Parcel 001-560-021
Owners
811568
ATTN: DAVID ROSEBERG, MAVERICK GAMING
12530 NE 144TH ST
KIRKLAND, WA 98034-4508
Parcel Summary
Location | 2065 IDAHO ST ELKO CITY, NV |
---|---|
Use Code | 420: Casino or Hotel Casino |
Tax District | 11.0: City of Elko |
Section | 11 |
Township | 34N |
Range | 55E |
Acreage | 10.7900 |
Plat Maps | 001-560.pdf (1,667kb) |
Additional Site Addresses
2075 IDAHO ST 101
2075 IDAHO ST 102
2085 IDAHO ST 101
2085 IDAHO ST 102
Value History
2024 | 2023 | 2022 | 2021 | 2020 | 2019 | 2018 | |
---|---|---|---|---|---|---|---|
Total Building Value | $15,944,072 | $15,516,491 | $13,168,974 | $13,118,429 | $13,617,177 | $13,493,977 | $13,251,371 |
Total Extra Features Value | $1,515,680 | $0 | $0 | $0 | $0 | $0 | $0 |
Total Secured Pers Prop | $885,176 | $736,509 | $862,034 | $515,160 | $706,506 | $655,829 | $1,974,409 |
Total Land Value | $1,079,000 | $1,079,000 | $1,079,000 | $1,079,000 | $1,079,000 | $1,079,000 | $1,079,000 |
Taxable Value | $19,423,928 | $17,332,000 | $15,110,009 | $14,712,589 | $15,402,683 | $15,228,806 | $16,304,780 |
Net Exemptions Value | $0 | $0 | $0 | $0 | $0 | $0 | $0 |
Net Assessed Value | $6,798,375 | $6,066,200 | $5,288,503 | $5,149,406 | $5,390,939 | $5,330,082 | $5,706,673 |
New Improvements | $295,063 | $113,003 | $0 | $0 | $0 | $0 | $0 |
New Land | $0 | $0 | $0 | $0 | $0 | $0 | $0 |
Document/Transfer/Sales History
Buildings
Building # 1, Section # 1, DUPLEX, Duplex
Type | Model | Heated Sq Ft | Repl Cost New | YrBlt | WAY | Other % Dpr | Normal % Dpr | % Cond | Value |
---|---|---|---|---|---|---|---|---|---|
RES | 05 | 3022 | $374,701 | 1987 | 1987 | 0.00% | 57.00% | 43.00% | $161,121 |
Structural Elements
Type | Description | Code | Details |
---|---|---|---|
ROOF | ROOF | 0208 | Composition Shingle |
EW | EXT WALL | 0105 | Frame, Siding |
HEAT | HEAT | 0351 | Warmed & Cooled Air |
0502 | Automatic Appliance Allowance | 1.00 | |
0601 | Plumbing Fixtures -# | 12.00 | |
0602 | Plumbing Fixtures Rough-ins -# | 2.00 | |
SBFL | SubFloor (RES) | 0622 | Raised Subfloor (%) |
HILL | Hillside Slope Adjustment | 1 | Flat |
0402 | Automatic Floor Cover Allowance | 1.00 | |
0701 | Attached Garage | 576.00 | |
0901 | Open Slab Porch (SF) | 792.00 | |
0904 | Slab Porch with Roof (SF) | 32.00 | |
SFA | # Single-Family Attached Units | 2.00 |
Building # 2, Section # 1, RED LION INN & CASINO, Casino
Type | Model | Heated Sq Ft | Repl Cost New | YrBlt | WAY | Other % Dpr | Normal % Dpr | % Cond | Value |
---|---|---|---|---|---|---|---|---|---|
COMM | 515 | 178141 | $37,941,554 | 1983 | 1983 | 0.00% | 63.00% | 37.00% | $14,038,375 |
Structural Elements
Type | Description | Code | Details |
---|---|---|---|
EW_C | EXT WALL-Commercial | 882 | Stud Walls - Brick Veneer |
HEAT_C | HEAT-Commercial | 617 | HVAC |
