Parcel 001-679-017
Owners
JOY GLOBAL SURFACE MINING INC
751258
751258
135 S 84TH ST STE 300
MILWAUKEE, WI 53214-1478
Parcel Summary
Location | 4450 P & H DR NV |
---|---|
Use Code | 510: Commercial Industrial - retail or office use combined with Industrial use |
Tax District | 11.0: City of Elko |
Map Parcel | 754554 |
Acreage | 31.1000 |
Plat Maps | 001-679.pdf (1,049kb) |
Lineage | Combined from: 001-679-005 001-679-014 001-679-015 001-679-016 |
Additional Site Addresses
4451 P & H DR
4500 P & H DR
Keyline Description
THE PARCEL SHOWN ON MAP OF REVERSION TO ACREAGELOCATED IN
SEC/LOT: 30 TWN/BLOCK: 34N RNG: 55E ACRES: 0.00
MDB&M
ANNEXATION ORDINANCE 830 RECORDED AS DOCUMENT
740765
CREATED BY CONSOLIDATION OF THESE PARCELS
001-679-014 001-679-015 001-679-016 001-679-005
NO HARD COPY RECORDS, AUTOMATED RECORDS ONLY.
WHEN THIS MAP WAS RECORDED, IT WAS RECORDED WITH
A DESCRIPTION OF THE PARCEL, METES AND BOUNDS AS
IS REQUIRED BY LAW. THIS PARCEL NOW DESC AS
FOLLOWS:
A PARCEL OF LAND LOCATED IN SEC 30, TOWNSHIP
34N, GRANGE 55E, MDB&M MORE PARTICULARLY DESC AS
FOLLOWS:
BEG AT SAID NW COR OF SAID SEC 30, THE POB
AND RUNNING
TH: S 01¦02'00" W ALONG THE SECTION LINE
1323.99';
TH: S 89¦59'20" E 877.75';
TH: N 20¦44'31" E 223.89';
TH: N 89¦58'22" E 98.20';
TH: N 32¦02'04" E 1017.85' TO A PT ON THE S'LY
R/W LINE OF W IDAHO T, SAID PT BEING ON A
1160.00' NON-TANGENT RADIUS CURVE TO THE RIGHT;
TH: ALONG SAID S'LY R/W LINE AND SAID CURVE
232.84'(CHORD BEARS N 66¦37'50" W 232.45')TO A PT
ON A 20.00' RADIUS CURVE TO THE LEFT;
TH: ALONG SAID CURVE 30.40' (CHORD BEARS S
75¦34'45" W 27.56');
TH: S 32¦02'04" W 257.98' TO A PT ON A NON
TANGENT 61.00' CURVE TO THE RIGHT;
TH: ALONG SAID CURVE 109.22' (CHORD BEARS S
32¦02'04" W 95.21');
TH: S 32¦02'04" W 154.64' TI A OT IB A 240.00'
RAIDUS CURVE TO THE RIGHT;
TH: ALONG SAID CURVE 242.69' (CHORD BEARS
S 61¦00'14" W 232.48');
TH: S 89¦58'22" W 411.82';
TH: N 00¦01'38" W 80.00';
TH: N 89¦58'22" E 411.82' TO A PT ON A 160.00'
RADIUS CURVE TO THE LEFT;
TH: ALONG SAID CUVE 161.79' (CHORD BEARS
N 61¦00'16" E 154.98');
TH: N 32¦02'04" E 157.86' TO A PT ON A NON
TANGENT 61.00' RADIUS CURVE TO THE RIGHT;
TH: ALONG CURVE 99.38'(CHORD BEARS N 32¦02'04
E 88.75');
TH: N 32¦02'04" E 44.67';
TH: S 89¦58'22" W 219.40';
TH: N 00¦01'38" W 53.00';
TH: S 89¦58'22" W 482.63';
TH: N 00¦01'38" W 255.00';
TH: S 89¦58'22" W 446.34' TO THE POB.
