Parcel 001-860-113
Owners
ELKHORN INVESTMENTS
744814
744814
6041 SUNSHINE LN
MONTAGUE, CA 96064-9302
Parcel Summary
Location | 4250 IDAHO ST ELKO CITY, NV |
---|---|
Use Code | 500: General Industrial - light industry, trucking and warehousing, service, repair, etc. |
Tax District | 11.0: City of Elko |
Map Parcel | 659240 P1 |
Acreage | 3.0380 |
Plat Maps | 001-860Ind.pdf (683kb) 001-860P1.pdf (239kb) 001-860P2.pdf (259kb) 001-860P3.pdf (266kb) 001-860P4.pdf (41kb) 001-860P5.pdf (1,047kb) 001-860P6.pdf (1,056kb) |
Lineage | 001-860-045 |
Value History
2024 | 2023 | 2022 | 2021 | 2020 | 2019 | 2018 | |
---|---|---|---|---|---|---|---|
Total Building Value | $1,162,873 | $1,522,383 | $1,337,977 | $1,258,883 | $1,276,057 | $1,245,091 | $1,208,914 |
Total Extra Features Value | $551,741 | $0 | $0 | $0 | $0 | $0 | $0 |
Total Secured Pers Prop | $0 | $0 | $0 | $0 | $0 | $0 | $0 |
Total Land Value | $236,963 | $236,963 | $236,963 | $236,963 | $236,963 | $236,963 | $236,963 |
Taxable Value | $1,951,577 | $1,759,346 | $1,574,940 | $1,495,846 | $1,513,020 | $1,482,054 | $1,445,877 |
Net Exemptions Value | $0 | $0 | $0 | $0 | $0 | $0 | $0 |
Net Assessed Value | $683,052 | $615,771 | $551,229 | $523,546 | $529,557 | $518,719 | $506,057 |
New Improvements | $0 | $4,457 | $0 | $0 | $0 | $0 | $118,857 |
New Land | $0 | $0 | $0 | $0 | $0 | $0 | $0 |
Document/Transfer/Sales History
Buildings
Building # 1, Section # 1, FED EX FREIGHT, Transit Warehouse
Extra Features
Code | Description | Length | Width | Units | Unit Price | AYB | Repl Cost | % Good Condition | Dpr Value* | Final Value |
---|---|---|---|---|---|---|---|---|---|---|
BBW3 | FENCE-BARB WIRE 2-3 STR LOW | 800.00 | $5 | 2007 | $3,912 | 73% | $2,856 | $2,856 | ||
CLGSWG15 | GATE-C/L15'WIDE SWINGING CLASS=HGT | 4.00 | $1,532 | 2007 | $6,129 | 73% | $4,474 | $4,474 | ||
FBRGLSPL | LIGHT POLE FIBERGLASS L/FT | 150.00 | $132 | 2007 | $19,751 | 73% | $14,418 | $14,418 | ||
MHYDLTS | LIGHTS - METAL HALIDE, COST PER EA | 5.00 | $1,724 | 2007 | $8,620 | 73% | $6,293 | $6,293 | ||
ASPHC | ASPH COMMERCIAL | 3924.00 | $10 | 2007 | $38,063 | 73% | $27,786 | $27,786 | ||
PRKBMPC | PARKING BUMPERS PRECAST CONC - LF | 10.00 | $9 | 2012 | $89 | 81% | $71 | $71 | ||
BOLLARD | PARKING BARRIER POSTS/BOLLARDS | 148.00 | $189 | 2012 | $27,991 | 81% | $22,533 | $22,533 | ||
PLFN3 | FENCE - 2 OR 3 POLES LOW | 36.00 | $13 | 2012 | $476 | 81% | $383 | $383 | ||
WIF | FENCE - RES WR/IRON,STEEL,ALUM, PER SF | 73.00 | $12 | 2012 | $887 | 81% | $714 | $714 | ||
MTLRAIL | FENCE - CMML METAL GUARD RAIL | 88.00 | $40 | 2012 | $3,476 | 81% | $2,798 | $2,798 | ||
CC/L6T | FENCE CC/L 6' W/ TOPRAIL | 360.00 | $28 | 2012 | $10,069 | 81% | $8,106 | $8,106 | ||
CCBW3 | FENCE CC/L 3' BARBWIRE | 380.00 | $5 | 2012 | $1,843 | 81% | $1,484 | $1,484 | ||
CLGSW20E | GATE-C/L20'SWING W/ELECTRIC OPEN | 1.00 | $2,428 | 2012 | $2,428 | 81% | $1,954 | $1,954 | ||
