Parcel 001-610-041
Owners
MONTE CARLO ASSOCIATES LLC
ATTN: CRISSY FOWLER
1700 N DECATUR BLVD
LAS VEGAS, NV 89108-2200
Parcel Summary
Location | 505 COPPER ST ELKO CITY, NV |
---|---|
Use Code | 330: Five or More Units - Low Rise |
Tax District | 11.0: City of Elko |
Map Parcel | 290995 P2 |
Acreage | 8.5600 |
Plat Maps | 001-610Ind.pdf (1,213kb) 001-610P2.pdf (774kb) 001-610P3.pdf (744kb) 001-610S1.pdf (2,289kb) 001-610S2.pdf (45kb) 001-610S3.pdf (5,715kb) 001-610S4.pdf (377kb) |
Value History
2024 | 2023 | 2022 | 2021 | 2020 | 2019 | 2018 | |
---|---|---|---|---|---|---|---|
Total Building Value | $3,481,027 | $3,621,311 | $3,224,140 | $3,130,811 | $3,180,163 | $3,092,440 | $3,108,060 |
Total Extra Features Value | $585,547 | $0 | $0 | $0 | $0 | $0 | $0 |
Total Secured Pers Prop | $0 | $0 | $0 | $0 | $0 | $0 | $0 |
Total Land Value | $299,600 | $299,600 | $299,600 | $299,600 | $299,600 | $299,600 | $299,600 |
Taxable Value | $4,366,174 | $3,920,911 | $3,523,740 | $3,430,411 | $3,479,763 | $3,392,040 | $3,407,660 |
Net Exemptions Value | $0 | $0 | $0 | $0 | $0 | $0 | $0 |
Net Assessed Value | $1,528,161 | $1,372,319 | $1,233,309 | $1,200,644 | $1,217,917 | $1,187,214 | $1,192,681 |
New Improvements | $0 | $0 | $43,809 | $0 | $0 | $0 | $0 |
New Land | $0 | $0 | $0 | $0 | $0 | $0 | $0 |
Document/Transfer/Sales History
Buildings
Building # 1, Section # 1, LOW-RISE MULTIPLE, Low-Rise Multiple
Type | Model | Heated Sq Ft | Repl Cost New | YrBlt | WAY | Other % Dpr | Normal % Dpr | % Cond | Value |
---|---|---|---|---|---|---|---|---|---|
RES | 03 | 7792 | $874,952 | 1990 | 1990 | 0.00% | 52.50% | 47.50% | $415,602 |
Structural Elements
Type | Description | Code | Details |
---|---|---|---|
ROOF | ROOF | 0208 | Composition Shingle |
EW | EXT WALL | 0107 | Frame, Siding, Vinyl |
HEAT | HEAT | 0351 | Warmed & Cooled Air |
0502 | Automatic Appliance Allowance | 1.00 | |
0601 | Plumbing Fixtures -# | 72.00 | |
0602 | Plumbing Fixtures Rough-ins -# | 8.00 | |
SBFL | SubFloor (RES) | 0622 | Raised Subfloor (%) |
HILL | Hillside Slope Adjustment | 1 | Flat |
M#UNITS | Number of MultiFamily Units | 8.00 | |
0402 | Automatic Floor Cover Allowance | 1.00 | |
0901 | Open Slab Porch (SF) | 984.00 | |
1001 | Cement Balcony (SF) | 144.00 | |
1002 | Wood Balcony (SF) | 384.00 | |
1020 | Steel Stairway (FLT) | 2.00 | |
BED | Bedrooms | 124.00 | |
BTHF | Bath-Full | 124.00 | |
LIV | # Living Units | 64.00 |
Building # 2, Section # 1, LOW-RISE MULTIPLE, Low-Rise Multiple
Type | Model | Heated Sq Ft | Repl Cost New | YrBlt | WAY | Other % Dpr | Normal % Dpr | % Cond | Value |
---|---|---|---|---|---|---|---|---|---|
RES | 03 | 7792 | $874,952 | 1990 | 1990 | 0.00% | 52.50% | 47.50% | $415,602 |
Structural Elements
Type | Description | Code | Details |
---|---|---|---|
ROOF | ROOF | 0208 | Composition Shingle |