PLUS 10781.00SF PER STREET VACATION RECORDED IN
CORRECTION DOCUMENT 754555
NEW TOTAL 31.347A SQUARE FOOTAGE GAINED DESCRIBED
AS FOLLOWS:
A PARCEL OF LAND SITUATE IN SEC 30 TWP 34N RGE
55E MDB&M DESC AS FOLLOWS:
BEG AT A POINT 709.83'S 01¦02'00" W ALONG THE SEC
LINE AND 459.48'E FROM THE NW COR OF SAID SEC 30,
SAID PT BEING ON TEH S'LY R/W LINE OF P&H DRIVE
AS DEDICATED BY PARCEL MAP FILE 452341;
RUNNING TH: N 00¦01'38" W ALONG THE W'LY R/W OF
SAID P&H DR;
TH:ALONG SAID N'LY AND MW'LY R/W LINE OF THE
FOLLOWING 3 COURSES:
N¦58'22" E 411.50' TO A PT ON A 160.00' RADIUS
CURVE TO THE LEFT;
TH:ALONG SAID CURVE 161.80'(CHORD BEARS
N 61¦00'19" E 154.99';
TH:N 32¦02'04" E 138.43';
TH:LEAVING SAID R/W S 57¦57'56" E 80.00' TO A PT
ON THE SE'LY R/W OF SAID P&H DR;
TH:ALONG SAID SE'LY AND S'LY R/W THE FOLLOWING
THREE COURSES:
S 32¦02'04" W 138.43' TO A PT ON A 240.00' RADIUS
CURVE TO THE RIGHT;
TH:ALONG SAID CURVE 242.69'(CHORD BEARS S
61¦00'14" W 232.48");
TH:S 89¦58'22" W 411.50 TO THE POB;
Value History
2025 | 2024 | 2023 | 2022 | 2021 | 2020 | 2019 | |
---|---|---|---|---|---|---|---|
Total Building Value | $44,957,766 | $45,332,978 | $39,597,954 | $34,848,997 | $33,029,257 | $33,522,446 | $3,035,169 |
Total Extra Features Value | $5,165,674 | $5,286,481 | $0 | $0 | $0 | $0 | $0 |
Total Secured Pers Prop | $0 | $0 | $0 | $0 | $0 | $0 | $0 |
Total Land Value | $622,000 | $622,000 | $626,940 | $626,940 | $626,940 | $626,940 | $622,000 |
Taxable Value | $50,745,440 | $51,241,459 | $40,224,894 | $35,475,937 | $33,656,197 | $34,149,386 | $3,657,169 |
Net Exemptions Value | $0 | $0 | $0 | $0 | $0 | $0 | $0 |
Net Assessed Value | $17,760,904 | $17,934,511 | $14,078,713 | $12,416,578 | $11,779,669 | $11,952,285 | $1,280,009 |
New Improvements | $0 | $7,034,201 | $0 | $0 | $0 | $30,616,571 | $0 |
New Land | $0 | $0 | $0 | $0 | $0 | $0 | $622,000 |
Document/Transfer/Sales History
Buildings
Building # 1, Section # 1, KOMATSU, Office Building
Type | Model | Heated Sq Ft | Repl Cost New | YrBlt | WAY | Other % Dpr | Normal % Dpr | % Cond | Value |
---|---|---|---|---|---|---|---|---|---|
COMM | 344 | 42840 | $5,123,210 | 2001 | 2001 | 0.00% | 36.00% | 64.00% | $3,278,854 |
Structural Elements
Building # 2, Section # 1, KOMATSU SERVICE GARAGE/INDUSTRIAL BLDG, Service Repair Garage
Type | Model | Heated Sq Ft | Repl Cost New | YrBlt | WAY | Other % Dpr | Normal % Dpr | % Cond | Value |
---|---|---|---|---|---|---|---|---|---|
COMM | 528 | 103370 | $29,904,991 | 2019 | 2019 | 0.00% | 9.00% | 91.00% | $27,213,542 |
Structural Elements
Type | Description | Code | Details |
---|---|---|---|
EW_C | EXT WALL-Commercial | 818 | Concrete, Tilt-Up |
HEAT_C | HEAT-Commercial | 606 | Space Heater |
