Parcel 001-630-045
Owners
MODERN CONCRETE INC
1770 SHARP ACCESS RD
ELKO, NV 89801-4023
Parcel Summary
Location | 1770 SHARPS ACCESS RD ELKO CITY, NV |
---|---|
Use Code | 500: General Industrial - light industry, trucking and warehousing, service, repair, etc. |
Tax District | 11.0: City of Elko |
Map Parcel | 383079 P3 |
Acreage | 9.7700 |
Plat Maps | 001-630.pdf (1,675kb) |
Keyline Description
PARCEL 3 FILE 383079LOCATED IN
SEC/LOT: 11,14 TWN/BLOCK: 34N RNG: 55E ACRES: 0.00
MDB&M
FORMERLY A PORTION OF 001-630-030
NOW PER BLA ROS FILE 683204 THIS PARCEL IS ALL
OF PARCEL 3 FILE 383079 AND PART OF PARCEL 3 OF
MAP FILE 419689. NEW DESCRIPTIONS SHOWN ON
DOC 686344 AND IS AS FOLLOWS:
BEG AT THE E'LY MOST COR OF SAID PARCEL 3
FILE NUMBER 383079, WHICH BEARS S 82¦49'47" W
1876.52' FROM THE NE COR OF SEC 14/34N/R55E
MDB&M;
TH: S 46¦18'15" W 658.69';
TH: N 63¦63'43" W 574.87' M/L TO THE E'LY EDGE
OF THE PRIVATE ACCESS KNOW AS SHARPS ACCESS;
TH: ALONG SHARPS ACCESS N 26¦29'17" E 619.68'
TH: LEAVING SHARPS ACCESS S 63¦30'43" E 798.17'
M/L TO THE POB.
CONT:
ACRES: 9.77
Value History
2025 | 2024 | 2023 | 2022 | 2021 | 2020 | 2019 | |
---|---|---|---|---|---|---|---|
Total Building Value | $110,895 | $114,586 | $253,854 | $170,414 | $162,506 | $164,606 | $166,711 |
Total Extra Features Value | $165,917 | $167,416 | $0 | $0 | $0 | $0 | $0 |
Total Secured Pers Prop | $0 | $0 | $0 | $0 | $0 | $0 | $0 |
Total Land Value | $293,100 | $293,100 | $293,100 | $293,100 | $293,100 | $293,100 | $293,100 |
Taxable Value | $569,912 | $575,102 | $546,954 | $463,514 | $455,606 | $457,706 | $459,811 |
Net Exemptions Value | $0 | $0 | $0 | $0 | $0 | $0 | $0 |
Net Assessed Value | $199,469 | $201,286 | $191,434 | $162,230 | $159,462 | $160,197 | $160,934 |
New Improvements | $0 | $0 | $54,086 | $0 | $0 | $0 | $0 |
New Land | $0 | $0 | $0 | $0 | $0 | $0 | $0 |
Document/Transfer/Sales History
Buildings
Building # 1, Section # 1, WAREHOUSE, Storage Warehouse
Extra Features
Code | Description | Length | Width | Units | Unit Price | AYB | Repl Cost | % Good Condition | Dpr Value* | Final Value |
---|---|---|---|---|---|---|---|---|---|---|
CFW | CONC FLATWORK | 648.00 | $7.26 | 2000 | $4,704 | 63% | $2,940 | $2,940 | ||
MVL | LIGHTS - MERCURY VAPOR, COST P/EACH | 3.00 | $1,532.00 | 2000 | $4,596 | 63% | $2,873 | $2,873 | ||
PATIOA | PATIO RF-ALUMINUM | 480.00 | $14.16 | 2000 | $6,797 | 63% | $4,248 | $4,248 | ||
CFW | CONC FLATWORK | 768.00 | $7.26 | 2000 | $5,576 | 63% | $3,485 | $3,485 | ||
ELKOHK | HKUP ELKO CITY MH HKUP W/SEWER/WATER SYS | 1.00 | $9,328.00 | 2008 | $9,328 | 75% | $6,949 | $6,949 | ||
C6 | CURBING 6"CONCRETE NO GUTTER PER LF | 140.00 | $14.58 | 2008 | $2,041 | 75% | $1,521 | $1,521 | ||
