Parcel 001-01A-021
Owners
OSM RABBITBRUSH RUN LLC
794459
794459
1516 S BUNDY DR STE 300
LOS ANGELES, CA 90025-2681
Parcel Summary
Location | 3700 SUNDANCE DR ELKO CITY, NV |
---|---|
Use Code | 340: Five or More Units - High Rise |
Tax District | 11.0: City of Elko |
Map Parcel | 679862 P1 |
Acreage | 10.3880 |
Section | 17 |
Township | 34N |
Range | 55E |
Plat Maps | 001-01A.pdf (1,044kb) |
Lineage | Split from 001-01A-020 |
Additional Site Addresses
MOUNTAIN CITY HWY
SEC 8 TWP 34N RGE 55E MDB&M
Keyline Description
N2NE4NW4;SEC/LOT: 17 TWN/BLOCK: 34N RNG: 55E ACRES: 0.00
MDB&M
LESS 2.18A TO HWY R/W
LESS 1.43A TO STATE HWY 112/499
** NOTE: PREVIOUSLY ASSESSED UNDER 006-09F-007
ANNEXED INTO ELKO CITY PER ORDINANCE 676 & 678
MAP FILE 580111 & RECORDED DOC'S 580109 & 580110
PLUS 1.52A PER DOCUMENT 599429
LESS 0.17A PER DOCUMEMT 599428
LESS 0.171A PER DOCUMENT 599427
AND:
LESS: 0.250A TO ELKO COUNTY PER DOCUMENT 616672
SAID PARCEL LOCATED IN THE N2NE4NW4 OF
SEC/LOT: 17 TWN/BLOCK: 34N RNG: 55E ACRES: 0.00
MDB&M AND DESCRIBED AS FOLLOWS:
COMM AT THE N4 COR OF SAID 17, A PT FROM WHICH
THE NORTHWEST COR OF SAID SEC 17 BEARS
S 89¦38'12" W 2658.31';
TH: S 89¦38'12" W 1245.02' ALONG THE N LINE OF
SAID SEC 17 TO COR 1, THE TRUE POB.
TH: CONT S 89¦38'12" W 84.14' ALONG THE SAID
NORTH LINE OF SECTION 17 TO COR 2, A PT BEING
THE NW COR OF THE N2NE4NW4 OF SAID SEC 17 AND
ALSO BEING ON THE C/L OF SUNDANCE DR;
TH: S 00¦20'18" E 258.58' ALONG THE WEST LINE
OF THE N2NE4NW4 OF SAID SEC 17 AND ALSO BEING
ALONG THE C/L OF SUNDANCE DR TO COR 3;
TH: N 17¦41'00" E 271.96' TO COR 1, THE POB.
AND:
PLUS: 0.256 AC TO PARCEL 001-01A-015 (HELEN K
HARRIS TRUST) PER DOC # 611774
BEING A PORTION OF LAND LOCATED IN A PORTION OF
SEC/LOT: 8 TWN/BLOCK: 34N RNG: 55E ACRES: 0.00
MDB&M. DESC AS FOLLOWS:
COMM AT THE S 1/4 COR OF SAID SEC 8, A PT FROM
WHICH THE SW COR OF SAID SEC 8 BEARS 89¦38'21" W,
2658.31 FT, TH: S 89¦38'12" W, 1000.97 FT ALONG
THE S LINE OF SEC 8 TO COR #1, THE TRUE P.O.B.
TH: CONT S 89¦38'12" W 244.05 FT ALONG THE SAID
S LINE OF SEC 8 TO COR #2;
TH: N 17¦41'00" E, 96.16 FT TO COR #3, A PT BEING
ON THE S'LY R/WAY OF NEV STATE RTE 228;
TH: S 67¦15'10" E 232.95 FT, ALONG THE SAID S'LY
R/WAY OF NEV ST RTE 228 TO COR 1, THE P.O.B.