ST | Number of Stories (COMM) | 1.00 | |
WH | Average Wall Height (COMM) | 18.00 | |
SHP | Shape (COMM) | 3 | Slightly Irregular |
683 | Sprinkler System Wet - Commercial | 178141.00 | |
751 | Balcony | 4752.00 | |
761 | Mezzanine - Office | 2970.00 | |
764 | Fire Alarm System | 57089.00 |
Building # 2, Section # 2, HOTEL AND CASINO Basement, BASEMENT SEMIFINISHED - COMMERCIAL
Building # 3, Section # 1, DUPLEX, Duplex
Type | Model | Heated Sq Ft | Repl Cost New | YrBlt | WAY | Other % Dpr | Normal % Dpr | % Cond | Value |
---|---|---|---|---|---|---|---|---|---|
RES | 05 | 2280 | $304,636 | 1987 | 1987 | 0.00% | 57.00% | 43.00% | $130,993 |
Structural Elements
Type | Description | Code | Details |
---|---|---|---|
ROOF | ROOF | 0208 | Composition Shingle |
EW | EXT WALL | 0105 | Frame, Siding |
HEAT | HEAT | 0351 | Warmed & Cooled Air |
0502 | Automatic Appliance Allowance | 1.00 | |
0601 | Plumbing Fixtures -# | 12.00 | |
0602 | Plumbing Fixtures Rough-ins -# | 2.00 | |
SBFL | SubFloor (RES) | 0622 | Raised Subfloor (%) |
HILL | Hillside Slope Adjustment | 1 | Flat |
0402 | Automatic Floor Cover Allowance | 1.00 | |
0701 | Attached Garage | 576.00 | |
0901 | Open Slab Porch (SF) | 768.00 | |
0901 | Open Slab Porch (SF) | 32.00 |
Extra Features
Code | Description | Length | Width | Units | Unit Price | AYB | Repl Cost | % Good Condition | Dpr Value* | Final Value |
---|---|---|---|---|---|---|---|---|---|---|
CFW | CONC FLATWORK | 2794.00 | $6 | 1983 | $18,021 | 37% | $6,668 | $6,668 | ||
CFW | CONC FLATWORK | 13253.00 | $6 | 1983 | $80,181 | 37% | $29,667 | $29,667 | ||
WIF | FENCE - RES WR/IRON,STEEL,ALUM, PER SF | 168.00 | $12 | 1983 | $2,041 | 37% | $755 | $755 | ||
WIGATE | GATE - RES FENCE WR/IRON P/SF | 24.00 | $18 | 1983 | $438 | 37% | $162 | $162 | ||
COP1 | PORCH-CONCRETE OPEN SLAB | 28.00 | $12 | 1983 | $324 | 37% | $120 | $120 | ||
CSCCP1 | PORCH-CONCRETE,COVERED W/COMP. SHINGLE | 354.00 | $24 | 1983 | $8,361 | 37% | $3,094 | $3,094 | ||
SHPDCK8D | DOCK LOAD 8D WELL EXCAVATED CLS D-P | 264.00 | $22 | 1983 | $5,832 | 37% | $2,158 | $2,158 | ||
SHPDCK8D | DOCK LOAD 8D WELL EXCAVATED CLS D-P | 646.00 | $22 | 1983 | $14,270 | 37% | $5,280 | $5,280 | ||
MVL | LIGHTS - MERCURY VAPOR, COST P/EACH | 4.00 | $1,532 | 1983 | $6,128 | 37% | $2,267 | $2,267 | ||
CG1 | CURBING 6"CONCRETE W/1'GUTTER PER LF | 420.00 | $22 | 1983 | $9,038 | 37% | $3,344 | $3,344 | ||
C6 | CURBING 6"CONCRETE NO GUTTER PER LF | 5204.00 | $15 | 1983 | $75,874 | 37% | $28,073 | $28,073 | ||
PRKBMPC | PARKING BUMPERS PRECAST CONC - LF | 516.00 | $9 | 1983 | $4,582 | 37% | $1,695 | $1,695 | ||
STLPOLE | LIGHT POLE - STEEL P/LF | 264.00 | $101 | 1983 | $26,545 | 37% | $9,822 | $9,822 | ||
MVL | LIGHTS - MERCURY VAPOR, COST P/EACH | 22.00 | $1,532 | 1983 | $33,704 | 37% | $12,470 | $12,470 | ||
