Parcel 005-060-008
Owners
SOUTHWEST ENERGY LLC
2040 W GARDNER LN
TUCSON, AZ 85705-2208
Parcel Summary
Location | 2781 STATE ROUTE 766 NV |
---|---|
Use Code | 696: Agricultural Deferred with Industrial |
Tax District | 1.0: County of Elko |
Section | 11 |
Township | 33N |
Range | 52E |
Acreage | 641.0000 |
Plat Maps | 005-060.pdf (1,395kb) |
Value History
2024 | 2023 | 2022 | 2021 | 2020 | 2019 | 2018 | |
---|---|---|---|---|---|---|---|
Total Building Value | $1,466,825 | $2,307,429 | $0 | $0 | $0 | $0 | $0 |
Total Extra Features Value | $1,435,360 | $0 | $0 | $0 | $0 | $0 | $0 |
Total Secured Pers Prop | $0 | $0 | $0 | $0 | $0 | $0 | $0 |
Total Land Value | $82,145 | $6,380 | $5,869 | $5,503 | $5,649 | $6,106 | $6,600 |
Taxable Value | $2,984,330 | $2,313,809 | $5,869 | $5,503 | $5,649 | $6,106 | $6,600 |
Net Exemptions Value | $0 | $0 | $0 | $0 | $0 | $0 | $0 |
Net Assessed Value | $1,044,516 | $809,833 | $2,054 | $1,926 | $1,977 | $2,137 | $2,310 |
New Improvements | $305,924 | $2,307,429 | $0 | $0 | $0 | $0 | $0 |
New Land | $0 | $0 | $0 | $0 | $0 | $0 | $0 |
Document/Transfer/Sales History
Buildings
Building # 1, Section # 1, EMULSIONS BUILDING, Industrials, Light Mftg.
Building # 2, Section # 1, BOILER BUILDING, Lt. Commercial Utility Build.
Building # 3, Section # 1, STORAGE BLDG, Lt. Commercial Utility Build.
Building # 4, Section # 1, EMULSIONS BUILDING, Maintenance Storage Building
Extra Features
Code | Description | Length | Width | Units | Unit Price | AYB | Repl Cost | % Good Condition | Dpr Value* | Final Value |
---|---|---|---|---|---|---|---|---|---|---|
SHPDCK7D | DOCK LOAD RAMP 7D PAVED RAMP CLS D-P | 1092.00 | $69 | 2023 | $75,293 | 97% | $73,035 | $73,035 | ||
CPRKLOT6 | PARKING LOT 6" CFW | 13 | 120 | 1560.00 | $10 | 2023 | $15,241 | 97% | $14,784 | $14,784 |
CFWCF | CFW CUBIC FT-TANK #1 @ RAILPORT 30'DPTH | 1320.00 | $12 | 2023 | $16,038 | 97% | $15,557 | $15,557 | ||
CPRKLOT6 | PARKING LOT 6" CFW | 40 | 40 | 1600.00 | $10 | 2023 | $15,632 | 97% | $15,163 | $15,163 |
COP2 | PORCH-CONCRETE OPEN W/STEPS | 6 | 11 | 66.00 | $25 | 2023 | $1,641 | 97% | $1,592 | $1,592 |
SHPDCK8D | DOCK LOAD 8D WELL EXCAVATED CLS D-P | 62 | 70 | 4340.00 | $22 | 2023 | $95,871 | 97% | $92,994 | $92,994 |
HYDCKLEV | HYDRAULIC DOCK LEVELORS | 3.00 | $10,123 | 2023 | $30,369 | 97% | $29,458 | $29,458 | ||
MVL | LIGHTS - MERCURY VAPOR, COST P/EACH | 13.00 | $1,532 | 2023 | $19,916 | 97% | $19,319 | $19,319 | ||
CFWCF | CFW CUBIC FT-TANK #1 @ RAILPORT 30'DPTH | 56 | 88 | 4928.00 | $12 | 2023 | $59,875 | 97% | $58,079 | $58,079 |
CFWCF | CFW CUBIC FT-TANK #1 @ RAILPORT 30'DPTH | 3172.00 | $12 | 2023 | $38,540 | 97% | $37,384 | $37,384 | ||
RETAIN | WALL-RETAINING 8" PRECAST | 1152.00 | $24 | 2023 | $28,166 | 97% | $27,321 | $27,321 | ||
CFW | CONC FLATWORK | 1472.00 | $6 | 2023 | $9,494 | 97% | $9,210 | $9,210 | ||
MVL | LIGHTS - MERCURY VAPOR, COST P/EACH | 5.00 | $1,532 | 2023 | $7,660 | 97% | $7,430 | $7,430 | ||