EW | EXT WALL | 0107 | Frame, Siding, Vinyl |
HEAT | HEAT | 0351 | Warmed & Cooled Air |
0502 | Automatic Appliance Allowance | 1.00 | |
0601 | Plumbing Fixtures -# | 72.00 | |
0602 | Plumbing Fixtures Rough-ins -# | 8.00 | |
SBFL | SubFloor (RES) | 0622 | Raised Subfloor (%) |
HILL | Hillside Slope Adjustment | 1 | Flat |
M#UNITS | Number of MultiFamily Units | 8.00 | |
0402 | Automatic Floor Cover Allowance | 1.00 | |
0901 | Open Slab Porch (SF) | 984.00 | |
1001 | Cement Balcony (SF) | 144.00 | |
1002 | Wood Balcony (SF) | 384.00 | |
1020 | Steel Stairway (FLT) | 2.00 |
Building # 3, Section # 1, LOW-RISE MULTIPLE, Low-Rise Multiple
Type | Model | Heated Sq Ft | Repl Cost New | YrBlt | WAY | Other % Dpr | Normal % Dpr | % Cond | Value |
---|---|---|---|---|---|---|---|---|---|
RES | 03 | 7792 | $874,952 | 1990 | 1990 | 0.00% | 52.50% | 47.50% | $415,602 |
Structural Elements
Type | Description | Code | Details |
---|---|---|---|
ROOF | ROOF | 0208 | Composition Shingle |
EW | EXT WALL | 0107 | Frame, Siding, Vinyl |
HEAT | HEAT | 0351 | Warmed & Cooled Air |
0502 | Automatic Appliance Allowance | 1.00 | |
0601 | Plumbing Fixtures -# | 72.00 | |
0602 | Plumbing Fixtures Rough-ins -# | 8.00 | |
SBFL | SubFloor (RES) | 0622 | Raised Subfloor (%) |
HILL | Hillside Slope Adjustment | 1 | Flat |
M#UNITS | Number of MultiFamily Units | 8.00 | |
0402 | Automatic Floor Cover Allowance | 1.00 | |
0901 | Open Slab Porch (SF) | 984.00 | |
1001 | Cement Balcony (SF) | 144.00 | |
1002 | Wood Balcony (SF) | 384.00 | |
1020 | Steel Stairway (FLT) | 2.00 |
Building # 4, Section # 1, LOW-RISE MULTIPLE, Low-Rise Multiple
Type | Model | Heated Sq Ft | Repl Cost New | YrBlt | WAY | Other % Dpr | Normal % Dpr | % Cond | Value |
---|---|---|---|---|---|---|---|---|---|
RES | 03 | 7792 | $874,627 | 1990 | 1990 | 0.00% | 52.50% | 47.50% | $415,448 |
Structural Elements
Type | Description | Code | Details |
---|---|---|---|
ROOF | ROOF | 0208 | Composition Shingle |
EW | EXT WALL | 0107 | Frame, Siding, Vinyl |
HEAT | HEAT | 0351 | Warmed & Cooled Air |
0502 | Automatic Appliance Allowance | 1.00 | |
0601 | Plumbing Fixtures -# | 72.00 | |
0602 | Plumbing Fixtures Rough-ins -# | 8.00 | |
SBFL | SubFloor (RES) | 0622 | Raised Subfloor (%) |
HILL | Hillside Slope Adjustment | 1 | Flat |
M#UNITS | Number of MultiFamily Units | 8.00 | |
0402 | Automatic Floor Cover Allowance | 1.00 | |
0901 | Open Slab Porch (SF) | 948.00 | |
1001 | Cement Balcony (SF) | 144.00 | |
1002 | Wood Balcony (SF) | 384.00 | |
1020 | Steel Stairway (FLT) | 2.00 |
Building # 5, Section # 1, LOW-RISE MULTIPLE, Low-Rise Multiple
Type | Model | Heated Sq Ft | Repl Cost New | YrBlt | WAY | Other % Dpr | Normal % Dpr | % Cond | Value |
---|---|---|---|---|---|---|---|---|---|
RES | 03 | 7792 | $864,565 | 1990 | 1990 | 0.00% | 52.50% | 47.50% | $410,668 |