HEAT_C | HEAT-Commercial | 618 | Evaporative Cooling |
HEAT_C | HEAT-Commercial | 611 | Package Unit |
ST | Number of Stories (COMM) | 1.00 | |
WH | Average Wall Height (COMM) | 35.00 | |
683 | Sprinkler System Wet - Commercial | 103370.00 | |
761 | Mezzanine - Office | 2160.00 | |
764 | Fire Alarm System | 103370.00 |
Building # 3, Section # 1, KOMATSU OFFICE BLDG, Office Building
Type | Model | Heated Sq Ft | Repl Cost New | YrBlt | WAY | Other % Dpr | Normal % Dpr | % Cond | Value |
---|---|---|---|---|---|---|---|---|---|
COMM | 344 | 20942 | $8,513,744 | 2019 | 2019 | 0.00% | 9.00% | 91.00% | $7,747,507 |
Structural Elements
Building # 4, Section # 1, PAINT BOOTH, Service Repair Garage
Building # 5, Section # 1, KOMATSU STORAGE WAREHOUSE, Storage Warehouse
Extra Features
Code | Description | Length | Width | Units | Unit Price | AYB | Repl Cost | % Good Condition | Dpr Value* | Final Value |
---|---|---|---|---|---|---|---|---|---|---|
CPRKLOT | PARKING LOT-8" CFW | 10 | 70 | 700.00 | $11.16 | 1995 | $7,812 | 55% | $4,297 | $4,297 |
CFW | CONC FLATWORK | 3554.00 | $6.05 | 2019 | $21,502 | 91% | $19,567 | $19,567 | ||
CPRKLOT | PARKING LOT-8" CFW | 54 | 94 | 5076.00 | $11.16 | 1995 | $56,648 | 55% | $31,156 | $31,156 |
PATIOA | PATIO RF-ALUMINUM | 4 | 18 | 72.00 | $14.16 | 2019 | $1,020 | 91% | $928 | $928 |
COMWELL2 | COMML WELL 8"-10" SYS PIPE CASING | 440.00 | $91.00 | 1995 | $40,040 | 55% | $22,022 | $22,022 | ||
COP2 | PORCH-CONCRETE OPEN W/STEPS | 6 | 9 | 54.00 | $26.05 | 2019 | $1,407 | 91% | $1,280 | $1,280 |
MTLRAIL | FENCE - CMML METAL GUARD RAIL | 140.00 | $39.50 | 2019 | $5,530 | 91% | $5,032 | $5,032 | ||
WTANK2500 | TANK WATER 2500 GAL MUNI/INDUSTRIAL | 1.00 | $7,801.00 | 1995 | $7,801 | 55% | $4,291 | $4,291 | ||
PUMPS1 | SUB-PUMP 1/4HP COMMUNITY WATER SYS | 1.00 | $788.00 | 1995 | $788 | 55% | $433 | $433 | ||
PIPRA | FENCE - METAL PIPE AVG | 20.00 | $26.11 | 2019 | $522 | 91% | $475 | $475 | ||
CC/L4T | FENCE CC/L 4' W/ TOPRAIL | 80.00 | $20.55 | 2019 | $1,644 | 91% | $1,496 | $1,496 | ||
SH T2F1 | SHED W/FLOOR, ONE SIDE OPEN | 15 | 10 | 150.00 | $23.73 | 1995 | $3,560 | 55% | $1,958 | $1,958 |
SH T1F2 | SHED W/FLOOR COSTS, ALL SIDES CLOSED | 10 | 20 | 200.00 | $35.57 | 1995 | $7,114 | 55% | $3,913 | $3,913 |
CC/L8T | FENCE CC/L 8' W/ TOPRAIL | 502.00 | $35.77 | 2019 | $17,957 | 91% | $16,340 | $16,340 | ||
CC/L6T | FENCE CC/L 6' W/ TOPRAIL | 440.00 | $27.97 | 1995 | $12,307 | 55% | $6,769 | $6,769 | ||
C6 | CURBING 6"CONCRETE NO GUTTER PER LF | 350.00 | $14.58 | 2019 | $5,103 | 91% | $4,644 | $4,644 | ||
CG1 | CURBING 6"CONCRETE W/1'GUTTER PER LF | 364.00 | $21.52 | 2019 | $7,833 | 91% | $7,128 | $7,128 | ||
