Parcel 008-330-006
Owners
PEARCE, MONTY J & MERRY S ET AL
PEARCE, LUKE R & AMBER ET AL
791327
PEARCE, LUKE R & AMBER ET AL
791327
HC 60 BOX 110
WELLS, NV 89835-9802
Parcel Summary
Location | 1117 CLOVER VALLEY RD NV |
---|---|
Use Code | 698: Agricultural Deferred with Multiple Residences |
Tax District | 1.0: County of Elko |
Township | 36N |
Range | 62E |
Acreage | 903.1800 |
Exemptions | 361.150: |
Plat Maps | 008-330.pdf (1,472kb) |
Additional Site Addresses
1093 CLOVER VALLEY RD
1120 CLOVER VALLEY RD
Value History
2024 | 2023 | 2022 | 2021 | 2020 | 2019 | 2018 | |
---|---|---|---|---|---|---|---|
Total Building Value | $402,878 | $1,046,123 | $913,066 | $877,651 | $884,157 | $857,657 | $847,723 |
Total Extra Features Value | $744,091 | $0 | $0 | $0 | $0 | $0 | $0 |
Total Secured Pers Prop | $68,795 | $89,029 | $18,169 | $20,823 | $22,609 | $25,469 | $28,760 |
Total Land Value | $335,747 | $281,271 | $260,826 | $255,097 | $254,551 | $250,149 | $271,723 |
Taxable Value | $1,551,511 | $1,416,423 | $1,192,060 | $1,153,571 | $1,161,317 | $1,133,274 | $1,148,206 |
Net Exemptions Value | $36,897 | $12,210 | $12,210 | $11,962 | $12,041 | $12,041 | $12,041 |
Net Assessed Value | $506,132 | $483,538 | $405,011 | $391,788 | $394,420 | $384,605 | $389,831 |
New Improvements | $0 | $0 | $0 | $0 | $0 | $0 | $0 |
New Land | $0 | $0 | $0 | $0 | $0 | $0 | $0 |
Document/Transfer/Sales History
Buildings
Building # 1, Section # 1, RESIDENCE 1, Single Family Residence
Type | Model | Heated Sq Ft | Repl Cost New | YrBlt | WAY | Other % Dpr | Normal % Dpr | % Cond | Value |
---|---|---|---|---|---|---|---|---|---|
RES | 01 | 1730 | $265,894 | 1938 | 1938 | 0.00% | 75.00% | 25.00% | $66,474 |
Structural Elements
Type | Description | Code | Details |
---|---|---|---|
ROOF | ROOF | 0220 | Wood Shingle |
EW | EXT WALL | 0109 | Frame, Stucco |
HEAT | HEAT | 0313 | Wall Furnace |
0502 | Automatic Appliance Allowance | 1.00 | |
0601 | Plumbing Fixtures -# | 8.00 | |
0602 | Plumbing Fixtures Rough-ins -# | 1.00 | |
FLR | Floor Covering | 0418 | Resilient Floor Cover (%) |
SBFL | SubFloor (RES) | 0622 | Raised Subfloor (%) |
HILL | Hillside Slope Adjustment | 1 | Flat |
0411 | Carpet and Pad (SF) | 1384.00 | |
0911 | Raised Enclosed Porch (SF) Knee Walls w/Glass | 252.00 | |
0912 | Raised Enclosed Porch (SF) Solid Walls | 486.00 |
Building # 2, Section # 1, FIRE STATION, Fire Station (Volunteer)
Building # 3, Section # 1, RESIDENCE 2, Single Family Residence
Type | Model | Heated Sq Ft | Repl Cost New | YrBlt | WAY | Other % Dpr | Normal % Dpr | % Cond | Value |
---|---|---|---|---|---|---|---|---|---|