RAMP1 | WALKWAY RAMP CONCRETE P/SF | 280.00 | $35.01 | 2008 | $9,803 | 75% | $7,303 | $7,303 | ||
RAILC | WALKWAY ADD STEEL RAILS P/LF | 84.00 | $66.43 | 2008 | $5,580 | 75% | $4,157 | $4,157 | ||
SIDEEN | SHED SIDE W/ENCLOSED SIDES | 8 | 12 | 96.00 | $15.62 | 2008 | $1,500 | 75% | $1,117 | $1,117 |
PRKBMPC | PARKING BUMPERS PRECAST CONC - LF | 60.00 | $8.88 | 2008 | $533 | 75% | $397 | $397 | ||
SHPDCK3S | DOCK LOAD 3S WD/STEEL FRAME | 462.00 | $38.94 | 2008 | $17,990 | 75% | $13,403 | $13,403 | ||
SHPDCK8S | DOCK LOAD 8S WD/STL FRAME | 156.00 | $22.09 | 2008 | $3,446 | 75% | $2,567 | $2,567 | ||
CPRKLOT | PARKING LOT-8" CFW | 4416.00 | $11.16 | 2008 | $49,283 | 75% | $36,716 | $36,716 | ||
SH T13 | SHED SMALL/PUMPHOUSE-I,ALL SIDES CLOSED | 16 | 28 | 448.00 | $28.12 | 2014 | $12,598 | 84% | $10,519 | $10,519 |
SH T1F1 | SHED W/FLOOR COSTS, ALL SIDES CLOSED | 8 | 20 | 160.00 | $27.42 | 2014 | $4,387 | 84% | $3,663 | $3,663 |
SH T1F1 | SHED W/FLOOR COSTS, ALL SIDES CLOSED | 8 | 40 | 320.00 | $23.99 | 2014 | $7,676 | 84% | $6,410 | $6,410 |
SH T1F2 | SHED W/FLOOR COSTS, ALL SIDES CLOSED | 10 | 20 | 200.00 | $35.57 | 2017 | $7,114 | 88% | $6,260 | $6,260 |
CPRKLOT6 | PARKING LOT 6" CFW | 3631.00 | $9.77 | 2017 | $35,475 | 88% | $31,218 | $31,218 | ||
SH T1F1 | SHED W/FLOOR COSTS, ALL SIDES CLOSED | 8 | 20 | 160.00 | $27.42 | 2019 | $4,387 | 91% | $3,992 | $3,992 |
CFW | CONC FLATWORK | 927.00 | $7.26 | 2020 | $6,730 | 93% | $6,225 | $6,225 | ||
SH T1F1 | SHED W/FLOOR COSTS, ALL SIDES CLOSED | 8 | 20 | 160.00 | $27.42 | 2021 | $4,387 | 94% | $4,124 | $4,124 |
ELKOHK | HKUP ELKO CITY MH HKUP W/SEWER/WATER SYS | 1.00 | $9,328.00 | 2000 | $9,328 | 63% | $5,830 | $5,830 |
Land Lines
Personal Property
Account | Secured/ Unsecured | Owner | Description |
---|---|---|---|
BU069718 | Unsecured | MODERN CONCRETE INC | BU - BUSINESS EQUIPMENT |
BU240107 | Unsecured | DESERT GOLD PRECAST | BU - BUSINESS EQUIPMENT |
TU247236 | Unsecured | MODERN CONCRETE INC | TU - TRAILERS / MOBILE HOMES |
TUT2001R | Unsecured | MODERN CONCRETE INC | TU - TRAILERS / MOBILE HOMES |
Disclaimer
All parcel data on this page is for use by the Elko County Assessor for assessment purposes only. The summary data on this page may not be a complete representation of the parcel or of the improvements thereon. Building information, including unit counts and number of permitted units, should be verified with the appropriate building and planning agencies. Zoning information should be verified with the appropriate planning agency. All parcels are reappraised each year. This is a true and accurate copy of the records of the Elko County Assessor's Office as of April 19, 2025.