Parcel 002-210-015
Owners
THOMAS PETROLEUM LLC
620136
620136
PO BOX 54446
LEXINGTON, KY 40555-4446
Parcel Summary
Location | 2255 GRIFFIN ST CARLIN CITY, NV |
---|---|
Use Code | 500: General Industrial - light industry, trucking and warehousing, service, repair, etc. |
Tax District | 10.0: City of Carlin |
Map Parcel | 536727 P12 |
Acreage | 10.0010 |
Plat Maps | 002-210.pdf (1,256kb) |
Lineage | Split from 002-210-013 |
Additional Site Addresses
SEC 22 TWP 33N RGE 52E MDB&M
STATE RT 766
Keyline Description
PARCEL 12 FILE 536727LOCATED IN
SEC/LOT: 22 TWN/BLOCK: 33N RNG: 52E ACRES: 5.00
MDB&M
FORMERLY ASSESSED UNDER 002-210-013
NOTE: AMENDED BY BLA ROS MAP FILE 676013 AND
DOCUMENT 676012, NEW ACREAGE:
LAND GAINED IN THE BLA DESCRIBED AS FOLLOWS:
BEG A THE MOST N'LY COR OF PARCEL 18, FILE
646792, THE TRUE POB;
TH: S 21¦33'51" E ALONG THE NE'LY BOUNDARY OF
SAID PARCEL 18 291.41' TO COR 2;
TH: FROM A TANGENT BEARING S 21¦33'51" E CONT
ALONG THE NE'LY BOUNDARY OF SAID PARCEL 18 ON A
CIRCULAR CURVE TO THE LEFT WITH A RADIUS OF
5197.66' THROUGH A CENTRAL ANGLE OF 2¦33'04", AND
AN ARCE DISTANCE OF 231.44' TO COR 3;
TH: S 71¦26'03" W 423.16' TO COR 4 BEING A PT
ON THE SW'LY BOUNDARY OF SAID PARCEL 18;
TH: N 18¦33'55" W ALONG THE SW'LY BOUNDARY OF
SAID PARCEL 18 30.06' TO COR 5;
TH: FROM A TANGENT BEARING N 18¦33'55" W CONT
ALONG THE SW'LY BOUNDARY OF SAID PARCEL 18 ON A
CIRCULAR CURVE TO THE LEFT WITH A RADIUS OF
1540.00' THROUGH A CENTRAL ANGLE OF 10¦09'33" AND
AN ARC DISTANCE OF 273.66' TO COR 6;
TH: N 28¦43'29" W CONT ALONG THE SW'LY
BOUNDARY OF SAID PARCEL 18 199.65' TO COR 7,
BEING THE NW COR OF SAID PARCEL 18;
TH: N 68¦26'09" E ALONG THE NW'LY BOUNDARY OF
SAID PARCEL 18 450.65' TO COR 1, THE POB.
Value History
2025 | 2024 | 2023 | 2022 | 2021 | 2020 | 2019 | |
---|---|---|---|---|---|---|---|
Total Building Value | $1,553,572 | $1,429,409 | $2,078,109 | $1,825,334 | $1,726,163 | $1,745,069 | $1,732,303 |
Total Extra Features Value | $922,160 | $913,872 | $0 | $0 | $0 | $0 | $0 |
Total Secured Pers Prop | $0 | $0 | $0 | $0 | $0 | $0 | $0 |
Total Land Value | $180,018 | $180,017 | $180,017 | $180,017 | $180,017 | $180,017 | $180,017 |
Taxable Value | $2,655,750 | $2,523,298 | $2,258,126 | $2,005,351 | $1,906,180 | $1,925,086 | $1,912,320 |
Net Exemptions Value | $0 | $0 | $0 | $0 | $0 | $0 | $0 |
Net Assessed Value | $929,512 | $883,154 | $790,344 | $701,873 | $667,163 | $673,780 | $669,312 |
New Improvements | $48,568 | $0 | $0 | $0 | $0 | $0 | $0 |
New Land | $0 | $0 | $0 | $0 | $0 | $0 | $0 |
Document/Transfer/Sales History
Buildings
Building # 1, Section # 1, THOMAS PETROLEUM LLC, Lt. Commercial Utility Build.