STLPOLE | LIGHT POLE - STEEL P/LF | 210.00 | $101 | 1983 | $21,116 | 37% | $7,813 | $7,813 | ||
MVL | LIGHTS - MERCURY VAPOR, COST P/EACH | 14.00 | $1,532 | 1983 | $21,448 | 37% | $7,936 | $7,936 | ||
SHPDCK8D | DOCK LOAD 8D WELL EXCAVATED CLS D-P | 1300.00 | $22 | 1983 | $28,717 | 37% | $10,625 | $10,625 | ||
CCBW6 | FENCE CC/L 6' BARBWIRE | 11520.00 | $5 | 1984 | $55,872 | 39% | $21,511 | $21,511 | ||
WIF | FENCE - RES WR/IRON,STEEL,ALUM, PER SF | 1600.00 | $12 | 1984 | $19,440 | 39% | $7,484 | $7,484 | ||
MECHROOM | MECHANICAL ROOM, COMM'L BLDGS, PER SF | 380.00 | $99 | 1984 | $37,704 | 39% | $14,516 | $14,516 | ||
ASPHC | ASPH COMMERCIAL | 269390.00 | $10 | 1987 | $2,613,083 | 43% | $1,123,626 | $1,123,626 | ||
CFW | CONC FLATWORK | 295.00 | $8 | 1987 | $2,381 | 43% | $1,024 | $1,024 | ||
C6 | CURBING 6"CONCRETE NO GUTTER PER LF | 490.00 | $15 | 1987 | $7,144 | 43% | $3,072 | $3,072 | ||
FAG550 | FUEL STRG A/G 550 GAL | 1.00 | $6,231 | 2012 | $6,231 | 81% | $5,016 | $5,016 | ||
PATIOA | PATIO RF-ALUMINUM | 10 | 30 | 300.00 | $14 | 2012 | $4,248 | 81% | $3,420 | $3,420 |
MQAVGD | MARQUEE-AVG MTL ORN/STL FRM CLASS D-P | 3240.00 | $80 | 1983 | $259,783 | 37% | $96,120 | $96,120 | ||
MQ2AVGD | MARQUEE-AVG MTL PLAIN/WD FR CLASS D-P | 143.00 | $57 | 1983 | $8,207 | 37% | $3,037 | $3,037 | ||
POOLSL | SWIMMING POOL - LOW P/SF RESIDENTIAL | 1136.00 | $88 | 1983 | $99,650 | 37% | $36,870 | $36,870 |
Land Lines
Personal Property
Account | Secured/ Unsecured | Owner | Description |
---|---|---|---|
BS000104 | Secured | PROJECT EVERGREEN NV OWNER LLC | BS - BUSINESS EQUIPMENT |
BU055816 | Unsecured | QUICK DISPENSE INC. | BU - BUSINESS EQUIPMENT |
BU071722 | Unsecured | IGT | BU - BUSINESS EQUIPMENT |
BU071755 | Unsecured | IGT | BU - BUSINESS EQUIPMENT |
BU099061 | Unsecured | ARISTOCRAT TECHNOLOGIES INC | BU - BUSINESS EQUIPMENT |
BU213101 | Unsecured | MASSAGE WORKS | BU - BUSINESS EQUIPMENT |
BU215077 | Unsecured | JOHNSON, JACQUELINE | BU - BUSINESS EQUIPMENT |
BU220275 | Unsecured | SAMANTHA ASHLEY HAIR | BU - BUSINESS EQUIPMENT |
BU240025 | Unsecured | FACIALS WITH JOY | BU - BUSINESS EQUIPMENT |
Disclaimer
All parcel data on this page is for use by the Elko County Assessor for assessment purposes only. The summary data on this page may not be a complete representation of the parcel or of the improvements thereon. Building information, including unit counts and number of permitted units, should be verified with the appropriate building and planning agencies. Zoning information should be verified with the appropriate planning agency. All parcels are reappraised each year. This is a true and accurate copy of the records of the Elko County Assessor's Office as of November 24, 2024.