NEW ACREAGE TOTAL IS :
(THIS SMALL 0.256A PORTION WAS ANNEXED IN TO THE
CITY PER ANNEXATION ORDINANCE 737 ENACTED
07262011. ADDITIONAL ACREAGE IN THE HWY R/W WAS
ALSO TAKEN IN TO THE CITY LIMITS PER THAT
ORDINANCE.
PARCEL 1 MAP FILE 679862
LOCATED IN
SEC/LOT: 8,17 TWN/BLOCK: 34N RNG: 55E ACRES: 0.00
MDB&M
TWO PARCELS, 001-01A-015 AND 001-01A-019 HAD TO
BE CONSOLIDATED IN TO ONE PARCEL SO THAT MAP
679862 COULD BE PROCESSED. THIS PARCEL ONLY
EXISTED FOR ABOUT 4 MINUTES.
FORMERLY 001-01A-020
Value History
2025 | 2024 | 2023 | 2022 | 2021 | 2020 | 2019 | |
---|---|---|---|---|---|---|---|
Total Building Value | $26,220,347 | $27,296,600 | $25,368,663 | $22,302,917 | $21,787,703 | $21,880,406 | $21,380,474 |
Total Extra Features Value | $1,565,071 | $1,605,402 | $0 | $0 | $0 | $0 | $0 |
Total Secured Pers Prop | $0 | $0 | $0 | $0 | $0 | $0 | $0 |
Total Land Value | $500,051 | $500,051 | $500,051 | $500,051 | $500,051 | $500,051 | $500,051 |
Taxable Value | $28,285,469 | $29,402,053 | $25,868,714 | $22,802,969 | $22,287,754 | $22,380,457 | $21,880,526 |
Net Exemptions Value | $0 | $0 | $0 | $0 | $0 | $0 | $0 |
Net Assessed Value | $9,899,914 | $10,290,719 | $9,054,050 | $7,981,039 | $7,800,714 | $7,833,160 | $7,658,184 |
New Improvements | $0 | $0 | $0 | $0 | $0 | $0 | $0 |
New Land | $0 | $0 | $0 | $0 | $0 | $0 | $0 |
Document/Transfer/Sales History
Buildings
Building # 1, Section # 1, APT BLDG A, Low-Rise Multiple
Type | Model | Heated Sq Ft | Repl Cost New | YrBlt | WAY | Other % Dpr | Normal % Dpr | % Cond | Value |
---|---|---|---|---|---|---|---|---|---|
RES | 03 | 13186 | $1,925,633 | 2012 | 2012 | 0.00% | 19.50% | 80.50% | $1,550,135 |
Structural Elements
Type | Description | Code | Details |
---|---|---|---|
ROOF | ROOF | 0208 | Composition Shingle |
EW | EXT WALL | 0109 | Frame, Stucco |
EW | EXT WALL | 0134 | Veneer, Stone |
HEAT | HEAT | 0351 | Warmed & Cooled Air |
0502 | Automatic Appliance Allowance | 1.00 | |
0601 | Plumbing Fixtures -# | 120.00 | |
0602 | Plumbing Fixtures Rough-ins -# | 12.00 | |
SBFL | SubFloor (RES) | 0622 | Raised Subfloor (%) |
M#UNITS | Number of MultiFamily Units | 12.00 | |
0402 | Automatic Floor Cover Allowance | 1.00 | |
0901 | Open Slab Porch (SF) | 228.00 | |
0904 | Slab Porch with Roof (SF) | 514.00 | |
1006 | Cement Balcony (SF) Iron Rails Plastered Soffit | 228.00 | |
1014 | Cement Balcony w/Roof, Iron Rails, Plastered Soffi | 228.00 | |
1019 | Cement Stairway (FLT) | 6.00 | |
BED | Bedrooms | 444.00 | |
BTHF | Bath-Full | 240.00 | |
LIV | # Living Units | 192.00 |
Building # 2, Section # 1, CLUBHOUSE, Clubhouse
Building # 3, Section # 1, APT BLDG B, Low-Rise Multiple