CPRKLOT6 | PARKING LOT 6" CFW | 56 | 66 | 3696.00 | $10 | 2023 | $36,110 | 97% | $35,027 | $35,027 |
CFWCF | CFW CUBIC FT-TANK #1 @ RAILPORT 30'DPTH | 2324.00 | $12 | 2023 | $28,237 | 97% | $27,390 | $27,390 | ||
RETAIN | WALL-RETAINING 8" PRECAST | 1128.00 | $24 | 2023 | $27,580 | 97% | $26,752 | $26,752 | ||
MVL | LIGHTS - MERCURY VAPOR, COST P/EACH | 1.00 | $1,532 | 2023 | $1,532 | 97% | $1,486 | $1,486 | ||
BOLLARD | PARKING BARRIER POSTS/BOLLARDS | 4.00 | $189 | 2023 | $757 | 97% | $734 | $734 | ||
PIPE8 | UTILITY PIPING 8" PLASTIC | 1795.00 | $65 | 2023 | $116,675 | 97% | $113,175 | $113,175 | ||
TKB5 | BOLTED STEEL TANK 300,000 GAL | 1.00 | $381,113 | 2023 | $381,113 | 97% | $369,680 | $369,680 | ||
CC/L6T | FENCE CC/L 6' W/ TOPRAIL | 2080.00 | $28 | 2023 | $58,178 | 97% | $56,432 | $56,432 | ||
CCBW3 | FENCE CC/L 3' BARBWIRE | 2120.00 | $5 | 2023 | $10,282 | 97% | $9,974 | $9,974 | ||
CLGSWG10 | GATE-C/L10'WIDE SWINGING CLASS=HGT | 2.00 | $1,185 | 2023 | $2,370 | 97% | $2,299 | $2,299 | ||
CLGSL20E | GATE-C/L20'SLIDE W/ELECTRIC OPEN | 1.00 | $3,034 | 2023 | $3,034 | 97% | $2,943 | $2,943 | ||
ELOPENA | GATE AUTO CONTROL DEVICE-VEHICLE DETECTR | 1.00 | $2,021 | 2023 | $2,021 | 97% | $1,961 | $1,961 | ||
CC/L6T | FENCE CC/L 6' W/ TOPRAIL | 570.00 | $28 | 2023 | $15,943 | 97% | $15,465 | $15,465 | ||
CCBW3 | FENCE CC/L 3' BARBWIRE | 610.00 | $5 | 2023 | $2,959 | 97% | $2,870 | $2,870 | ||
CLGSWG10 | GATE-C/L10'WIDE SWINGING CLASS=HGT | 4.00 | $1,185 | 2023 | $4,740 | 97% | $4,598 | $4,598 | ||
COMWELL2 | COMML WELL 8"-10" SYS PIPE CASING | 390.00 | $91 | 2022 | $35,490 | 96% | $33,893 | $33,893 | ||
SEPTICC | SEPTIC SYS CMML 100L'LEACH LINE | 1.00 | $30,827 | 2023 | $30,827 | 97% | $29,902 | $29,902 | ||
TRSC70 | SCALES MOTOR TRUCK 70 TON | 1.00 | $114,062 | 2023 | $114,062 | 97% | $110,640 | $110,640 | ||
BOLLARD | PARKING BARRIER POSTS/BOLLARDS | 6.00 | $189 | 2023 | $1,135 | 97% | $1,101 | $1,101 | ||
MVL | LIGHTS - MERCURY VAPOR, COST P/EACH | 7.00 | $1,532 | 2023 | $10,724 | 97% | $10,402 | $10,402 | ||
CFW | CONC FLATWORK | 212.00 | $6 | 2023 | $1,283 | 97% | $1,244 | $1,244 | ||
CFW | CONC FLATWORK | 23079.00 | $6 | 2023 | $139,628 | 97% | $135,439 | $135,439 |
Land Lines
Personal Property
Account | Secured/ Unsecured | Owner | Description |
---|---|---|---|
IM240001 | Unsecured | SOUTHWEST ENERGY LLC | IM - SUPPLEMENTAL BILLING |
Disclaimer
All parcel data on this page is for use by the Elko County Assessor for assessment purposes only. The summary data on this page may not be a complete representation of the parcel or of the improvements thereon. Building information, including unit counts and number of permitted units, should be verified with the appropriate building and planning agencies. Zoning information should be verified with the appropriate planning agency. All parcels are reappraised each year. This is a true and accurate copy of the records of the Elko County Assessor's Office as of November 24, 2024.