Parcel 001-630-100
Owners
ASILIA ELKO LLC
423 W BROADWAY STE 230
SALT LAKE CITY, UT 84101-1218
Parcel Summary
Location | 1520 SILVER ST ELKO CITY, NV |
---|---|
Use Code | 500: General Industrial - light industry, trucking and warehousing, service, repair, etc. |
Tax District | 11.5: Elko GID - Redevelopment |
Map Parcel | 733089 P3 |
Acreage | 14.7090 |
Plat Maps | 001-630.pdf (1,675kb) 001-630_2.pdf (3,999kb) |
Lineage | Split from 001-630-089 |
Keyline Description
PARCEL 3 FILE 733089LOCATED IN
SEC/LOT: 11,14 TWN/BLOCK: 34N RNG: 55E ACRES:
0.00
MDB&M
FORMERLY A PORTION OF 001-630-088 AND
001-630-089
AUTOMATED RECORDS ONLY
CERTIFICATE OF AMENDMENT 801289 TO INCLUDE
OMITTED DIMENSIONS ON PARCEL MAP 694903 &
733089
NO CHANGE TO ACREAGE
PER BLA DEED 833177 AND SHOWN ON BLA ROS
833179 PLUS 14,631 SF OR 0.336 ACRES FROM
001-630-103
NOW CONTAINS 14.709 ACRES
Value History
2025 | 2024 | 2023 | 2022 | 2021 | 2020 | 2019 | |
---|---|---|---|---|---|---|---|
Total Building Value | $23,891,646 | $0 | $0 | $0 | $0 | $0 | $0 |
Total Extra Features Value | $2,579,312 | $0 | $0 | $0 | $0 | $0 | $0 |
Total Secured Pers Prop | $0 | $0 | $0 | $0 | $0 | $0 | $0 |
Total Land Value | $308,889 | $308,889 | $301,834 | $301,834 | $301,834 | $301,834 | $301,834 |
Taxable Value | $26,779,847 | $308,889 | $301,834 | $301,834 | $301,834 | $301,834 | $301,834 |
Net Exemptions Value | $0 | $0 | $0 | $0 | $0 | $0 | $0 |
Net Assessed Value | $9,372,946 | $108,111 | $105,642 | $105,642 | $105,642 | $105,642 | $105,642 |
New Improvements | $26,470,958 | $0 | $0 | $0 | $0 | $0 | $0 |
New Land | $0 | $7,055 | $0 | $0 | $0 | $0 | $0 |
Document/Transfer/Sales History
Buildings
Building # 2, Section # 1, SANDVIK OFFICE BLDG, Office Building
Type | Model | Heated Sq Ft | Repl Cost New | YrBlt | WAY | Other % Dpr | Normal % Dpr | % Cond | Value |
---|---|---|---|---|---|---|---|---|---|
COMM | 344 | 23460 | $8,912,748 | 2025 | 2025 | 0.00% | 1.50% | 98.50% | $8,779,057 |
Structural Elements
Building # 2, Section # 1, SANDVIK SERVICE GARAGE/INDUSTRIAL BLDG, Service Repair Garage
Type | Model | Heated Sq Ft | Repl Cost New | YrBlt | WAY | Other % Dpr | Normal % Dpr | % Cond | Value |
---|---|---|---|---|---|---|---|---|---|
COMM | 528 | 21965 | $6,805,824 | 2025 | 2025 | 0.00% | 1.50% | 98.50% | $6,703,737 |
Structural Elements
Type | Description | Code | Details |
---|---|---|---|
EW_C | EXT WALL-Commercial | 818 | Concrete, Tilt-Up |
HEAT_C | HEAT-Commercial | 606 | Space Heater |
HEAT_C | HEAT-Commercial | 618 | Evaporative Cooling |
HEAT_C | HEAT-Commercial | 611 | Package Unit |
ST | Number of Stories (COMM) | 1.00 | |
WH | Average Wall Height (COMM) | 43.00 | |
683 | Sprinkler System Wet - Commercial | 21965.00 | |
764 | Fire Alarm System | 21965.00 |
Building # 3, Section # 1, SANDVIK SERVICE GARAGE, Service Repair Garage
Type | Model | Heated Sq Ft | Repl Cost New | YrBlt | WAY | Other % Dpr | Normal % Dpr | % Cond | Value |
---|---|---|---|---|---|---|---|---|---|
COMM | 528 | 4922 | $1,700,396 | 2025 | 2025 | 0.00% | 1.50% | 98.50% | $1,674,890 |
Structural Elements
Type | Description | Code | Details |