Type | Model | Heated Sq Ft | Repl Cost New | YrBlt | WAY | Other % Dpr | Normal % Dpr | % Cond | Value |
---|---|---|---|---|---|---|---|---|---|
RES | 03 | 13186 | $1,925,633 | 2012 | 2012 | 0.00% | 19.50% | 80.50% | $1,550,135 |
Structural Elements
Type | Description | Code | Details |
---|---|---|---|
ROOF | ROOF | 0208 | Composition Shingle |
EW | EXT WALL | 0109 | Frame, Stucco |
EW | EXT WALL | 0134 | Veneer, Stone |
HEAT | HEAT | 0351 | Warmed & Cooled Air |
0502 | Automatic Appliance Allowance | 1.00 | |
0601 | Plumbing Fixtures -# | 120.00 | |
0602 | Plumbing Fixtures Rough-ins -# | 12.00 | |
SBFL | SubFloor (RES) | 0622 | Raised Subfloor (%) |
M#UNITS | Number of MultiFamily Units | 12.00 | |
0402 | Automatic Floor Cover Allowance | 1.00 | |
0901 | Open Slab Porch (SF) | 228.00 | |
0904 | Slab Porch with Roof (SF) | 514.00 | |
1006 | Cement Balcony (SF) Iron Rails Plastered Soffit | 228.00 | |
1014 | Cement Balcony w/Roof, Iron Rails, Plastered Soffi | 228.00 | |
1019 | Cement Stairway (FLT) | 6.00 |
Building # 4, Section # 1, APT BLDG C, Low-Rise Multiple
Type | Model | Heated Sq Ft | Repl Cost New | YrBlt | WAY | Other % Dpr | Normal % Dpr | % Cond | Value |
---|---|---|---|---|---|---|---|---|---|
RES | 03 | 13186 | $1,925,633 | 2012 | 2012 | 0.00% | 19.50% | 80.50% | $1,550,135 |
Structural Elements
Type | Description | Code | Details |
---|---|---|---|
ROOF | ROOF | 0208 | Composition Shingle |
EW | EXT WALL | 0109 | Frame, Stucco |
EW | EXT WALL | 0134 | Veneer, Stone |
HEAT | HEAT | 0351 | Warmed & Cooled Air |
0502 | Automatic Appliance Allowance | 1.00 | |
0601 | Plumbing Fixtures -# | 120.00 | |
0602 | Plumbing Fixtures Rough-ins -# | 12.00 | |
SBFL | SubFloor (RES) | 0622 | Raised Subfloor (%) |
M#UNITS | Number of MultiFamily Units | 12.00 | |
0402 | Automatic Floor Cover Allowance | 1.00 | |
0901 | Open Slab Porch (SF) | 228.00 | |
0904 | Slab Porch with Roof (SF) | 514.00 | |
1006 | Cement Balcony (SF) Iron Rails Plastered Soffit | 228.00 | |
1014 | Cement Balcony w/Roof, Iron Rails, Plastered Soffi | 228.00 | |
1019 | Cement Stairway (FLT) | 6.00 |
Building # 5, Section # 1, APT BLDG D, Low-Rise Multiple
Type | Model | Heated Sq Ft | Repl Cost New | YrBlt | WAY | Other % Dpr | Normal % Dpr | % Cond | Value |
---|---|---|---|---|---|---|---|---|---|
RES | 03 | 13186 | $1,925,633 | 2012 | 2012 | 0.00% | 19.50% | 80.50% | $1,550,135 |
Structural Elements
Type | Description | Code | Details |
---|---|---|---|
ROOF | ROOF | 0208 | Composition Shingle |
EW | EXT WALL | 0109 | Frame, Stucco |
EW | EXT WALL | 0134 | Veneer, Stone |
HEAT | HEAT | 0351 | Warmed & Cooled Air |
0502 | Automatic Appliance Allowance | 1.00 | |
0601 | Plumbing Fixtures -# | 120.00 | |