RES | 01 | 4547 | $588,848 | 1991 | 1991 | 0.00% | 51.00% | 49.00% | $288,536 |
Structural Elements
Type | Description | Code | Details |
---|---|---|---|
ROOF | ROOF | 0208 | Composition Shingle |
EW | EXT WALL | 0133 | Veneer, Masonry |
HEAT | HEAT | 0304 | Electric Baseboard |
0502 | Automatic Appliance Allowance | 1.00 | |
0601 | Plumbing Fixtures -# | 12.00 | |
0602 | Plumbing Fixtures Rough-ins -# | 2.00 | |
SBFL | SubFloor (RES) | 0622 | Raised Subfloor (%) |
HILL | Hillside Slope Adjustment | 1 | Flat |
0402 | Automatic Floor Cover Allowance | 1.00 |
Extra Features
Code | Description | Length | Width | Units | Unit Price | AYB | Repl Cost | % Good Condition | Dpr Value* | Final Value |
---|---|---|---|---|---|---|---|---|---|---|
WOD1 | DECK WOOD OPEN | 240.00 | $17 | 2002 | $4,179 | 66% | $2,737 | $2,737 | ||
SH T1F3 | SHED W/FLOOR COSTS, ALL SIDES CLOSED | 8 | 8 | 64.00 | $57 | 1940 | $3,628 | 25% | $907 | $907 |
WODX1 | DECK - W00D POLYMER COMP MATERIALS, OPEN | 1024.00 | $19 | 2007 | $19,487 | 73% | $14,225 | $14,225 | ||
SH T1F3 | SHED W/FLOOR COSTS, ALL SIDES CLOSED | 15 | 15 | 225.00 | $39 | 1940 | $8,856 | 25% | $2,214 | $2,214 |
GPBLDG1 | GP BUILDING | 21 | 24 | 504.00 | $22 | 1940 | $11,120 | 25% | $2,780 | $2,780 |
FLOOR | FLOOR-WOOD OR CONCRETE (SHEDS,BARNS,ETC) | 21 | 24 | 504.00 | $5 | 1940 | $2,661 | 25% | $665 | $665 |
GPBLDG1 | GP BUILDING | 20 | 56 | 1120.00 | $19 | 1940 | $20,914 | 25% | $5,229 | $5,229 |
SH T21 | SHED SMALL/PUMPHOUSES-II, ONE SIDE OPEN | 20 | 56 | 1120.00 | $15 | 1940 | $16,654 | 25% | $4,164 | $4,164 |
GPBLDG1 | GP BUILDING | 25 | 44 | 1100.00 | $19 | 1940 | $20,579 | 25% | $5,145 | $5,145 |
GPBLDG2 | GP BUILDING | 21 | 26 | 546.00 | $30 | 1940 | $16,161 | 25% | $4,040 | $4,040 |
GPBLDG3 | GP BUILDING | 22 | 24 | 528.00 | $37 | 1950 | $19,706 | 25% | $4,927 | $4,927 |
S14 | SCALES-LIVESTOCK 14'X8'=5 TON | 1.00 | $22,812 | 1950 | $22,812 | 25% | $5,703 | $5,703 | ||
SCM14 | SCALES-LVSTCK 14'MTL CAGE | 1.00 | $2,563 | 1950 | $2,563 | 25% | $641 | $641 | ||
SCRB | SCALES-LVSTCK W/REGISTERED BEAM,ADD | 1.00 | $1,143 | 1950 | $1,143 | 25% | $286 | $286 | ||
SHOPS3 | SHOP - CLASS 1,2,3 | 34 | 70 | 2380.00 | $49 | 1960 | $117,538 | 25% | $29,384 | $29,384 |
CHUTE | CHUTE LOADING - LGT/HVY SPACED/SOLID ETC | 32.00 | $111 | 1960 | $3,561 | 25% | $890 | $890 | ||
PLFN7 | FENCE - 6 OR 7 POLES AVG | 1000.00 | $19 | 1960 | $19,230 | 25% | $4,808 | $4,808 | ||
PLFN5 | FENCE - 4 OR 5 POLES FAIR | 96.00 | $16 | 1960 | $1,528 | 25% | $382 | $382 | ||
S/B5 | FENCE - 5'S/B SOLID BOARD | 136.00 | $33 | 1960 | $4,542 | 25% | $1,136 | $1,136 | ||