BBW6 | FENCE-BARB WIRE 5-6 STR AVG | 440.00 | $6.18 | 1995 | $2,719 | 55% | $1,496 | $1,496 | ||
XGUT | GUTTER - CONCRETE CROSS, AT INTERSECTION | 98.00 | $10.94 | 2019 | $1,072 | 91% | $976 | $976 | ||
SHPDCK8D | DOCK LOAD 8D WELL EXCAVATED CLS D-P | 14 | 60 | 840.00 | $22.09 | 2000 | $18,556 | 63% | $11,597 | $11,597 |
CBW8 | WALL - 8"CONCRETE BLOCK, REINFORCED | 4575.00 | $19.43 | 2019 | $88,892 | 91% | $80,892 | $80,892 | ||
CPRKLOT | PARKING LOT-8" CFW | 9580.00 | $11.16 | 2000 | $106,913 | 63% | $66,821 | $66,821 | ||
RETAIN | WALL-RETAINING 8" PRECAST | 6 | 120 | 720.00 | $24.45 | 2019 | $17,604 | 91% | $16,020 | $16,020 |
ASPHC | ASPH COMMERCIAL | 52350.00 | $9.70 | 2000 | $507,795 | 63% | $317,372 | $317,372 | ||
RETAIN | WALL-RETAINING 8" PRECAST | 270.00 | $24.45 | 2019 | $6,602 | 91% | $6,007 | $6,007 | ||
C6 | CURBING 6"CONCRETE NO GUTTER PER LF | 485.00 | $14.58 | 2000 | $7,071 | 63% | $4,420 | $4,420 | ||
RETAIN | WALL-RETAINING 8" PRECAST | 165.00 | $24.45 | 2019 | $4,034 | 91% | $3,671 | $3,671 | ||
CSCCP1 | PORCH-CONCRETE,COVERED W/COMP. SHINGLE | 440.00 | $23.62 | 2000 | $10,393 | 63% | $6,496 | $6,496 | ||
RETAIN | WALL-RETAINING 8" PRECAST | 750.00 | $24.45 | 2019 | $18,338 | 91% | $16,687 | $16,687 | ||
CRANESP | BRIDGE CRANEWAY SPAN 25 TON & UP | 100.00 | $474.00 | 2000 | $47,400 | 63% | $29,625 | $29,625 | ||
RETAIN | WALL-RETAINING 8" PRECAST | 5940.00 | $24.45 | 2019 | $145,233 | 91% | $132,162 | $132,162 | ||
CLGSLD15 | GATE-C/L15'WIDE SLIDER | 2.00 | $1,915.20 | 2000 | $3,830 | 63% | $2,394 | $2,394 | ||
CLGSLD20 | GATE-C/L20'WIDE SLIDER | 2.00 | $2,334.15 | 2000 | $4,668 | 63% | $2,918 | $2,918 | ||
SH T1F2 | SHED W/FLOOR COSTS, ALL SIDES CLOSED | 12 | 16 | 192.00 | $35.90 | 2019 | $6,893 | 91% | $6,273 | $6,273 |
SH T2F3 | SHED W/FLOOR, ONE SIDE OPEN | 25 | 31 | 775.00 | $29.88 | 2019 | $23,157 | 91% | $21,073 | $21,073 |
STLPOLE | LIGHT POLE - STEEL P/LF | 90.00 | $100.55 | 2000 | $9,050 | 63% | $5,656 | $5,656 | ||
MVL | LIGHTS - MERCURY VAPOR, COST P/EACH | 9.00 | $1,532.00 | 2000 | $13,788 | 63% | $8,618 | $8,618 | ||
SH T23 | SHED SMALL/PUMPHOUSES-II, ONE SIDE OPEN | 25 | 42 | 1050.00 | $24.60 | 2019 | $25,830 | 91% | $23,505 | $23,505 |
MVL | LIGHTS - MERCURY VAPOR, COST P/EACH | 40.00 | $1,532.00 | 2019 | $61,280 | 91% | $55,765 | $55,765 | ||
SEPTICC | SEPTIC SYS CMML 100L'LEACH LINE | 1.00 | $30,827.00 | 2001 | $30,827 | 64% | $19,729 | $19,729 | ||
MVL | LIGHTS - MERCURY VAPOR, COST P/EACH | 30.00 | $1,532.00 | 2019 | $45,960 | 91% | $41,824 | $41,824 | ||
CC/L6T | FENCE CC/L 6' W/ TOPRAIL | 1565.00 | $27.97 | 2005 | $43,773 | 70% | $30,641 | $30,641 | ||
CCBW6 | FENCE CC/L 6' BARBWIRE | 1565.00 | $4.85 | 2005 | $7,590 | 70% | $5,313 | $5,313 | ||