0602 | Plumbing Fixtures Rough-ins -# | 12.00 | |
SBFL | SubFloor (RES) | 0622 | Raised Subfloor (%) |
M#UNITS | Number of MultiFamily Units | 12.00 | |
0402 | Automatic Floor Cover Allowance | 1.00 | |
0901 | Open Slab Porch (SF) | 228.00 | |
0904 | Slab Porch with Roof (SF) | 514.00 | |
1006 | Cement Balcony (SF) Iron Rails Plastered Soffit | 228.00 | |
1014 | Cement Balcony w/Roof, Iron Rails, Plastered Soffi | 228.00 | |
1019 | Cement Stairway (FLT) | 6.00 |
Building # 6, Section # 1, APT BLDG E, Low-Rise Multiple
Type | Model | Heated Sq Ft | Repl Cost New | YrBlt | WAY | Other % Dpr | Normal % Dpr | % Cond | Value |
---|---|---|---|---|---|---|---|---|---|
RES | 03 | 13186 | $1,925,633 | 2012 | 2012 | 0.00% | 19.50% | 80.50% | $1,550,135 |
Structural Elements
Type | Description | Code | Details |
---|---|---|---|
ROOF | ROOF | 0208 | Composition Shingle |
EW | EXT WALL | 0109 | Frame, Stucco |
EW | EXT WALL | 0134 | Veneer, Stone |
HEAT | HEAT | 0351 | Warmed & Cooled Air |
0502 | Automatic Appliance Allowance | 1.00 | |
0601 | Plumbing Fixtures -# | 120.00 | |
0602 | Plumbing Fixtures Rough-ins -# | 12.00 | |
SBFL | SubFloor (RES) | 0622 | Raised Subfloor (%) |
M#UNITS | Number of MultiFamily Units | 12.00 | |
0402 | Automatic Floor Cover Allowance | 1.00 | |
0901 | Open Slab Porch (SF) | 228.00 | |
0904 | Slab Porch with Roof (SF) | 514.00 | |
1006 | Cement Balcony (SF) Iron Rails Plastered Soffit | 228.00 | |
1014 | Cement Balcony w/Roof, Iron Rails, Plastered Soffi | 228.00 | |
1019 | Cement Stairway (FLT) | 6.00 |
Building # 7, Section # 1, APT BLDG L, Low-Rise Multiple
Type | Model | Heated Sq Ft | Repl Cost New | YrBlt | WAY | Other % Dpr | Normal % Dpr | % Cond | Value |
---|---|---|---|---|---|---|---|---|---|
RES | 03 | 13186 | $1,925,633 | 2012 | 2012 | 0.00% | 19.50% | 80.50% | $1,550,135 |
Structural Elements
Type | Description | Code | Details |
---|---|---|---|
ROOF | ROOF | 0208 | Composition Shingle |
EW | EXT WALL | 0109 | Frame, Stucco |
EW | EXT WALL | 0134 | Veneer, Stone |
HEAT | HEAT | 0351 | Warmed & Cooled Air |
0502 | Automatic Appliance Allowance | 1.00 | |
0601 | Plumbing Fixtures -# | 120.00 | |
0602 | Plumbing Fixtures Rough-ins -# | 12.00 | |
SBFL | SubFloor (RES) | 0622 | Raised Subfloor (%) |
M#UNITS | Number of MultiFamily Units | 12.00 | |
0402 | Automatic Floor Cover Allowance | 1.00 | |
0901 | Open Slab Porch (SF) | 228.00 | |
0904 | Slab Porch with Roof (SF) | 514.00 | |
1006 | Cement Balcony (SF) Iron Rails Plastered Soffit | 228.00 | |
1014 | Cement Balcony w/Roof, Iron Rails, Plastered Soffi | 228.00 | |
1019 | Cement Stairway (FLT) | 6.00 |
Building # 8, Section # 1, APT BLDG M, Low-Rise Multiple