---|---|---|---|
EW_C | EXT WALL-Commercial | 916 | Single Wall - Metal On Steel Frame |
HEAT_C | HEAT-Commercial | 606 | Space Heater |
HEAT_C | HEAT-Commercial | 618 | Evaporative Cooling |
HEAT_C | HEAT-Commercial | 611 | Package Unit |
ST | Number of Stories (COMM) | 1.00 | |
WH | Average Wall Height (COMM) | 40.00 | |
683 | Sprinkler System Wet - Commercial | 4922.00 | |
764 | Fire Alarm System | 4922.00 |
Building # 4, Section # 1, PAINT BOOTH, Service Repair Garage
Building # 5, Section # 1, SANDVIK STORAGE WAREHOUSE, Storage Warehouse
Type | Model | Heated Sq Ft | Repl Cost New | YrBlt | WAY | Other % Dpr | Normal % Dpr | % Cond | Value |
---|---|---|---|---|---|---|---|---|---|
COMM | 406 | 31250 | $5,492,502 | 2025 | 2025 | 0.00% | 1.50% | 98.50% | $5,410,114 |
Structural Elements
Building # 6, Section # 1, TOOL SHOP, Tool Shed
Type | Model | Heated Sq Ft | Repl Cost New | YrBlt | WAY | Other % Dpr | Normal % Dpr | % Cond | Value |
---|---|---|---|---|---|---|---|---|---|
COMM | 456 | 1600 | $66,176 | 2025 | 2025 | 0.00% | 1.50% | 98.50% | $65,183 |
Structural Elements
Building # 7, Section # 1, COMPRESSOR ROOM, Tool Shed
Extra Features
Code | Description | Length | Width | Units | Unit Price | AYB | Repl Cost | % Good Condition | Dpr Value* | Final Value |
---|---|---|---|---|---|---|---|---|---|---|
PATIOS | PATIO RF-STEEL/BAKED ENAMEL | 6250.00 | $14.17 | 2025 | $88,563 | 99% | $87,234 | $87,234 | ||
CPRKLOT6 | PARKING LOT 6" CFW | 6542.00 | $9.87 | 2025 | $64,570 | 99% | $63,601 | $63,601 | ||
SHPDCK8D | DOCK LOAD 8D WELL EXCAVATED CLS D-P | 2193.00 | $22.60 | 2025 | $49,562 | 99% | $48,818 | $48,818 | ||
BOLLARD | PARKING BARRIER POSTS/BOLLARDS | 19.00 | $191.04 | 2025 | $3,630 | 99% | $3,575 | $3,575 | ||
PIPRL | FENCE - METAL PIPE LOW | 96.00 | $25.02 | 2025 | $2,402 | 99% | $2,366 | $2,366 | ||
HYDCKLEV | HYDRAULIC DOCK LEVELORS | 3.00 | $10,184.00 | 2025 | $30,552 | 99% | $30,094 | $30,094 | ||
PATIOA | PATIO RF-ALUMINUM | 560.00 | $14.17 | 2025 | $7,935 | 99% | $7,816 | $7,816 | ||
SH T1F1 | SHED W/FLOOR COSTS, ALL SIDES CLOSED | 160.00 | $27.42 | 2025 | $4,387 | 99% | $4,321 | $4,321 | ||
COP2 | PORCH-CONCRETE OPEN W/STEPS | 60.00 | $25.46 | 2025 | $1,528 | 99% | $1,505 | $1,505 | ||
BOLLARD | PARKING BARRIER POSTS/BOLLARDS | 12.00 | $191.04 | 2025 | $2,292 | 99% | $2,258 | $2,258 | ||
BOLLARD | PARKING BARRIER POSTS/BOLLARDS | 39.00 | $191.04 | 2025 | $7,451 | 99% | $7,339 | $7,339 | ||
CPRKLOT6 | PARKING LOT 6" CFW | 1945.00 | $9.87 | 2025 | $19,197 | 99% | $18,909 | $18,909 | ||
COP1 | PORCH-CONCRETE OPEN SLAB | 2244.00 | $9.38 | 2025 | $21,049 | 99% | $20,733 | $20,733 | ||
PATIAC | PATIO RF-ARCHED OPEN LATTICE/TRELLIS | 1356.00 | $47.35 | 2025 | $64,207 | 99% | $63,244 | $63,244 | ||
BOLLARD | PARKING BARRIER POSTS/BOLLARDS | 12.00 | $191.04 | 2025 | $2,292 | 99% | $2,258 | $2,258 | ||
ENCSLL | ENCL BRZ/PCH SLD FR WALL LOW | 65.00 | $93.94 | 2025 | $6,106 | 99% | $6,015 | $6,015 | ||
PIPRL | FENCE - METAL PIPE LOW | 48.00 | $25.02 | 2025 | $1,201 | 99% | $1,183 | $1,183 | ||