Structural Elements
Type | Description | Code | Details |
---|---|---|---|
ROOF | ROOF | 0208 | Composition Shingle |
EW | EXT WALL | 0107 | Frame, Siding, Vinyl |
HEAT | HEAT | 0351 | Warmed & Cooled Air |
0502 | Automatic Appliance Allowance | 1.00 | |
0601 | Plumbing Fixtures -# | 64.00 | |
0602 | Plumbing Fixtures Rough-ins -# | 8.00 | |
SBFL | SubFloor (RES) | 0622 | Raised Subfloor (%) |
HILL | Hillside Slope Adjustment | 1 | Flat |
M#UNITS | Number of MultiFamily Units | 8.00 | |
0402 | Automatic Floor Cover Allowance | 1.00 | |
0901 | Open Slab Porch (SF) | 984.00 | |
1001 | Cement Balcony (SF) | 144.00 | |
1002 | Wood Balcony (SF) | 384.00 | |
1020 | Steel Stairway (FLT) | 2.00 |
Building # 6, Section # 1, LOW-RISE MULTIPLE, Low-Rise Multiple
Type | Model | Heated Sq Ft | Repl Cost New | YrBlt | WAY | Other % Dpr | Normal % Dpr | % Cond | Value |
---|---|---|---|---|---|---|---|---|---|
RES | 03 | 7792 | $864,565 | 1990 | 1990 | 0.00% | 52.50% | 47.50% | $410,668 |
Structural Elements
Type | Description | Code | Details |
---|---|---|---|
ROOF | ROOF | 0208 | Composition Shingle |
EW | EXT WALL | 0107 | Frame, Siding, Vinyl |
HEAT | HEAT | 0351 | Warmed & Cooled Air |
0502 | Automatic Appliance Allowance | 1.00 | |
0601 | Plumbing Fixtures -# | 64.00 | |
0602 | Plumbing Fixtures Rough-ins -# | 8.00 | |
SBFL | SubFloor (RES) | 0622 | Raised Subfloor (%) |
HILL | Hillside Slope Adjustment | 1 | Flat |
M#UNITS | Number of MultiFamily Units | 8.00 | |
0402 | Automatic Floor Cover Allowance | 1.00 | |
0901 | Open Slab Porch (SF) | 984.00 | |
1001 | Cement Balcony (SF) | 144.00 | |
1002 | Wood Balcony (SF) | 384.00 | |
1020 | Steel Stairway (FLT) | 2.00 |
Building # 7, Section # 1, LOW-RISE MULTIPLE, Low-Rise Multiple
Type | Model | Heated Sq Ft | Repl Cost New | YrBlt | WAY | Other % Dpr | Normal % Dpr | % Cond | Value |
---|---|---|---|---|---|---|---|---|---|
RES | 03 | 7792 | $864,565 | 1990 | 1990 | 0.00% | 52.50% | 47.50% | $410,668 |
Structural Elements
Type | Description | Code | Details |
---|---|---|---|
ROOF | ROOF | 0208 | Composition Shingle |
EW | EXT WALL | 0107 | Frame, Siding, Vinyl |
HEAT | HEAT | 0351 | Warmed & Cooled Air |
0502 | Automatic Appliance Allowance | 1.00 | |
0601 | Plumbing Fixtures -# | 64.00 | |
0602 | Plumbing Fixtures Rough-ins -# | 8.00 | |
SBFL | SubFloor (RES) | 0622 | Raised Subfloor (%) |
HILL | Hillside Slope Adjustment | 1 | Flat |
M#UNITS | Number of MultiFamily Units | 8.00 | |
0402 | Automatic Floor Cover Allowance | 1.00 | |
0901 | Open Slab Porch (SF) | 984.00 | |
1001 | Cement Balcony (SF) | 144.00 | |
1002 | Wood Balcony (SF) | 384.00 | |
1020 | Steel Stairway (FLT) | 2.00 |
Building # 8, Section # 1, LOW-RISE MULTIPLE, Low-Rise Multiple
Type | Model | Heated Sq Ft | Repl Cost New | YrBlt | WAY | Other % Dpr | Normal % Dpr | % Cond | Value |