Type | Model | Heated Sq Ft | Repl Cost New | YrBlt | WAY | Other % Dpr | Normal % Dpr | % Cond | Value |
---|---|---|---|---|---|---|---|---|---|
RES | 03 | 13186 | $1,925,633 | 2012 | 2012 | 0.00% | 19.50% | 80.50% | $1,550,135 |
Structural Elements
Type | Description | Code | Details |
---|---|---|---|
ROOF | ROOF | 0208 | Composition Shingle |
EW | EXT WALL | 0109 | Frame, Stucco |
EW | EXT WALL | 0134 | Veneer, Stone |
HEAT | HEAT | 0351 | Warmed & Cooled Air |
0502 | Automatic Appliance Allowance | 1.00 | |
0601 | Plumbing Fixtures -# | 120.00 | |
0602 | Plumbing Fixtures Rough-ins -# | 12.00 | |
SBFL | SubFloor (RES) | 0622 | Raised Subfloor (%) |
M#UNITS | Number of MultiFamily Units | 12.00 | |
0402 | Automatic Floor Cover Allowance | 1.00 | |
0901 | Open Slab Porch (SF) | 228.00 | |
0904 | Slab Porch with Roof (SF) | 514.00 | |
1006 | Cement Balcony (SF) Iron Rails Plastered Soffit | 228.00 | |
1014 | Cement Balcony w/Roof, Iron Rails, Plastered Soffi | 228.00 | |
1019 | Cement Stairway (FLT) | 6.00 |
Building # 9, Section # 1, APT BLDG N, Low-Rise Multiple
Type | Model | Heated Sq Ft | Repl Cost New | YrBlt | WAY | Other % Dpr | Normal % Dpr | % Cond | Value |
---|---|---|---|---|---|---|---|---|---|
RES | 03 | 13186 | $1,925,633 | 2012 | 2012 | 0.00% | 19.50% | 80.50% | $1,550,135 |
Structural Elements
Type | Description | Code | Details |
---|---|---|---|
ROOF | ROOF | 0208 | Composition Shingle |
EW | EXT WALL | 0109 | Frame, Stucco |
EW | EXT WALL | 0134 | Veneer, Stone |
HEAT | HEAT | 0351 | Warmed & Cooled Air |
0502 | Automatic Appliance Allowance | 1.00 | |
0601 | Plumbing Fixtures -# | 120.00 | |
0602 | Plumbing Fixtures Rough-ins -# | 12.00 | |
SBFL | SubFloor (RES) | 0622 | Raised Subfloor (%) |
M#UNITS | Number of MultiFamily Units | 12.00 | |
0402 | Automatic Floor Cover Allowance | 1.00 | |
0901 | Open Slab Porch (SF) | 228.00 | |
0904 | Slab Porch with Roof (SF) | 514.00 | |
1006 | Cement Balcony (SF) Iron Rails Plastered Soffit | 228.00 | |
1014 | Cement Balcony w/Roof, Iron Rails, Plastered Soffi | 228.00 | |
1019 | Cement Stairway (FLT) | 6.00 |
Building # 10, Section # 1, APT BLDG O, Low-Rise Multiple
Type | Model | Heated Sq Ft | Repl Cost New | YrBlt | WAY | Other % Dpr | Normal % Dpr | % Cond | Value |
---|---|---|---|---|---|---|---|---|---|
RES | 03 | 15003 | $2,129,280 | 2012 | 2012 | 0.00% | 19.50% | 80.50% | $1,714,070 |
Structural Elements
Type | Description | Code | Details |
---|---|---|---|
ROOF | ROOF | 0208 | Composition Shingle |
EW | EXT WALL | 0109 | Frame, Stucco |
EW | EXT WALL | 0134 | Veneer, Stone |
HEAT | HEAT | 0351 | Warmed & Cooled Air |
0502 | Automatic Appliance Allowance | 1.00 | |
