Parcel 001-191-005
Owners
ELKO COUNTY SCHOOL DISTRICT
002200013
002200013
850 ELM ST
ELKO, NV 89801-3349
Parcel Summary
Location | 987 COLLEGE AVE ELKO CITY, NV |
---|---|
Use Code | 400: General Commercial |
Tax District | 11.5: Elko GID - Redevelopment |
Map Parcel | 769189 P1 |
Acreage | 14.0300 |
Exemptions | 361.065: SCHOOL DISTRICT, CHARTER SCHOOL OWNED (100%) |
Plat Maps | 001-190.pdf (180kb) |
Additional Site Addresses
1297 COLLEGE AVE
Keyline Description
PARCEL 1 MAP FILE 769189LOCATED IN
SEC/LOT: 10/11 TWN/BLOCK: 34N RNG: 55E ACRES: 0.00
MDB&M CONT:
CREATED BY A CONSOLIDATION OF PARCELS
001-191-001 AND 001-191-004
FORMERLY DESCRBED AS:
~
A PARCEL LOCATED IN THE N2NE4 OF
SEC/LOT: 15 TWN/BLOCK: 34N RNG: 55E ACRES: 0.00
AND THE SE4SE4 OF
SEC/LOT: 10 TWN/BLOCK: 34N RNG: 55E ACRES: 0.00
MDB&M
DESC AS FOLLOWS:
COMM AT THE STREET MON AT THE INTERSECTION OF
13TH ST & COLLEGE AVE SAID MON BEING LOCATED
N 88¦50'33" W 406.90' FROM THE SEC COR COMMON
TO THE SECS 10,11,14,&15/34N/55E MDB&M;
TH: S 41¦49' W 390.00' TO A PT;
TH: N 48¦11' W 40.00' TO A PT ON THE NW'LY LINE
OF COLLEGE AVE AS COR 1 POB;
TH: N 48¦11' W 562.58' TO COR 2, A PT ON THE
SE'LY LINE OF CEDAR ST;
TH: S 41¦49' W ALONG SAID STREET LINE 250.49' TO
COR 3;
TH: S 49¦00'24" W 479.39' TO COR 4;
TH: S 41¦49' W 52.04' TO COR 5, THE EAST COR OF
THE INTERSECTION OF 9TH & CEDAR STS;
TH: ALONG THE NE'LY OF 9TH ST S 48¦11' E 405.14'
TO COR 6;
TH: FROM A TANGENT WHOSE BEARING IS S 48¦11' E ON
A CURVE TO THE RIGHT WITH A RADIUS OF 182.36'
THRU AN ANGLE OF 52¦42'11" 167.74' TO COR 7;
TH: S 48¦11' E 72.37' TO COR COR 8, THE N COR
OF THE INTERSECTION OF 9TH & COLLEGE AVE;
TH: ALONG THE NW'LY LINE OF COLLEGE AVE
N 41¦49' E 850.00' TO COR 1, THE POB.
CONT 10.613A
LESS 0.23A 155/465 TO ELKO GENERAL HOSPITAL
LESS ADDITIONAL ACREAGE TO THE HOSPITAL 230/316
PLUS AREA FROM ELKO CO PER 230/318
PLUS AREA FROM ELKO CO PER 603/609
LESS AREA TO HOSPITAL PER 603/612
REMAINING: 10.964A
SEE ROS FILE 260889 WHICH GAVE SOME DATA TO THIS
PARCEL
Created by consolidation of these Parcel #'s:
001-191-001 001-191-004
Value History
2025 | 2024 | 2023 | 2022 | 2021 | |
---|---|---|---|---|---|
Total Building Value | $30,578,022 | $11,920,300 | $11,510,037 | $9,455,986 | $5,351,540 |
Total Extra Features Value | $570,391 | $439,187 | $0 | $0 | $0 |
Total Secured Pers Prop | $0 | $0 | $0 | $0 | $0 |
Total Land Value | $3,055,734 | $3,055,734 | $3,055,734 | $3,055,734 | $3,055,734 |
Taxable Value | $34,204,147 | $15,415,221 | $14,565,771 | $12,511,720 | $8,407,274 |
Net Exemptions Value | $11,971,451 | $5,395,327 | $5,098,020 | $4,379,102 | $2,942,546 |
Net Assessed Value | $0 | $0 | $0 | $0 | $0 |
New Improvements | $19,111,542 | $0 | $4,888,266 | $3,988,334 | $0 |
New Land | $0 | $0 | $0 | $0 | $3,055,734 |
Document/Transfer/Sales History
Buildings
Building # 1, Section # 1, ELKO HIGH SCHOOL, High School (Entire)
Building # 2, Section # 1, SPECIAL SERVICES PROGRAM BLDG., Office Building
Building # 3, Section # 1, SCIENCE BUILDING, Science Classroom
Building # 4, Section # 1, EHS PERFORMING ARTS BUILDING, Theater - Live Stage
Extra Features
Code | Description | Length | Width | Units | Unit Price | AYB | Repl Cost | % Good Condition | Dpr Value* | Final Value |
---|---|---|---|---|---|---|---|---|---|---|
ASPH | ASPH RESIDENTIAL | 110000.00 | $5.87 | 1948 | $645,700 | 25% | $161,425 | $161,425 | ||
CFW | CONC FLATWORK | 46000.00 | $6.05 | 1948 | $278,300 | 25% | $69,575 | $69,575 | ||
ASPH | ASPH RESIDENTIAL | 61000.00 | $5.87 | 1995 | $358,070 | 55% | $196,939 | $196,939 | ||
CFW | CONC FLATWORK | 6374.00 | $6.05 | 2021 | $38,563 | 94% | $36,249 | $36,249 | ||
RAMP1 | WALKWAY RAMP CONCRETE P/SF | 1223.00 | $35.01 | 2021 | $42,817 | 94% | $40,248 | $40,248 | ||
RAILC | WALKWAY ADD STEEL RAILS P/LF | 268.00 | $66.43 | 2021 | $17,803 | 94% | $16,735 | $16,735 | ||
PRKBMPC | PARKING BUMPERS PRECAST CONC - LF | 42.00 | $8.88 | 2021 | $373 | 94% | $351 | $351 | ||
BOLLARD | PARKING BARRIER POSTS/BOLLARDS | 7.00 | $189.13 | 2021 | $1,324 | 94% | $1,244 | $1,244 | ||
STLPOLE | LIGHT POLE - STEEL P/LF | 252.00 | $100.55 | 1995 | $25,339 | 55% | $13,936 | $13,936 | ||
HPSYDLTS | LIGHTS-HIGH PRESSURE SODIUM EACH | 9.00 | $1,796.00 | 1995 | $16,164 | 55% | $8,890 | $8,890 | ||
CG1 | CURBING 6"CONCRETE W/1'GUTTER PER LF | 1087.00 | $21.52 | 2021 | $23,392 | 94% | $21,989 | $21,989 | ||
C6 | CURBING 6"CONCRETE NO GUTTER PER LF | 205.00 | $14.58 | 2021 | $2,989 | 94% | $2,810 | $2,810 |
Land Lines
Personal Property
None
Disclaimer
All parcel data on this page is for use by the Elko County Assessor for assessment purposes only. The summary data on this page may not be a complete representation of the parcel or of the improvements thereon. Building information, including unit counts and number of permitted units, should be verified with the appropriate building and planning agencies. Zoning information should be verified with the appropriate planning agency. All parcels are reappraised each year. This is a true and accurate copy of the records of the Elko County Assessor's Office as of April 22, 2025.