PIT | LUBE PIT, WALK-IN | 4.00 | $4,133.00 | 2019 | $16,532 | 91% | $15,044 | $15,044 | ||
BOLLARD | PARKING BARRIER POSTS/BOLLARDS | 72.00 | $189.13 | 2019 | $13,617 | 91% | $12,392 | $12,392 | ||
CPS6 | PRIVACY SLATS-CC/L 6' | 700.00 | $17.30 | 2005 | $12,110 | 70% | $8,477 | $8,477 | ||
CRANESP2 | BRIDGE CRANEWAY SPAN 10-24 TONS | 648.00 | $408.00 | 2019 | $264,384 | 91% | $240,589 | $240,589 | ||
M&E 22 | SHEDS-M&E ONE SIDE OPEN | 18 | 80 | 1440.00 | $22.79 | 2005 | $32,813 | 70% | $22,969 | $22,969 |
CRANESP | BRIDGE CRANEWAY SPAN 25 TON & UP | 1524.00 | $474.00 | 2019 | $722,376 | 91% | $657,362 | $657,362 | ||
PATIOA | PATIO RF-ALUMINUM | 6 | 30 | 180.00 | $14.16 | 2009 | $2,549 | 76% | $1,937 | $1,937 |
STLPOLE | LIGHT POLE - STEEL P/LF | 918.00 | $100.55 | 2019 | $92,305 | 91% | $83,997 | $83,997 | ||
ASPHC | ASPH COMMERCIAL | 202401.00 | $9.70 | 2019 | $1,963,290 | 91% | $1,786,594 | $1,786,594 | ||
CPRKLOT6 | PARKING LOT 6" CFW | 1210.00 | $9.77 | 2019 | $11,822 | 91% | $10,758 | $10,758 | ||
CPRKLOT6 | PARKING LOT 6" CFW | 2905.00 | $9.77 | 2019 | $28,382 | 91% | $25,827 | $25,827 | ||
CPRKLOT6 | PARKING LOT 6" CFW | 6235.00 | $9.77 | 2019 | $60,916 | 91% | $55,434 | $55,434 | ||
CPRKLOT6 | PARKING LOT 6" CFW | 2530.00 | $9.77 | 2019 | $24,718 | 91% | $22,493 | $22,493 | ||
CPRKLOT6 | PARKING LOT 6" CFW | 2160.00 | $9.77 | 2019 | $21,103 | 91% | $19,204 | $19,204 | ||
CPRKLOT6 | PARKING LOT 6" CFW | 20 | 37 | 740.00 | $9.77 | 2019 | $7,230 | 91% | $6,579 | $6,579 |
CPRKLOT6 | PARKING LOT 6" CFW | 20172.00 | $9.77 | 2019 | $197,080 | 91% | $179,343 | $179,343 | ||
CPRKLOT6 | PARKING LOT 6" CFW | 25530.00 | $9.77 | 2019 | $249,428 | 91% | $226,980 | $226,980 | ||
CPRKLOT | PARKING LOT-8" CFW | 28808.00 | $11.16 | 2019 | $321,497 | 91% | $292,563 | $292,563 | ||
MGLL6 | GATE - 6'CMML MTL W/LEVER LATCH | 2.00 | $329.00 | 2019 | $658 | 91% | $599 | $599 | ||
CLGSLD20 | GATE-C/L20'WIDE SLIDER | 2.00 | $2,708.21 | 2019 | $5,416 | 91% | $4,929 | $4,929 | ||
CFW | CONC FLATWORK | 1460.00 | $6.45 | 1995 | $9,417 | 55% | $5,179 | $5,179 | ||
STAIRSTL | STAIRS-STEEL AVG 1 FLIGHT | 1.00 | $3,287.00 | 2019 | $3,287 | 91% | $2,991 | $2,991 | ||
STAIRSTL | STAIRS-STEEL AVG 1 FLIGHT | 2.00 | $3,287.00 | 2019 | $6,574 | 91% | $5,982 | $5,982 | ||
CFW | CONC FLATWORK | 440.00 | $8.07 | 1995 | $3,551 | 55% | $1,953 | $1,953 | ||
SH T11 | SHED SMALL/PUMPHOUSE-I,ALL SIDES CLOSED | 8 | 94 | 752.00 | $17.03 | 1995 | $12,807 | 55% | $7,044 | $7,044 |
BOLLARD | PARKING BARRIER POSTS/BOLLARDS | 24.00 | $189.13 | 1995 | $4,539 | 55% | $2,497 | $2,497 | ||
COP2 | PORCH-CONCRETE OPEN W/STEPS | 14 | 6 | 84.00 | $23.09 | 2023 | $1,940 | 97% | $1,881 | $1,881 |