0601 | Plumbing Fixtures -# | 120.00 | |
0602 | Plumbing Fixtures Rough-ins -# | 12.00 | |
SBFL | SubFloor (RES) | 0622 | Raised Subfloor (%) |
M#UNITS | Number of MultiFamily Units | 12.00 | |
0402 | Automatic Floor Cover Allowance | 1.00 | |
0901 | Open Slab Porch (SF) | 228.00 | |
0904 | Slab Porch with Roof (SF) | 514.00 | |
1006 | Cement Balcony (SF) Iron Rails Plastered Soffit | 228.00 | |
1014 | Cement Balcony w/Roof, Iron Rails, Plastered Soffi | 228.00 | |
1019 | Cement Stairway (FLT) | 6.00 |
Building # 11, Section # 1, APT BLDG P, Low-Rise Multiple
Type | Model | Heated Sq Ft | Repl Cost New | YrBlt | WAY | Other % Dpr | Normal % Dpr | % Cond | Value |
---|---|---|---|---|---|---|---|---|---|
RES | 03 | 15003 | $2,129,280 | 2012 | 2012 | 0.00% | 19.50% | 80.50% | $1,714,070 |
Structural Elements
Type | Description | Code | Details |
---|---|---|---|
ROOF | ROOF | 0208 | Composition Shingle |
EW | EXT WALL | 0109 | Frame, Stucco |
EW | EXT WALL | 0134 | Veneer, Stone |
HEAT | HEAT | 0351 | Warmed & Cooled Air |
0502 | Automatic Appliance Allowance | 1.00 | |
0601 | Plumbing Fixtures -# | 120.00 | |
0602 | Plumbing Fixtures Rough-ins -# | 12.00 | |
SBFL | SubFloor (RES) | 0622 | Raised Subfloor (%) |
M#UNITS | Number of MultiFamily Units | 12.00 | |
0402 | Automatic Floor Cover Allowance | 1.00 | |
0901 | Open Slab Porch (SF) | 228.00 | |
0904 | Slab Porch with Roof (SF) | 514.00 | |
1006 | Cement Balcony (SF) Iron Rails Plastered Soffit | 228.00 | |
1014 | Cement Balcony w/Roof, Iron Rails, Plastered Soffi | 228.00 | |
1019 | Cement Stairway (FLT) | 6.00 |
Building # 12, Section # 1, APT BLDG K, Low-Rise Multiple
Type | Model | Heated Sq Ft | Repl Cost New | YrBlt | WAY | Other % Dpr | Normal % Dpr | % Cond | Value |
---|---|---|---|---|---|---|---|---|---|
RES | 03 | 13186 | $1,925,633 | 2013 | 2013 | 0.00% | 18.00% | 82.00% | $1,579,019 |
Structural Elements
Type | Description | Code | Details |
---|---|---|---|
ROOF | ROOF | 0208 | Composition Shingle |
EW | EXT WALL | 0109 | Frame, Stucco |
EW | EXT WALL | 0134 | Veneer, Stone |
HEAT | HEAT | 0351 | Warmed & Cooled Air |
0502 | Automatic Appliance Allowance | 1.00 | |
0601 | Plumbing Fixtures -# | 120.00 | |
0602 | Plumbing Fixtures Rough-ins -# | 12.00 | |
SBFL | SubFloor (RES) | 0622 | Raised Subfloor (%) |
M#UNITS | Number of MultiFamily Units | 12.00 | |
0402 | Automatic Floor Cover Allowance | 1.00 | |
0901 | Open Slab Porch (SF) | 228.00 | |
0904 | Slab Porch with Roof (SF) | 514.00 | |
1006 | Cement Balcony (SF) Iron Rails Plastered Soffit | 228.00 | |
1014 | Cement Balcony w/Roof, Iron Rails, Plastered Soffi | 228.00 | |
1019 | Cement Stairway (FLT) | 6.00 |
