Parcel 001-679-017

Owners

JOY GLOBAL SURFACE MINING INC
751258

135 S 84TH ST STE 300
MILWAUKEE, WI 53214-1478

Parcel Summary

Location 4450 P & H DR
NV
Use Code 510: Commercial Industrial - retail or office use combined with Industrial use
Tax District 11.0: City of Elko
Map Parcel 754554
Acreage 31.1000
Plat Maps 001-679.pdf (1,049kb)
Lineage Combined from:
001-679-005
001-679-014
001-679-015
001-679-016

Additional Site Addresses

4451 P & H DR
4500 P & H DR

Value History

2025202420232022202120202019
Total Building Value$44,957,766$45,332,978$39,597,954$34,848,997$33,029,257$33,522,446$3,035,169
Total Extra Features Value$5,165,674$5,286,481$0$0$0$0$0
Total Secured Pers Prop$0$0$0$0$0$0$0
Total Land Value$622,000$622,000$626,940$626,940$626,940$626,940$622,000
Taxable Value$50,745,440$51,241,459$40,224,894$35,475,937$33,656,197$34,149,386$3,657,169
Net Exemptions Value$0$0$0$0$0$0$0
Net Assessed Value$17,760,904$17,934,511$14,078,713$12,416,578$11,779,669$11,952,285$1,280,009
New Improvements$0$7,034,201$0$0$0$30,616,571$0
New Land$0$0$0$0$0$0$622,000

Document/Transfer/Sales History

Instrument /
Official Record
DateTypeV/IDcl ValueOwnership
7512582019-02-01Vacant$1Grantor: P&H MINING EQUIPMENT INC
Grantee: JOY GLOBAL SURFACE MINING INC
7512572019-02-01Vacant$1Grantor: HARNISCHFEGER CORPORATION
Grantee: P&H MINING EQUIPMENT INC
1122002671999-12-06Vacant$175,000Grantee: HARNISCHFEGER CORPORATION
1011007041997-09-30Vacant$1Grantee: STITZEL, CALVIN DEAN

Buildings

Building # 1, Section # 1, KOMATSU, Office Building

TypeModelHeated Sq FtRepl Cost NewYrBltWAYOther % DprNormal % Dpr% CondValue
COMM34442840$5,063,480200120010.00%37.50%62.50%$3,164,675

Structural Elements

TypeDescriptionCodeDetails
EW_CEXT WALL-Commercial916Single Wall - Metal On Steel Frame
HEAT_CHEAT-Commercial606Space Heater
HEAT_CHEAT-Commercial611Package Unit
STNumber of Stories (COMM)1.00
WHAverage Wall Height (COMM)8.00
683Sprinkler System Wet - Commercial42840.00
763Mezzanine - Storage280.00

Sub Areas

TypeGross AreaPercent of BaseAdjusted Area
GBA42,840100%42,840

Building # 2, Section # 1, KOMATSU SERVICE GARAGE/INDUSTRIAL BLDG, Service Repair Garage

TypeModelHeated Sq FtRepl Cost NewYrBltWAYOther % DprNormal % Dpr% CondValue
COMM528103370$28,964,984201920190.00%10.50%89.50%$25,923,661

Structural Elements

TypeDescriptionCodeDetails
EW_CEXT WALL-Commercial818Concrete, Tilt-Up
HEAT_CHEAT-Commercial606Space Heater
HEAT_CHEAT-Commercial618Evaporative Cooling
HEAT_CHEAT-Commercial611Package Unit
STNumber of Stories (COMM)1.00
WHAverage Wall Height (COMM)35.00
683Sprinkler System Wet - Commercial103370.00
761Mezzanine - Office2160.00
764Fire Alarm System103370.00

Sub Areas

TypeGross AreaPercent of BaseAdjusted Area
GBA103,370100%103,370

Building # 3, Section # 1, KOMATSU OFFICE BLDG, Office Building

TypeModelHeated Sq FtRepl Cost NewYrBltWAYOther % DprNormal % Dpr% CondValue
COMM34420942$8,448,515201920190.00%10.50%89.50%$7,561,421

Structural Elements

TypeDescriptionCodeDetails
EW_CEXT WALL-Commercial818Concrete, Tilt-Up
HEAT_CHEAT-Commercial611Package Unit
STNumber of Stories (COMM)2.00
WHAverage Wall Height (COMM)32.00
651Elevator Passenger # - Commercial1.00
683Sprinkler System Wet - Commercial20942.00
764Fire Alarm System20942.00

