Parcel 005-060-008

Owners

SOUTHWEST ENERGY LLC

2040 W GARDNER LN
TUCSON, AZ 85705-2208

Parcel Summary

Location 2781 STATE ROUTE 766
NV
Use Code 696: Agricultural Deferred with Industrial
Tax District 1.0: County of Elko
Acreage 641.0000
Section 11
Township 33N
Range 52E
Plat Maps 005-060.pdf (1,395kb)

Value History

2025202420232022202120202019
Total Building Value$1,416,223$1,466,825$2,307,429$0$0$0$0
Total Extra Features Value$1,394,733$1,435,360$0$0$0$0$0
Total Secured Pers Prop$0$0$0$0$0$0$0
Total Land Value$81,974$82,145$6,380$5,869$5,503$5,649$6,106
Taxable Value$2,892,930$2,984,330$2,313,809$5,869$5,503$5,649$6,106
Net Exemptions Value$0$0$0$0$0$0$0
Net Assessed Value$1,012,526$1,044,516$809,833$2,054$1,926$1,977$2,137
New Improvements$0$305,924$2,307,429$0$0$0$0
New Land$0$0$0$0$0$0$0

Document/Transfer/Sales History

Instrument /
Official Record
DateTypeV/IDcl ValueOwnership
M 7456062018-09-04Vacant$357,056Grantor: NEW NEVADA LANDS LLC
Grantee: SOUTHWEST ENERGY LLC
M 7456062018-09-04Vacant$357,056Grantor: NEW NEVADA LANDS LLC
Grantee: SOUTHWEST ENERGY LLC
M 6493732011-11-30Vacant$1Grantor: NEW NEVADA LANDS LLC
Grantee: NEW NEVADA LANDS LLC
950-7151996-08-05Vacant$0Grantor: NULL
Grantee: NEV LAND & RESOURCE CO
0950007151996-08-05Vacant$1Grantee: NEV LAND & RESOURCE CO

Buildings

Building # 1, Section # 1, EMULSIONS BUILDING, Industrials, Light Mftg.

TypeModelHeated Sq FtRepl Cost NewYrBltWAYOther % DprNormal % Dpr% CondValue
COMM4949800$1,200,402202320230.00%4.50%95.50%$1,146,384

Structural Elements

TypeDescriptionCodeDetails
EW_CEXT WALL-Commercial916Single Wall - Metal On Steel Frame
HEAT_CHEAT-Commercial612Warm/Cool Air
STNumber of Stories (COMM)1.00
WHAverage Wall Height (COMM)24.00
683Sprinkler System Wet - Commercial9800.00
764Fire Alarm System9800.00

Sub Areas

TypeGross AreaPercent of BaseAdjusted Area
GBA9,800100%9,800

Building # 2, Section # 1, BOILER BUILDING, Lt. Commercial Utility Build.

TypeModelHeated Sq FtRepl Cost NewYrBltWAYOther % DprNormal % Dpr% CondValue
COMM4711680$89,745202320230.00%4.50%95.50%$85,706

Structural Elements

TypeDescriptionCodeDetails
EW_CEXT WALL-Commercial916Single Wall - Metal On Steel Frame
HEAT_CHEAT-Commercial649No HVAC
STNumber of Stories (COMM)1.00
WHAverage Wall Height (COMM)18.00
683Sprinkler System Wet - Commercial1680.00
764Fire Alarm System1680.00

Sub Areas

TypeGross AreaPercent of BaseAdjusted Area
GBA1,680100%1,680

Building # 3, Section # 1, STORAGE BLDG, Lt. Commercial Utility Build.

TypeModelHeated Sq FtRepl Cost NewYrBltWAYOther % DprNormal % Dpr% CondValue
COMM471760$45,411202320230.00%4.50%95.50%$43,368

Structural Elements

TypeDescriptionCodeDetails
EW_CEXT WALL-Commercial916Single Wall - Metal On Steel Frame
HEAT_CHEAT-Commercial649No HVAC
STNumber of Stories (COMM)1.00
WHAverage Wall Height (COMM)17.00
683Sprinkler System Wet - Commercial760.00
764Fire Alarm System760.00

Sub Areas

TypeGross AreaPercent of BaseAdjusted Area
GBA760100%760

Building # 4, Section # 1, EMULSIONS BUILDING, Maintenance Storage Building

TypeModelHeated Sq FtRepl Cost NewYrBltWAYOther % DprNormal % Dpr% CondValue
COMM157896$104,975202320230.00%4.50%95.50%$100,251

Structural Elements

TypeDescriptionCodeDetails
EW_CEXT WALL-Commercial812Concrete Block
HEAT_CHEAT-Commercial606Space Heater
STNumber of Stories (COMM)1.00
WHAverage Wall Height (COMM)11.00