Building # 13, Section # 1, APT BLDG F, Low-Rise Multiple
Type | Model | Heated Sq Ft | Repl Cost New | YrBlt | WAY | Other % Dpr | Normal % Dpr | % Cond | Value |
---|---|---|---|---|---|---|---|---|---|
RES | 03 | 13186 | $1,925,633 | 2013 | 2013 | 0.00% | 18.00% | 82.00% | $1,579,019 |
Structural Elements
Type | Description | Code | Details |
---|---|---|---|
ROOF | ROOF | 0208 | Composition Shingle |
EW | EXT WALL | 0109 | Frame, Stucco |
EW | EXT WALL | 0134 | Veneer, Stone |
HEAT | HEAT | 0351 | Warmed & Cooled Air |
0502 | Automatic Appliance Allowance | 1.00 | |
0601 | Plumbing Fixtures -# | 120.00 | |
0602 | Plumbing Fixtures Rough-ins -# | 12.00 | |
SBFL | SubFloor (RES) | 0622 | Raised Subfloor (%) |
M#UNITS | Number of MultiFamily Units | 12.00 | |
0402 | Automatic Floor Cover Allowance | 1.00 | |
0901 | Open Slab Porch (SF) | 228.00 | |
0904 | Slab Porch with Roof (SF) | 514.00 | |
1006 | Cement Balcony (SF) Iron Rails Plastered Soffit | 228.00 | |
1014 | Cement Balcony w/Roof, Iron Rails, Plastered Soffi | 228.00 | |
1019 | Cement Stairway (FLT) | 6.00 |
Building # 14, Section # 1, APT BLDG G, Low-Rise Multiple
Type | Model | Heated Sq Ft | Repl Cost New | YrBlt | WAY | Other % Dpr | Normal % Dpr | % Cond | Value |
---|---|---|---|---|---|---|---|---|---|
RES | 03 | 13186 | $1,925,633 | 2013 | 2013 | 0.00% | 18.00% | 82.00% | $1,579,019 |
Structural Elements
Type | Description | Code | Details |
---|---|---|---|
ROOF | ROOF | 0208 | Composition Shingle |
EW | EXT WALL | 0109 | Frame, Stucco |
EW | EXT WALL | 0134 | Veneer, Stone |
HEAT | HEAT | 0351 | Warmed & Cooled Air |
0502 | Automatic Appliance Allowance | 1.00 | |
0601 | Plumbing Fixtures -# | 120.00 | |
0602 | Plumbing Fixtures Rough-ins -# | 12.00 | |
SBFL | SubFloor (RES) | 0622 | Raised Subfloor (%) |
M#UNITS | Number of MultiFamily Units | 12.00 | |
0402 | Automatic Floor Cover Allowance | 1.00 | |
0901 | Open Slab Porch (SF) | 228.00 | |
0904 | Slab Porch with Roof (SF) | 514.00 | |
1006 | Cement Balcony (SF) Iron Rails Plastered Soffit | 228.00 | |
1014 | Cement Balcony w/Roof, Iron Rails, Plastered Soffi | 228.00 | |
1019 | Cement Stairway (FLT) | 6.00 |
Building # 15, Section # 1, APT BLDG H, Low-Rise Multiple
Type | Model | Heated Sq Ft | Repl Cost New | YrBlt | WAY | Other % Dpr | Normal % Dpr | % Cond | Value |
---|---|---|---|---|---|---|---|---|---|
RES | 03 | 15003 | $2,129,280 | 2013 | 2013 | 0.00% | 18.00% | 82.00% | $1,746,010 |
Structural Elements
Type | Description | Code | Details |
---|---|---|---|
ROOF | ROOF | 0208 | Composition Shingle |
EW | EXT WALL | 0109 | Frame, Stucco |
EW | EXT WALL | 0134 | Veneer, Stone |
HEAT | HEAT | 0351 | Warmed & Cooled Air |
0502 | Automatic Appliance Allowance | 1.00 | |