FAG550 | FUEL STRG A/G 550 GAL | 3.00 | $6,231 | 1960 | $18,693 | 25% | $4,673 | $4,673 | ||
M&E 22 | SHEDS-M&E ONE SIDE OPEN | 30 | 40 | 1200.00 | $24 | 1968 | $28,433 | 25% | $7,108 | $7,108 |
M&E2 | SHEDS-M&E ALL SIDES CLOSED | 20 | 30 | 600.00 | $34 | 1968 | $20,645 | 25% | $5,161 | $5,161 |
MPGF | GATE - MTL PIPE/PORT PANEL FAIR | 60.00 | $18 | 1968 | $1,104 | 25% | $276 | $276 | ||
PSTL301 | PRE-ENG STL BLDG 30'W | 30 | 61 | 1830.00 | $28 | 1982 | $51,712 | 36% | $18,358 | $18,358 |
FP16 | FEEDER PANEL - 16'X 64 | 6.00 | $1,477 | 1982 | $8,862 | 36% | $3,146 | $3,146 | ||
ELEC | HKUP ELECTRICAL HOOKUP ONLY | 1.00 | $1,692 | 1993 | $1,692 | 52% | $880 | $880 | ||
SEPTIC | SEPTIC HOOKUP ONLY | 1.00 | $5,795 | 1993 | $5,795 | 52% | $3,013 | $3,013 | ||
PSTL801 | PRE-ENG STL BLDG 80'W | 80 | 175 | 14000.00 | $24 | 1997 | $333,847 | 58% | $193,631 | $193,631 |
PGAR2 | GARAGE - POLE FRAME:LOW COST/BASE HT 10' | 20 | 36 | 720.00 | $30 | 1997 | $21,721 | 58% | $12,598 | $12,598 |
MPH10 | FENCE - MTL PANEL 5RAIL 10'X64 | 20.00 | $331 | 1997 | $6,620 | 58% | $3,840 | $3,840 | ||
GPBLDG3 | GP BUILDING | 24 | 24 | 576.00 | $37 | 2000 | $21,263 | 63% | $13,290 | $13,290 |
GPBI3 | GP BLDG INT FIN-CLASS 3 GOOD | 24 | 24 | 576.00 | $3 | 2000 | $1,613 | 63% | $1,008 | $1,008 |
M&E 22 | SHEDS-M&E ONE SIDE OPEN | 30 | 56 | 1680.00 | $22 | 2001 | $37,314 | 64% | $23,881 | $23,881 |
PBA501 | PBA50 BARN ALL SIDES OPEN 50'WIDTH | 50 | 140 | 7000.00 | $11 | 2001 | $77,420 | 64% | $49,549 | $49,549 |
SIDEOP | SHED SIDE W/OPEN SIDES | 26 | 140 | 3640.00 | $12 | 2001 | $44,262 | 64% | $28,328 | $28,328 |
SQEZHD | CATTLE SQUEEZE-HEAVY DUTY HYDRAULIC | 2.00 | $12,162 | 2002 | $24,324 | 66% | $15,932 | $15,932 | ||
MPH14 | FENCE - MTL PANEL 5RAIL 14'X64 | 18.00 | $442 | 2002 | $7,956 | 66% | $5,211 | $5,211 | ||
MPH10 | FENCE - MTL PANEL 5RAIL 10'X64 | 60.00 | $331 | 2002 | $19,860 | 66% | $13,008 | $13,008 | ||
MPGF | GATE - MTL PIPE/PORT PANEL FAIR | 280.00 | $18 | 2002 | $5,152 | 66% | $3,375 | $3,375 | ||
PIPRL | FENCE - METAL PIPE LOW | 64.00 | $25 | 2002 | $1,572 | 66% | $1,030 | $1,030 | ||
PIPRL | FENCE - METAL PIPE LOW | 48.00 | $25 | 2002 | $1,179 | 66% | $772 | $772 | ||
CCA 20 | CROWDING ALLEY CURVED 30'X 74" COMPLETE | 1.00 | $19,148 | 2002 | $19,148 | 66% | $12,542 | $12,542 | ||
MPH16 | FENCE - MTL PANEL 5RAIL 16'X64 | 60.00 | $483 | 2002 | $28,980 | 66% | $18,982 | $18,982 | ||
PLFN7 | FENCE - 6 OR 7 POLES AVG | 1000.00 | $19 | 2002 | $19,230 | 66% | $12,596 | $12,596 | ||
FP16 | FEEDER PANEL - 16'X 64 | 54.00 | $1,477 | 2002 | $79,758 | 66% | $52,241 | $52,241 | ||