Building # 2, Section # 1, THOMAS PETROLEUM LLC, Lt. Commercial Utility Build.
Building # 3, Section # 1, THOMAS PETROLEUM LLC, Service Repair Garage
Extra Features
Code | Description | Length | Width | Units | Unit Price | AYB | Repl Cost | % Good Condition | Dpr Value* | Final Value |
---|---|---|---|---|---|---|---|---|---|---|
FBRGLSPL | LIGHT POLE FIBERGLASS L/FT | 126.00 | $131.67 | 2009 | $16,590 | 76% | $12,609 | $12,609 | ||
MHYDLTS | LIGHTS - METAL HALIDE, COST PER EA | 7.00 | $1,724.00 | 2009 | $12,068 | 76% | $9,172 | $9,172 | ||
MVL | LIGHTS - MERCURY VAPOR, COST P/EACH | 5.00 | $1,532.00 | 2009 | $7,660 | 76% | $5,822 | $5,822 | ||
SUBPUMP4 | GAS STN SUBMRGD PUMP INDUST/COMMERCIAL | 5.00 | $4,797.00 | 2009 | $23,985 | 76% | $18,229 | $18,229 | ||
CONISL | ISLAND - CONCRETE LOW - SF | 84.00 | $17.56 | 2009 | $1,475 | 76% | $1,121 | $1,121 | ||
PIPEDISP | GAS STN PIPING-COST PER PRODUCT | 4.00 | $2,057.00 | 2009 | $8,228 | 76% | $6,253 | $6,253 | ||
PIT | LUBE PIT, WALK-IN | 2.00 | $4,133.00 | 2009 | $8,266 | 76% | $6,282 | $6,282 | ||
BOLLARD | PARKING BARRIER POSTS/BOLLARDS | 86.00 | $189.13 | 2009 | $16,265 | 76% | $12,362 | $12,362 | ||
CFW | CONC FLATWORK | 3823.00 | $6.05 | 2015 | $23,129 | 85% | $19,660 | $19,660 | ||
MVL | LIGHTS - MERCURY VAPOR, COST P/EACH | 20.00 | $1,532.00 | 2015 | $30,640 | 85% | $26,044 | $26,044 | ||
MHYDLTS | LIGHTS - METAL HALIDE, COST PER EA | 2.00 | $1,724.00 | 2015 | $3,448 | 85% | $2,931 | $2,931 | ||
WDPOLE | LIGHT POLE - WOOD P/LF | 140.00 | $53.78 | 2015 | $7,529 | 85% | $6,400 | $6,400 | ||
STLPOLE | LIGHT POLE - STEEL P/LF | 80.00 | $100.55 | 2015 | $8,044 | 85% | $6,837 | $6,837 | ||
SHOPS1 | SHOP - CLASS 1,2,3 | 30 | 32 | 960.00 | $33.78 | 2015 | $32,427 | 85% | $27,563 | $27,563 |
CPRKLOT | PARKING LOT-8" CFW | 14662.00 | $11.16 | 2009 | $163,628 | 76% | $124,357 | $124,357 | ||
FUG2000 | FUEL STRG U/G 20,000 GAL | 6.00 | $139,319.00 | 2009 | $835,914 | 76% | $635,295 | $635,295 | ||
PRKBMPC | PARKING BUMPERS PRECAST CONC - LF | 162.00 | $8.88 | 2015 | $1,439 | 85% | $1,223 | $1,223 |
Land Lines
Personal Property
None
Disclaimer
All parcel data on this page is for use by the Elko County Assessor for assessment purposes only. The summary data on this page may not be a complete representation of the parcel or of the improvements thereon. Building information, including unit counts and number of permitted units, should be verified with the appropriate building and planning agencies. Zoning information should be verified with the appropriate planning agency. All parcels are reappraised each year. This is a true and accurate copy of the records of the Elko County Assessor's Office as of April 21, 2025.