Sub Areas

TypeGross AreaPercent of BaseAdjusted Area
GBA20,942100%20,942

Building # 4, Section # 1, PAINT BOOTH, Service Repair Garage

TypeModelHeated Sq FtRepl Cost NewYrBltWAYOther % DprNormal % Dpr% CondValue
COMM5283990$360,257201920190.00%10.50%89.50%$322,430

Structural Elements

TypeDescriptionCodeDetails
EW_CEXT WALL-Commercial916Single Wall - Metal On Steel Frame
HEAT_CHEAT-Commercial609Ventalation
STNumber of Stories (COMM)1.00
WHAverage Wall Height (COMM)24.00

Sub Areas

TypeGross AreaPercent of BaseAdjusted Area
GBA3,990100%3,990

Building # 5, Section # 1, KOMATSU STORAGE WAREHOUSE, Storage Warehouse

TypeModelHeated Sq FtRepl Cost NewYrBltWAYOther % DprNormal % Dpr% CondValue
COMM40648944$6,497,316202320230.00%4.50%95.50%$6,204,937

Structural Elements

TypeDescriptionCodeDetails
EW_CEXT WALL-Commercial818Concrete, Tilt-Up
HEAT_CHEAT-Commercial606Space Heater
HEAT_CHEAT-Commercial618Evaporative Cooling
STNumber of Stories (COMM)1.00
WHAverage Wall Height (COMM)35.00
683Sprinkler System Wet - Commercial48944.00
764Fire Alarm System48944.00