ELEC | HKUP ELECTRICAL HOOKUP ONLY | 11.00 | $1,692 | 2012 | $18,612 | 81% | $14,983 | $14,983 | ||
MVL | LIGHTS - MERCURY VAPOR, COST P/EACH | 18.00 | $1,532 | 2012 | $27,576 | 81% | $22,199 | $22,199 | ||
STLPOLE | LIGHT POLE - STEEL P/LF | 40.00 | $101 | 2012 | $4,022 | 81% | $3,238 | $3,238 | ||
FBRGLSPL | LIGHT POLE FIBERGLASS L/FT | 60.00 | $132 | 2012 | $7,900 | 81% | $6,360 | $6,360 | ||
MHYDLTS | LIGHTS - METAL HALIDE, COST PER EA | 2.00 | $1,724 | 2012 | $3,448 | 81% | $2,776 | $2,776 | ||
C6 | CURBING 6"CONCRETE NO GUTTER PER LF | 211.00 | $15 | 2012 | $3,076 | 81% | $2,476 | $2,476 | ||
CG1 | CURBING 6"CONCRETE W/1'GUTTER PER LF | 164.00 | $22 | 2012 | $3,529 | 81% | $2,841 | $2,841 | ||
MCHDKLEV | MECHANICAL DOCK LEVELOR | 11.00 | $5,758 | 2012 | $63,338 | 81% | $50,987 | $50,987 | ||
ASPHC | ASPH COMMERCIAL | 10152.00 | $10 | 2012 | $98,474 | 81% | $79,272 | $79,272 | ||
CPRKLOT | PARKING LOT-8" CFW | 8188.00 | $11 | 2012 | $91,378 | 81% | $73,559 | $73,559 | ||
CFW | CONC FLATWORK | 5210.00 | $6 | 2012 | $31,521 | 81% | $25,374 | $25,374 | ||
COP2 | PORCH-CONCRETE OPEN W/STEPS | 253.00 | $18 | 2012 | $4,518 | 81% | $3,637 | $3,637 | ||
MCCP1 | PORCH-CONCRETE,COVERED W/PREFORMED METAL | 10 | 12 | 120.00 | $28 | 2012 | $3,314 | 81% | $2,668 | $2,668 |
SHPDCK3C | DOCK SHIP 3C LOAD STEEL/CONC | 11 | 60 | 660.00 | $39 | 2012 | $25,931 | 81% | $20,875 | $20,875 |
PATIOA | PATIO RF-ALUMINUM | 1672.00 | $14 | 2012 | $23,676 | 81% | $19,059 | $19,059 | ||
STAIRSTL | STAIRS-STEEL AVG 1 FLIGHT | 1.00 | $3,287 | 2012 | $3,287 | 81% | $2,646 | $2,646 | ||
RAMP1 | WALKWAY RAMP CONCRETE P/SF | 343.00 | $35 | 2012 | $12,008 | 81% | $9,667 | $9,667 | ||
RAILC | WALKWAY ADD STEEL RAILS P/LF | 120.00 | $66 | 2012 | $7,972 | 81% | $6,417 | $6,417 | ||
DHFL1 | FLOOR-DOCK HEIGHT FLOORS-SF | 7490.00 | $9 | 2012 | $71,079 | 81% | $57,218 | $57,218 | ||
XGUT | GUTTER - CONCRETE CROSS, AT INTERSECTION | 5 | 295 | 1475.00 | $11 | 2012 | $16,137 | 81% | $12,990 | $12,990 |
CFW | CONC FLATWORK | 14 | 88 | 1232.00 | $6 | 2012 | $7,946 | 81% | $6,397 | $6,397 |
CC/L6T | FENCE CC/L 6' W/ TOPRAIL | 740.00 | $28 | 2007 | $20,698 | 73% | $15,109 | $15,109 |
Land Lines
Personal Property
Account | Secured/ Unsecured | Owner | Description |
---|---|---|---|
BU208017 | Unsecured | FEDEX FREIGHT INC ELK/151 | BU - BUSINESS EQUIPMENT |
Disclaimer
All parcel data on this page is for use by the Elko County Assessor for assessment purposes only. The summary data on this page may not be a complete representation of the parcel or of the improvements thereon. Building information, including unit counts and number of permitted units, should be verified with the appropriate building and planning agencies. Zoning information should be verified with the appropriate planning agency. All parcels are reappraised each year. This is a true and accurate copy of the records of the Elko County Assessor's Office as of November 24, 2024.