Parcel 002-760-008
Owners
CFJ PROPERTIES
C/O PILOT TRAVEL CENTERS #692
PO BOX 54470
LEXINGTON, KY 40555-4470
Parcel Summary
Location | 156 S US HWY 93 WELLS CITY, NV |
---|---|
Use Code | 513: Truck Stops |
Tax District | 12.5: Wells GID - Redevelopment |
Acreage | 15.0100 |
Section | 10 |
Township | 37N |
Range | 62E |
Plat Maps | 002-760.pdf (1,057kb) |
Keyline Description
A PARCEL LOCATED IN THE S2 OFSEC/LOT: 10 TWN/BLOCK: 37N RNG: 62E ACRES: 0.00
MDB&M DESCRIBED AS FOLLOWS:
COMM AT THE S1/4 COR OF SAID SEC 10;
TH: N 70¦22'07" W 175.37' TO A PT ON THE
PROPOSED N'LY R/W LINE OF A 60.0' WIDE
FRONTAGE RD & THE POB;
TH: ALONG SAID PROPOSED N'LY R/W LINE S
89¦38'39" W 544.46' TO A 720.00' RADIUS
TANGENT CURVE TO THE RIGHT;
TH: ALONG SAID CURVE AN ARC DISTANCE OF
279.64';
TH: N 68¦06'10" W 105.71' TO A PT ON THE E'LY
R/W LINE OF US HWY 93;
TH: ALONG SAID E'LY R/W LINE N 21¦53'50" E
529.08' TO A PT ON THE SE'LY R/W LINE OF THE
PROPOSED I-80;
TH: ALONG SAID S'LY R/W LINE S 75¦30'13" E A
DIST OF 648.13' TO A 7875.00' RADIUS
TANGENT CURVE TO THE LEFT;
TH: ALONG SAID CURVE AN ARC DIST OF 918.52';
TH: S 00¦21'21" E 234.00' TO A PT ON THE N'LY
R/W LINE OF SAID 60.00' WIDE FRONTAGE RD;
TH: ALONG SAID N'LYH R/W LINE S 89¦38'39" W A
DIST OF 811.40' TO THE POB
CONT:
ROS FILE 302573
Value History
2025 | 2024 | 2023 | 2022 | 2021 | 2020 | 2019 | |
---|---|---|---|---|---|---|---|
Total Building Value | $1,223,333 | $1,269,463 | $3,562,829 | $2,994,697 | $2,909,131 | $2,955,994 | $2,925,894 |
Total Extra Features Value | $3,008,514 | $3,106,992 | $0 | $0 | $0 | $0 | $0 |
Total Secured Pers Prop | $0 | $0 | $0 | $0 | $0 | $0 | $0 |
Total Land Value | $480,320 | $480,320 | $300,457 | $300,457 | $300,457 | $300,457 | $300,457 |
Taxable Value | $4,712,167 | $4,856,775 | $3,863,286 | $3,295,154 | $3,209,589 | $3,256,451 | $3,226,351 |
Net Exemptions Value | $0 | $0 | $0 | $0 | $0 | $0 | $0 |
Net Assessed Value | $1,649,258 | $1,699,871 | $1,352,150 | $1,153,304 | $1,123,356 | $1,139,758 | $1,129,223 |
New Improvements | $0 | $1,099,485 | $0 | $0 | $0 | $0 | $0 |
New Land | $0 | $0 | $0 | $0 | $0 | $0 | $0 |
Document/Transfer/Sales History
Buildings
Building # 1, Section # 1, FLYING J TRUCK STOP, Truck Stop
Extra Features
Code | Description | Length | Width | Units | Unit Price | AYB | Repl Cost | % Good Condition | Dpr Value* | Final Value |
---|---|---|---|---|---|---|---|---|---|---|
CFW | CONC FLATWORK | 14581.00 | $6.05 | 1994 | $88,215 | 54% | $47,195 | $47,195 | ||
CANOPYSG | GAS STN CANOPY GOOD STEEL COST P/SF | 5703.00 | $60.17 | 1994 | $343,150 | 54% | $183,585 | $183,585 | ||
ASPHC | ASPH COMMERCIAL | 304094.00 | $9.70 | 1994 | $2,949,712 | 54% | $1,578,096 | $1,578,096 | ||
CANOPYSG | GAS STN CANOPY GOOD STEEL COST P/SF | 3150.00 | $60.17 | 1994 | $189,536 | 54% | $101,401 | $101,401 | ||
FUG2000 | FUEL STRG U/G 20,000 GAL | 3.00 | $139,319.00 | 1994 | $417,957 | 54% | $223,607 | $223,607 | ||
FUG100 | FUEL STRG U/G 10,000 GAL | 3.00 | $46,907.00 | 1994 | $140,721 | 54% | $75,286 | $75,286 | ||
CONISG | ISLAND - CONCRETE GOOD - SF | 2283.00 | $23.89 | 1994 | $54,541 | 54% | $29,179 | $29,179 | ||
STLPOLE | LIGHT POLE - STEEL P/LF | 380.00 | $100.55 | 1994 | $38,209 | 54% | $20,442 | $20,442 | ||
CANOPYSG | GAS STN CANOPY GOOD STEEL COST P/SF | 493.00 | $60.17 | 1994 | $29,664 | 54% | $15,870 | $15,870 | ||