SH T22 | SHED SMALL/PUMPHOUSES-II, ONE SIDE OPEN | 8 | 24 | 192.00 | $25 | 2007 | $4,757 | 73% | $3,473 | $3,473 |
BNKHSE3 | BUNKHOUSE | 1040.00 | $56 | 1920 | $58,492 | 25% | $14,623 | $14,623 | ||
RDWSS | HKUP ELKO CO STK BUILT RES W/WELL&SEPTIC | 1.00 | $23,722 | 1938 | $23,722 | 25% | $5,931 | $5,931 | ||
TRHK | HKUP ELKO CO MH HOOK-UP | 1.00 | $28,979 | 2002 | $28,979 | 66% | $18,981 | $18,981 | ||
SEPTIC | SEPTIC HOOKUP ONLY | 1.00 | $5,795 | 1991 | $5,795 | 49% | $2,840 | $2,840 | ||
POOLSA | SWIMMING POOL - AVG P/SF MOTELS APTS | 450.00 | $118 | 1991 | $53,159 | 49% | $26,048 | $26,048 | ||
BNKF3 | BUNKHOUSE FIXTURES - 3 | 5.00 | $2,938 | 1920 | $14,690 | 25% | $3,673 | $3,673 | ||
FNDD | MH FNDTN DBLE WIDE | 168.00 | $128 | 2002 | $21,452 | 66% | $14,051 | $14,051 | ||
C/L4T | FENCE C/L 4' W/ TOP RAIL | 500.00 | $16 | 1991 | $8,150 | 49% | $3,994 | $3,994 | ||
GARSIW2 | GARAGE-DET WOOD SIDING | 720.00 | $42 | 2002 | $30,488 | 66% | $19,969 | $19,969 |
Land Lines
Code | Description | Zone | Front | Depth | Units | Unit Type | Rate | Acreage | Sq Ft | Total Adj | Value |
---|---|---|---|---|---|---|---|---|---|---|---|
698 | Agricultural Deferred with Multiple Residences | OS | 1.00 | SITE | $23,500.00 | 11.00 | 0 | 1.00 | $23,500 | ||
GRAZ3 | GRAZING 3rd CLASS | OS | 164.61 | GRAZ3 | $11.80 | 164.61 | 7,170,368 | 1.00 | $1,942 | ||
MDW1 | WILD HAY 1st CLASS | OS | 185.48 | MDW1 | $567.86 | 185.48 | 8,079,552 | 1.00 | $105,327 | ||
MDW2 | WILD HAY 2nd CLASS | OS | 339.65 | MDW2 | $425.71 | 339.65 | 14,795,328 | 1.00 | $144,594 | ||
PAST3 | PASTURE 3rd CLASS | OS | 113.22 | PAST3 | $279.29 | 113.22 | 4,931,776 | 1.00 | $31,621 | ||
PAST4 | PASTURE 4th CLASS | OS | 89.22 | PAST4 | $138.57 | 89.22 | 3,886,336 | 1.00 | $12,363 |
Personal Property
Account | Secured/ Unsecured | Owner | Description |
---|---|---|---|
RS000126 | Secured | PEARCE, MONTY J & MERRY S ET AL | RS - RURAL EQUIPMENT |
TU006889 | Unsecured | BRITTON, BRUCE V FAMILY TRUST | TU - TRAILERS / MOBILE HOMES |
TU900064 | Unsecured | WILLOMONTE RANCH LLC | TU - TRAILERS / MOBILE HOMES |
Disclaimer
All parcel data on this page is for use by the Elko County Assessor for assessment purposes only. The summary data on this page may not be a complete representation of the parcel or of the improvements thereon. Building information, including unit counts and number of permitted units, should be verified with the appropriate building and planning agencies. Zoning information should be verified with the appropriate planning agency. All parcels are reappraised each year. This is a true and accurate copy of the records of the Elko County Assessor's Office as of November 24, 2024.