Sub Areas

TypeGross AreaPercent of BaseAdjusted Area
GBA48,944100%48,944

Extra Features

*RCNLD: Replacement Cost New, Less Depreciation

CodeDescriptionLengthWidthUnitsUnit PriceAYBRepl Cost% Good ConditionDpr Value*Final Value
CPRKLOTPARKING LOT-8" CFW1070700.00$11.271995$7,88954%$4,221$4,221
CFWCONC FLATWORK3554.00$6.062019$21,53790%$19,276$19,276
CPRKLOTPARKING LOT-8" CFW54945076.00$11.271995$57,20754%$30,605$30,605
PATIOAPATIO RF-ALUMINUM41872.00$14.172019$1,02090%$913$913
COMWELL2COMML WELL 8"-10" SYS PIPE CASING440.00$92.001995$40,48054%$21,657$21,657
COP2PORCH-CONCRETE OPEN W/STEPS6954.00$26.052019$1,40790%$1,259$1,259
MTLRAILFENCE - CMML METAL GUARD RAIL140.00$39.902019$5,58690%$4,999$4,999
WTANK2500TANK WATER 2500 GAL MUNI/INDUSTRIAL1.00$8,089.001995$8,08954%$4,328$4,328
PUMPS1SUB-PUMP 1/4HP COMMUNITY WATER SYS1.00$790.001995$79054%$423$423
PIPRAFENCE - METAL PIPE AVG20.00$26.602019$53290%$476$476
CC/L4TFENCE CC/L 4' W/ TOPRAIL80.00$20.762019$1,66190%$1,486$1,486
SH T2F1SHED W/FLOOR, ONE SIDE OPEN1510150.00$23.731995$3,56054%$1,904$1,904
SH T1F2SHED W/FLOOR COSTS, ALL SIDES CLOSED1020200.00$35.571995$7,11454%$3,806$3,806
CC/L8TFENCE CC/L 8' W/ TOPRAIL502.00$36.162019$18,15290%$16,246$16,246
CC/L6TFENCE CC/L 6' W/ TOPRAIL440.00$28.261995$12,43454%$6,652$6,652
C6CURBING 6"CONCRETE NO GUTTER PER LF350.00$14.732019$5,15690%$4,614$4,614
CG1CURBING 6"CONCRETE W/1'GUTTER PER LF364.00$21.742019$7,91390%$7,082$7,082
BBW6FENCE-BARB WIRE 5-6 STR AVG440.00$6.351995$2,79454%$1,495$1,495
XGUTGUTTER - CONCRETE CROSS, AT INTERSECTION98.00$11.062019$1,08490%$970$970
SHPDCK8DDOCK LOAD 8D WELL EXCAVATED CLS D-P1460840.00$22.602000$18,98461%$11,580$11,580
CBW8WALL - 8"CONCRETE BLOCK, REINFORCED4575.00$19.442019$88,93890%$79,600$79,600
CPRKLOTPARKING LOT-8" CFW9580.00$11.272000$107,96761%$65,860$65,860
RETAINWALL-RETAINING 8" PRECAST6120720.00$24.462019$17,61190%$15,762$15,762
ASPHCASPH COMMERCIAL52350.00$9.802000$513,03061%$312,948$312,948
RETAINWALL-RETAINING 8" PRECAST270.00$24.462019$6,60490%$5,911$5,911
C6CURBING 6"CONCRETE NO GUTTER PER LF485.00$14.732000$7,14461%$4,358$4,358
RETAINWALL-RETAINING 8" PRECAST165.00$24.462019$4,03690%$3,612$3,612
CSCCP1PORCH-CONCRETE,COVERED W/COMP. SHINGLE440.00$23.622000$10,39361%$6,340$6,340
RETAINWALL-RETAINING 8" PRECAST750.00$24.462019$18,34590%$16,419$16,419
CRANESPBRIDGE CRANEWAY SPAN 25 TON & UP100.00$479.002000$47,90061%$29,219$29,219
RETAINWALL-RETAINING 8" PRECAST5940.00$24.462019$145,29290%$130,037$130,037
CLGSLD15GATE-C/L15'WIDE SLIDER2.00$1,934.562000$3,86961%$2,360$2,360
CLGSLD20GATE-C/L20'WIDE SLIDER2.00$2,357.752000$4,71661%$2,876$2,876
SH T1F2SHED W/FLOOR COSTS, ALL SIDES CLOSED1216192.00$35.902019$6,89390%$6,170$6,170
SH T2F3SHED W/FLOOR, ONE SIDE OPEN2531775.00$29.882019$23,15790%$20,726$20,726
STLPOLELIGHT POLE - STEEL P/LF90.00$101.562000$9,14061%$5,576$5,576
MVLLIGHTS - MERCURY VAPOR, COST P/EACH9.00$1,548.002000$13,93261%$8,499$8,499
SH T23SHED SMALL/PUMPHOUSES-II, ONE SIDE OPEN25421050.00$24.602019$25,83090%$23,118$23,118
MVLLIGHTS - MERCURY VAPOR, COST P/EACH40.00$1,548.002019$61,92090%$55,418$55,418
SEPTICCSEPTIC SYS CMML 100L'LEACH LINE1.00$31,144.002001$31,14463%$19,465$19,465
MVLLIGHTS - MERCURY VAPOR, COST P/EACH30.00$1,548.002019$46,44090%$41,564$41,564
CC/L6TFENCE CC/L 6' W/ TOPRAIL1565.00$28.262005$44,22769%$30,295$30,295
CCBW6FENCE CC/L 6' BARBWIRE1565.00$4.902005$7,66969%$5,253$5,253
PITLUBE PIT, WALK-IN4.00$4,131.002019$16,52490%$14,789$14,789
BOLLARDPARKING BARRIER POSTS/BOLLARDS72.00$191.042019$13,75590%$12,311$12,311
CPS6PRIVACY SLATS-CC/L 6'700.00$17.472005$12,22969%$8,377$8,377
CRANESP2BRIDGE CRANEWAY SPAN 10-24 TONS648.00$412.002019$266,97690%$238,944$238,944
M&E 22SHEDS-M&E ONE SIDE OPEN18801440.00$22.792005$32,81369%$22,477$22,477
CRANESPBRIDGE CRANEWAY SPAN 25 TON & UP1524.00$479.002019$729,99690%$653,346$653,346
PATIOAPATIO RF-ALUMINUM630180.00$14.172009$2,55175%$1,900$1,900
STLPOLELIGHT POLE - STEEL P/LF918.00$101.562019$93,23290%$83,443$83,443
ASPHCASPH COMMERCIAL202401.00$9.802019$1,983,53090%$1,775,259$1,775,259
CPRKLOT6PARKING LOT 6" CFW1210.00$9.872019$11,94390%$10,689$10,689
CPRKLOT6PARKING LOT 6" CFW2905.00$9.872019$28,67290%$25,662$25,662
CPRKLOT6PARKING LOT 6" CFW6235.00$9.872019$61,53990%$55,078$55,078
CPRKLOT6PARKING LOT 6" CFW2530.00$9.872019$24,97190%$22,349$22,349
CPRKLOT6PARKING LOT 6" CFW2160.00$9.872019$21,31990%$19,081$19,081
CPRKLOT6PARKING LOT 6" CFW2037740.00$9.872019$7,30490%$6,537$6,537
CPRKLOT6PARKING LOT 6" CFW20172.00$9.872019$199,09890%$178,192$178,192
CPRKLOT6PARKING LOT 6" CFW25530.00$9.872019$251,98190%$225,523$225,523
CPRKLOTPARKING LOT-8" CFW28808.00$11.272019$324,66690%$290,576$290,576
MGLL6GATE - 6'CMML MTL W/LEVER LATCH2.00$342.002019$68490%$612$612
CLGSLD20GATE-C/L20'WIDE SLIDER2.00$2,735.592019$5,47190%$4,897$4,897
CFWCONC FLATWORK1460.00$6.461995$9,43254%$5,046$5,046
STAIRSTLSTAIRS-STEEL AVG 1 FLIGHT1.00$3,351.002019$3,35190%$2,999$2,999
STAIRSTLSTAIRS-STEEL AVG 1 FLIGHT2.00$3,351.002019$6,70290%$5,998$5,998
CFWCONC FLATWORK440.00$8.081995$3,55554%$1,902$1,902
SH T11SHED SMALL/PUMPHOUSE-I,ALL SIDES CLOSED894752.00$17.031995$12,80754%$6,852$6,852
BOLLARDPARKING BARRIER POSTS/BOLLARDS24.00$191.041995$4,58554%$2,453$2,453
COP2PORCH-CONCRETE OPEN W/STEPS14684.00$23.092023$1,94096%$1,852$1,852
COP2PORCH-CONCRETE OPEN W/STEPS11666.00$24.872023$1,64196%$1,568$1,568
COP2PORCH-CONCRETE OPEN W/STEPS8648.00$26.922023$1,29296%$1,234$1,234
COP2PORCH-CONCRETE OPEN W/STEPS9763.00$25.172023$1,58596%$1,514$1,514
COP2PORCH-CONCRETE OPEN W/STEPS207140.00$20.562023$2,87896%$2,749$2,749
SHPDCK8DDOCK LOAD 8D WELL EXCAVATED CLS D-P72312232.00$22.602023$50,44396%$48,173$48,173
CPRKLOTPARKING LOT-8" CFW23420.00$11.272023$263,94396%$252,066$252,066
BOLLARDPARKING BARRIER POSTS/BOLLARDS8.00$191.042023$1,52896%$1,460$1,460
MVLLIGHTS - MERCURY VAPOR, COST P/EACH15.00$1,548.002023$23,22096%$22,175$22,175
DECLIGHTLIGHTS-DECORATIVE FOR COMMERCIAL PROPTY5.00$291.002023$1,45596%$1,390$1,390
CFWCONC FLATWORK198.00$8.082023$1,60096%$1,528$1,528
RETAINWALL-RETAINING 8" PRECAST240.00$24.462023$5,87096%$5,606$5,606
MGLL8GATE - 8'CMML MTL W/LEVER LATCH2.00$371.002023$74296%$709$709
PIPRAFENCE - METAL PIPE AVG180.00$26.602023$4,78896%$4,573$4,573
DHFL5DOCK HEIGHT FLOORS (UP 5,000 SQ FT)114101140.00$10.822023$12,33596%$11,780$11,780
CFWCONC FLATWORK1549.00$6.462019$10,00790%$8,956$8,956
CPRKLOT6PARKING LOT 6" CFW8820.00$9.871995$87,05354%$46,574$46,574