---|---|---|---|---|---|---|---|---|---|
RES | 03 | 7792 | $864,565 | 1990 | 1990 | 0.00% | 52.50% | 47.50% | $410,668 |
Structural Elements
Type | Description | Code | Details |
---|---|---|---|
ROOF | ROOF | 0208 | Composition Shingle |
EW | EXT WALL | 0107 | Frame, Siding, Vinyl |
HEAT | HEAT | 0351 | Warmed & Cooled Air |
0502 | Automatic Appliance Allowance | 1.00 | |
0601 | Plumbing Fixtures -# | 64.00 | |
0602 | Plumbing Fixtures Rough-ins -# | 8.00 | |
SBFL | SubFloor (RES) | 0622 | Raised Subfloor (%) |
HILL | Hillside Slope Adjustment | 1 | Flat |
M#UNITS | Number of MultiFamily Units | 8.00 | |
0402 | Automatic Floor Cover Allowance | 1.00 | |
0901 | Open Slab Porch (SF) | 984.00 | |
1001 | Cement Balcony (SF) | 144.00 | |
1002 | Wood Balcony (SF) | 384.00 | |
1020 | Steel Stairway (FLT) | 2.00 |
Extra Features
Code | Description | Length | Width | Units | Unit Price | AYB | Repl Cost | % Good Condition | Dpr Value* | Final Value |
---|---|---|---|---|---|---|---|---|---|---|
SH T1F1 | SHED W/FLOOR COSTS, ALL SIDES CLOSED | 8 | 40 | 320.00 | $24 | 2021 | $7,676 | 94% | $7,216 | $7,216 |
GAR HB2 | GARAGE-DET HARD BOARD SIDING | 600.00 | $44 | 2009 | $26,328 | 76% | $20,009 | $20,009 | ||
SH T2F2 | SHED W/FLOOR, ONE SIDE OPEN | 559.00 | $25 | 2021 | $14,193 | 94% | $13,341 | $13,341 | ||
ASPHC | ASPH COMMERCIAL | 88650.00 | $10 | 1990 | $859,905 | 48% | $408,455 | $408,455 | ||
CFW | CONC FLATWORK | 12288.00 | $6 | 1990 | $74,342 | 48% | $35,313 | $35,313 | ||
GARSIW3 | GARAGE-DET WOOD SIDING | 20 | 24 | 480.00 | $54 | 1991 | $26,017 | 49% | $12,748 | $12,748 |
SH T11 | SHED SMALL/PUMPHOUSE-I,ALL SIDES CLOSED | 300.00 | $19 | 1990 | $5,685 | 48% | $2,700 | $2,700 | ||
XGUT | GUTTER - CONCRETE CROSS, AT INTERSECTION | 3402.00 | $11 | 1990 | $37,218 | 48% | $17,678 | $17,678 | ||
CG1 | CURBING 6"CONCRETE W/1'GUTTER PER LF | 3409.00 | $22 | 1990 | $73,362 | 48% | $34,847 | $34,847 | ||
SH T1F1 | SHED W/FLOOR COSTS, ALL SIDES CLOSED | 8 | 40 | 320.00 | $24 | 2020 | $7,676 | 93% | $7,100 | $7,100 |
SH T1F1 | SHED W/FLOOR COSTS, ALL SIDES CLOSED | 8 | 40 | 320.00 | $24 | 2021 | $7,676 | 94% | $7,216 | $7,216 |
Land Lines
Personal Property
None
Disclaimer
All parcel data on this page is for use by the Elko County Assessor for assessment purposes only. The summary data on this page may not be a complete representation of the parcel or of the improvements thereon. Building information, including unit counts and number of permitted units, should be verified with the appropriate building and planning agencies. Zoning information should be verified with the appropriate planning agency. All parcels are reappraised each year. This is a true and accurate copy of the records of the Elko County Assessor's Office as of November 24, 2024.