BOLLARD | PARKING BARRIER POSTS/BOLLARDS | 13.00 | $191.04 | 2025 | $2,484 | 99% | $2,446 | $2,446 | ||
ASPHC | ASPH COMMERCIAL | 160336.00 | $9.80 | 2025 | $1,571,293 | 99% | $1,547,723 | $1,547,723 | ||
XGUT | GUTTER - CONCRETE CROSS, AT INTERSECTION | 1892.00 | $11.06 | 2025 | $20,926 | 99% | $20,612 | $20,612 | ||
C6 | CURBING 6"CONCRETE NO GUTTER PER LF | 1600.00 | $14.73 | 2025 | $23,568 | 99% | $23,214 | $23,214 | ||
CG2 | CURBING 6"CONCRETE W/2'GUTTER PER LF | 1289.00 | $24.97 | 2025 | $32,186 | 99% | $31,704 | $31,704 | ||
MTLRAIL | FENCE - CMML METAL GUARD RAIL | 136.00 | $39.90 | 2025 | $5,426 | 99% | $5,345 | $5,345 | ||
PRKBMPC | PARKING BUMPERS PRECAST CONC - LF | 24.00 | $8.97 | 2025 | $215 | 99% | $212 | $212 | ||
CONISL | ISLAND - CONCRETE LOW - SF | 28.00 | $17.40 | 2025 | $487 | 99% | $480 | $480 | ||
STLPOLE | LIGHT POLE - STEEL P/LF | 475.00 | $101.56 | 2025 | $48,241 | 99% | $47,517 | $47,517 | ||
MVL | LIGHTS - MERCURY VAPOR, COST P/EACH | 19.00 | $1,548.00 | 2025 | $29,412 | 99% | $28,971 | $28,971 | ||
CC/L6T | FENCE CC/L 6' W/ TOPRAIL | 4190.00 | $28.26 | 2025 | $118,409 | 99% | $116,633 | $116,633 | ||
WIF | FENCE - RES WR/IRON,STEEL,ALUM, PER SF | 6390.00 | $12.27 | 2025 | $78,405 | 99% | $77,229 | $77,229 | ||
WIGATE | GATE - RES FENCE WR/IRON P/SF | 300.00 | $18.44 | 2025 | $5,532 | 99% | $5,449 | $5,449 | ||
ELGATE | GATE AUTOMATED ELECTRONIC ENTRY | 1.00 | $8,908.64 | 2025 | $8,909 | 99% | $8,775 | $8,775 | ||
CCBW6 | FENCE CC/L 6' BARBWIRE | 4190.00 | $4.90 | 2025 | $20,531 | 99% | $20,223 | $20,223 | ||
MVL | LIGHTS - MERCURY VAPOR, COST P/EACH | 50.00 | $1,548.00 | 2025 | $77,400 | 99% | $76,239 | $76,239 | ||
CRANESP1 | BRIDGE CRANEWAY SPAN 2-9 TONS | 101.00 | $268.00 | 2025 | $27,068 | 99% | $26,662 | $26,662 | ||
CRANESP2 | BRIDGE CRANEWAY SPAN 10-24 TONS | 179.00 | $412.00 | 2025 | $73,748 | 99% | $72,642 | $72,642 | ||
RETAIN | WALL-RETAINING 8" PRECAST | 1265.00 | $24.46 | 2025 | $30,942 | 99% | $30,478 | $30,478 | ||
RETAIN | WALL-RETAINING 8" PRECAST | 1368.00 | $24.46 | 2025 | $33,461 | 99% | $32,959 | $32,959 | ||
PIPRL | FENCE - METAL PIPE LOW | 114.00 | $25.02 | 2025 | $2,852 | 99% | $2,809 | $2,809 | ||
FLAGPOLE30 | FLAGPOLE 30' P/UNIT | 3.00 | $2,575.00 | 2025 | $7,725 | 99% | $7,609 | $7,609 | ||
CPRKLOT | PARKING LOT-8" CFW | 700.00 | $11.27 | 2025 | $7,889 | 99% | $7,771 | $7,771 |
Land Lines
Personal Property
Account | Secured/ Unsecured | Owner | Description |
---|---|---|---|
BU063356 | Unsecured | SANDVIK MINING AND CONSTRUCTION USA, LLC | BU - BUSINESS EQUIPMENT |
Disclaimer
All parcel data on this page is for use by the Elko County Assessor for assessment purposes only. The summary data on this page may not be a complete representation of the parcel or of the improvements thereon. Building information, including unit counts and number of permitted units, should be verified with the appropriate building and planning agencies. Zoning information should be verified with the appropriate planning agency. All parcels are reappraised each year. This is a true and accurate copy of the records of the Elko County Assessor's Office as of July 28, 2025.