Land Lines

CodeDescriptionZoneFrontDepthUnitsUnit TypeRateAcreageSq FtTotal AdjValue
510Commercial Industrial - retail or office use combined with Industrial useZLI1.00SITE$622,000.0031.1001.00$622,000

Personal Property

AccountSecured/
Unsecured
OwnerDescription
BU000105UnsecuredLINDE LEASED EQUIPMENTBU - BUSINESS EQUIPMENT
BU044471UnsecuredKOMATSU AMERICA CORPBU - BUSINESS EQUIPMENT
BU061301UnsecuredFORD STEEL COBU - BUSINESS EQUIPMENT
BU072795UnsecuredJOY GLOBAL SURFACE MINING INCBU - BUSINESS EQUIPMENT
BU250171UnsecuredREVCO LEASING COMPANYBU - BUSINESS EQUIPMENT

Building Sketches

Disclaimer

All parcel data on this page is for use by the Elko County Assessor for assessment purposes only. The summary data on this page may not be a complete representation of the parcel or of the improvements thereon. Building information, including unit counts and number of permitted units, should be verified with the appropriate building and planning agencies. Zoning information should be verified with the appropriate planning agency. All parcels are reappraised each year. This is a true and accurate copy of the records of the Elko County Assessor's Office as of July 26, 2025.