MVL | LIGHTS - MERCURY VAPOR, COST P/EACH | 16.00 | $1,532.00 | 1994 | $24,512 | 54% | $13,114 | $13,114 | ||
CC/L6T | FENCE CC/L 6' W/ TOPRAIL | 300.00 | $27.97 | 1994 | $8,391 | 54% | $4,489 | $4,489 | ||
C6 | CURBING 6"CONCRETE NO GUTTER PER LF | 511.00 | $14.58 | 1994 | $7,450 | 54% | $3,986 | $3,986 | ||
CG2 | CURBING 6"CONCRETE W/2'GUTTER PER LF | 3959.00 | $24.72 | 1994 | $97,866 | 54% | $52,359 | $52,359 | ||
XGUT | GUTTER - CONCRETE CROSS, AT INTERSECTION | 6112.00 | $10.94 | 1994 | $66,865 | 54% | $35,773 | $35,773 | ||
CANOPYSG | GAS STN CANOPY GOOD STEEL COST P/SF | 10 | 26 | 260.00 | $60.17 | 2012 | $15,644 | 81% | $12,594 | $12,594 |
CANOPYSA | GAS STN CANOPY AVE STEEL COST P/SF | 32 | 36 | 1152.00 | $46.98 | 2012 | $54,121 | 81% | $43,567 | $43,567 |
PAG1200 | FUEL STRG A/G VAULTED DBL/WALL 12,000G | 1.00 | $317,786.00 | 2012 | $317,786 | 81% | $255,818 | $255,818 | ||
SHPDCK8C | DOCK LOAD 8C WELL EXCAVATED CLASS C | 26 | 34 | 884.00 | $22.29 | 2012 | $19,704 | 81% | $15,862 | $15,862 |
CPRKLOT | PARKING LOT-8" CFW | 5272.00 | $11.16 | 2012 | $58,836 | 81% | $47,363 | $47,363 | ||
CNCBW8 | WALL - COMM'L 8" C/BLOCK, REINFORCED | 1304.00 | $18.49 | 2012 | $24,111 | 81% | $19,409 | $19,409 | ||
CC/L4T | FENCE CC/L 4' W/ TOPRAIL | 108.00 | $20.55 | 2012 | $2,219 | 81% | $1,787 | $1,787 | ||
CC/L8T | FENCE CC/L 8' W/ TOPRAIL | 104.00 | $35.77 | 2012 | $3,720 | 81% | $2,995 | $2,995 | ||
STLPOLE | LIGHT POLE - STEEL P/LF | 48.00 | $100.55 | 2012 | $4,826 | 81% | $3,885 | $3,885 | ||
MHYDLTS | LIGHTS - METAL HALIDE, COST PER EA | 4.00 | $1,724.00 | 2012 | $6,896 | 81% | $5,551 | $5,551 | ||
CLGSWG3 | GATE-C/L 3'WIDE SWINGING CLASS=HEIGHT | 2.00 | $664.34 | 2012 | $1,329 | 81% | $1,070 | $1,070 | ||
SUBPUMP3 | GAS STN 1 1/2HP SUBMRGD PUMP | 1.00 | $3,668.00 | 2012 | $3,668 | 81% | $2,953 | $2,953 | ||
PIPETANK | GAS STN PIPE-COST PER TANK | 1.00 | $1,342.00 | 2012 | $1,342 | 81% | $1,080 | $1,080 | ||
PIPEDISP | GAS STN PIPING-COST PER PRODUCT | 2.00 | $2,057.00 | 2012 | $4,114 | 81% | $3,312 | $3,312 | ||
BOLLARD | PARKING BARRIER POSTS/BOLLARDS | 43.00 | $189.13 | 2012 | $8,133 | 81% | $6,547 | $6,547 | ||
CANOPYSG | GAS STN CANOPY GOOD STEEL COST P/SF | 25 | 36 | 900.00 | $60.17 | 2014 | $54,153 | 84% | $45,218 | $45,218 |
CFW | CONC FLATWORK | 47925.00 | $6.05 | 1994 | $289,946 | 54% | $155,121 | $155,121 |
Land Lines
Personal Property
Account | Secured/ Unsecured | Owner | Description |
---|---|---|---|
BU060113 | Unsecured | CFJ PROPERTIES (PILOT FLYING J) | BU - BUSINESS EQUIPMENT |
BU220095 | Unsecured | IGT | BU - BUSINESS EQUIPMENT |
BU250293 | Unsecured | REGIONS COMMERCIAL EQUIPMENT FINANCE, LTD | BU - BUSINESS EQUIPMENT |
Disclaimer
All parcel data on this page is for use by the Elko County Assessor for assessment purposes only. The summary data on this page may not be a complete representation of the parcel or of the improvements thereon. Building information, including unit counts and number of permitted units, should be verified with the appropriate building and planning agencies. Zoning information should be verified with the appropriate planning agency. All parcels are reappraised each year. This is a true and accurate copy of the records of the Elko County Assessor's Office as of April 22, 2025.