4.00$1,5321991$6,12849%$3,003$3,003
COP1PORCH-CONCRETE OPEN SLAB1046.00$91991$9,81149%$4,808$4,808

Land Lines

CodeDescriptionZoneFrontDepthUnitsUnit TypeRateAcreageSq FtTotal AdjValueNotes
500General Industrial - light industry, trucking and warehousing, service, repair, etc.ZLI1.00SITE$777,120.0016.19705,2361.00$777,120

Personal Property

AccountSecured/
Unsecured
OwnerDescription
BU081580UnsecuredTAYLOR MADE IRONSERVICESBU - BUSINESS EQUIPMENT
BU240291UnsecuredMGX EQUIPMENT SERVICES, LLCBU - BUSINESS EQUIPMENT
BU930208UnsecuredBOART LONGYEAR COBU - BUSINESS EQUIPMENT

Disclaimer

All parcel data on this page is for use by the Elko County Assessor for assessment purposes only. The summary data on this page may not be a complete representation of the parcel or of the improvements thereon. Building information, including unit counts and number of permitted units, should be verified with the appropriate building and planning agencies. Zoning information should be verified with the appropriate planning agency. All parcels are reappraised each year. This is a true and accurate copy of the records of the Elko County Assessor's Office as of September 20, 2024.

Building Sketches