COP2 | PORCH-CONCRETE OPEN W/STEPS | 11 | 6 | 66.00 | $24.87 | 2023 | $1,641 | 97% | $1,592 | $1,592 |
COP2 | PORCH-CONCRETE OPEN W/STEPS | 8 | 6 | 48.00 | $26.92 | 2023 | $1,292 | 97% | $1,253 | $1,253 |
COP2 | PORCH-CONCRETE OPEN W/STEPS | 9 | 7 | 63.00 | $25.17 | 2023 | $1,585 | 97% | $1,538 | $1,538 |
COP2 | PORCH-CONCRETE OPEN W/STEPS | 20 | 7 | 140.00 | $20.56 | 2023 | $2,878 | 97% | $2,792 | $2,792 |
SHPDCK8D | DOCK LOAD 8D WELL EXCAVATED CLS D-P | 72 | 31 | 2232.00 | $22.09 | 2023 | $49,305 | 97% | $47,826 | $47,826 |
CPRKLOT | PARKING LOT-8" CFW | 23420.00 | $11.16 | 2023 | $261,367 | 97% | $253,526 | $253,526 | ||
BOLLARD | PARKING BARRIER POSTS/BOLLARDS | 8.00 | $189.13 | 2023 | $1,513 | 97% | $1,468 | $1,468 | ||
MVL | LIGHTS - MERCURY VAPOR, COST P/EACH | 15.00 | $1,532.00 | 2023 | $22,980 | 97% | $22,291 | $22,291 | ||
DECLIGHT | LIGHTS-DECORATIVE FOR COMMERCIAL PROPTY | 5.00 | $288.00 | 2023 | $1,440 | 97% | $1,397 | $1,397 | ||
CFW | CONC FLATWORK | 198.00 | $8.07 | 2023 | $1,598 | 97% | $1,550 | $1,550 | ||
RETAIN | WALL-RETAINING 8" PRECAST | 240.00 | $24.45 | 2023 | $5,868 | 97% | $5,692 | $5,692 | ||
MGLL8 | GATE - 8'CMML MTL W/LEVER LATCH | 2.00 | $375.00 | 2023 | $750 | 97% | $728 | $728 | ||
PIPRA | FENCE - METAL PIPE AVG | 180.00 | $26.11 | 2023 | $4,700 | 97% | $4,559 | $4,559 | ||
DHFL5 | DOCK HEIGHT FLOORS (UP 5,000 SQ FT) | 114 | 10 | 1140.00 | $10.58 | 2023 | $12,061 | 97% | $11,699 | $11,699 |
CFW | CONC FLATWORK | 1549.00 | $6.45 | 2019 | $9,991 | 91% | $9,092 | $9,092 | ||
CPRKLOT6 | PARKING LOT 6" CFW | 8820.00 | $9.77 | 1995 | $86,171 | 55% | $47,394 | $47,394 |
Land Lines
Personal Property
Account | Secured/ Unsecured | Owner | Description |
---|---|---|---|
BU000105 | Unsecured | LINDE LEASED EQUIPMENT | BU - BUSINESS EQUIPMENT |
BU044471 | Unsecured | KOMATSU AMERICA CORP | BU - BUSINESS EQUIPMENT |
BU061301 | Unsecured | FORD STEEL CO | BU - BUSINESS EQUIPMENT |
BU072795 | Unsecured | JOY GLOBAL SURFACE MINING INC | BU - BUSINESS EQUIPMENT |
BU250171 | Unsecured | REVCO LEASING COMPANY | BU - BUSINESS EQUIPMENT |
Disclaimer
All parcel data on this page is for use by the Elko County Assessor for assessment purposes only. The summary data on this page may not be a complete representation of the parcel or of the improvements thereon. Building information, including unit counts and number of permitted units, should be verified with the appropriate building and planning agencies. Zoning information should be verified with the appropriate planning agency. All parcels are reappraised each year. This is a true and accurate copy of the records of the Elko County Assessor's Office as of April 21, 2025.