Sub Areas

TypeGross AreaPercent of BaseAdjusted Area
GBA896100%896

Extra Features

*RCNLD: Replacement Cost New, Less Depreciation

CodeDescriptionLengthWidthUnitsUnit PriceAYBRepl Cost% Good ConditionDpr Value*Final Value
SHPDCK7DDOCK LOAD RAMP 7D PAVED RAMP CLS D-P1092.00$69.922023$76,35396%$72,917$72,917
CPRKLOT6PARKING LOT 6" CFW131201560.00$9.872023$15,39796%$14,704$14,704
CFWCFCFW CUBIC FT-TANK #1 @ RAILPORT 30'DPTH1320.00$12.512023$16,51396%$15,770$15,770
CPRKLOT6PARKING LOT 6" CFW40401600.00$9.872023$15,79296%$15,081$15,081
COP2PORCH-CONCRETE OPEN W/STEPS61166.00$24.872023$1,64196%$1,568$1,568
SHPDCK8DDOCK LOAD 8D WELL EXCAVATED CLS D-P62704340.00$22.602023$98,08496%$93,670$93,670
HYDCKLEVHYDRAULIC DOCK LEVELORS3.00$10,184.002023$30,55296%$29,177$29,177
MVLLIGHTS - MERCURY VAPOR, COST P/EACH13.00$1,548.002023$20,12496%$19,218$19,218
CFWCFCFW CUBIC FT-TANK #1 @ RAILPORT 30'DPTH56884928.00$12.512023$61,64996%$58,875$58,875
CFWCFCFW CUBIC FT-TANK #1 @ RAILPORT 30'DPTH3172.00$12.512023$39,68296%$37,896$37,896
RETAINWALL-RETAINING 8" PRECAST1152.00$24.462023$28,17896%$26,910$26,910
CFWCONC FLATWORK1472.00$6.462023$9,50996%$9,081$9,081
MVLLIGHTS - MERCURY VAPOR, COST P/EACH5.00$1,548.002023$7,74096%$7,392$7,392
CPRKLOT6PARKING LOT 6" CFW56663696.00$9.872023$36,48096%$34,838$34,838
CFWCFCFW CUBIC FT-TANK #1 @ RAILPORT 30'DPTH2324.00$12.512023$29,07396%$27,765$27,765
RETAINWALL-RETAINING 8" PRECAST1128.00$24.462023$27,59196%$26,349$26,349
MVLLIGHTS - MERCURY VAPOR, COST P/EACH1.00$1,548.002023$1,54896%$1,478$1,478
BOLLARDPARKING BARRIER POSTS/BOLLARDS4.00$191.042023$76496%$730$730
PIPE8UTILITY PIPING 8" PLASTIC1795.00$64.002023$114,88096%$109,710$109,710
TKB5BOLTED STEEL TANK 300,000 GAL1.00$393,398.002023$393,39896%$375,695$375,695
CC/L6TFENCE CC/L 6' W/ TOPRAIL2080.00$28.262023$58,78196%$56,136$56,136
CCBW3FENCE CC/L 3' BARBWIRE2120.00$4.902023$10,38896%$9,921$9,921
CLGSWG10GATE-C/L10'WIDE SWINGING CLASS=HGT2.00$1,197.012023$2,39496%$2,286$2,286
CLGSL20EGATE-C/L20'SLIDE W/ELECTRIC OPEN1.00$3,065.072023$3,06596%$2,927$2,927
ELOPENAGATE AUTO CONTROL DEVICE-VEHICLE DETECTR1.00$2,042.252023$2,04296%$1,950$1,950
CC/L6TFENCE CC/L 6' W/ TOPRAIL570.00$28.262023$16,10896%$15,383$15,383
CCBW3FENCE CC/L 3' BARBWIRE610.00$4.902023$2,98996%$2,854$2,854
CLGSWG10GATE-C/L10'WIDE SWINGING CLASS=HGT4.00$1,197.012023$4,78896%$4,573$4,573
COMWELL2COMML WELL 8"-10" SYS PIPE CASING390.00$92.002022$35,88094%$33,727$33,727
SEPTICCSEPTIC SYS CMML 100L'LEACH LINE1.00$31,144.002023$31,14496%$29,743$29,743
TRSC70SCALES MOTOR TRUCK 70 TON1.00$116,189.002023$116,18996%$110,960$110,960
BOLLARDPARKING BARRIER POSTS/BOLLARDS6.00$191.042023$1,14696%$1,095$1,095
MVLLIGHTS - MERCURY VAPOR, COST P/EACH7.00$1,548.002023$10,83696%$10,348$10,348
CFWCONC FLATWORK212.00$6.062023$1,28596%$1,227$1,227
CFWCONC FLATWORK23079.00$6.062023$139,85996%$133,565$133,565

Land Lines

CodeDescriptionZoneFrontDepthUnitsUnit TypeRateAcreageSq FtTotal AdjValue
696Agricultural Deferred with IndustrialOS, M1, CUP1.00SITE$75,000.0050.0001.00$75,000
GRAZ3GRAZING 3rd CLASSOS, M1, CUP591.00GRAZ3$12.09591.0025,743,9601.00$7,145

Personal Property

AccountSecured/
Unsecured
OwnerDescription
BU250376UnsecuredSOUTHWEST ENERGY LLCBU - BUSINESS EQUIPMENT

Building Sketches

Disclaimer

All parcel data on this page is for use by the Elko County Assessor for assessment purposes only. The summary data on this page may not be a complete representation of the parcel or of the improvements thereon. Building information, including unit counts and number of permitted units, should be verified with the appropriate building and planning agencies. Zoning information should be verified with the appropriate planning agency. All parcels are reappraised each year. This is a true and accurate copy of the records of the Elko County Assessor's Office as of July 27, 2025.