0601 | Plumbing Fixtures -# | 120.00 | |
0602 | Plumbing Fixtures Rough-ins -# | 12.00 | |
SBFL | SubFloor (RES) | 0622 | Raised Subfloor (%) |
M#UNITS | Number of MultiFamily Units | 12.00 | |
0402 | Automatic Floor Cover Allowance | 1.00 | |
0901 | Open Slab Porch (SF) | 228.00 | |
0904 | Slab Porch with Roof (SF) | 514.00 | |
1006 | Cement Balcony (SF) Iron Rails Plastered Soffit | 228.00 | |
1014 | Cement Balcony w/Roof, Iron Rails, Plastered Soffi | 228.00 | |
1019 | Cement Stairway (FLT) | 6.00 |
Building # 16, Section # 1, APT BLDG I, Low-Rise Multiple
Type | Model | Heated Sq Ft | Repl Cost New | YrBlt | WAY | Other % Dpr | Normal % Dpr | % Cond | Value |
---|---|---|---|---|---|---|---|---|---|
RES | 03 | 15003 | $2,129,280 | 2013 | 2013 | 0.00% | 18.00% | 82.00% | $1,746,010 |
Structural Elements
Type | Description | Code | Details |
---|---|---|---|
ROOF | ROOF | 0208 | Composition Shingle |
EW | EXT WALL | 0109 | Frame, Stucco |
EW | EXT WALL | 0134 | Veneer, Stone |
HEAT | HEAT | 0351 | Warmed & Cooled Air |
0502 | Automatic Appliance Allowance | 1.00 | |
0601 | Plumbing Fixtures -# | 120.00 | |
0602 | Plumbing Fixtures Rough-ins -# | 12.00 | |
SBFL | SubFloor (RES) | 0622 | Raised Subfloor (%) |
M#UNITS | Number of MultiFamily Units | 12.00 | |
0402 | Automatic Floor Cover Allowance | 1.00 | |
0901 | Open Slab Porch (SF) | 228.00 | |
0904 | Slab Porch with Roof (SF) | 514.00 | |
1006 | Cement Balcony (SF) Iron Rails Plastered Soffit | 228.00 | |
1014 | Cement Balcony w/Roof, Iron Rails, Plastered Soffi | 228.00 | |
1019 | Cement Stairway (FLT) | 6.00 |
Building # 17, Section # 1, APT BLDG J, Low-Rise Multiple
Type | Model | Heated Sq Ft | Repl Cost New | YrBlt | WAY | Other % Dpr | Normal % Dpr | % Cond | Value |
---|---|---|---|---|---|---|---|---|---|
RES | 03 | 15003 | $2,129,280 | 2013 | 2013 | 0.00% | 18.00% | 82.00% | $1,746,010 |
Structural Elements
Type | Description | Code | Details |
---|---|---|---|
ROOF | ROOF | 0208 | Composition Shingle |
EW | EXT WALL | 0109 | Frame, Stucco |
EW | EXT WALL | 0134 | Veneer, Stone |
HEAT | HEAT | 0351 | Warmed & Cooled Air |
0502 | Automatic Appliance Allowance | 1.00 | |
0601 | Plumbing Fixtures -# | 120.00 | |
0602 | Plumbing Fixtures Rough-ins -# | 12.00 | |
SBFL | SubFloor (RES) | 0622 | Raised Subfloor (%) |
M#UNITS | Number of MultiFamily Units | 12.00 | |
0402 | Automatic Floor Cover Allowance | 1.00 | |
0901 | Open Slab Porch (SF) | 228.00 | |
0904 | Slab Porch with Roof (SF) | 514.00 | |
1006 | Cement Balcony (SF) Iron Rails Plastered Soffit | 228.00 | |
1014 | Cement Balcony w/Roof, Iron Rails, Plastered Soffi | 228.00 | |
1019 | Cement Stairway (FLT) | 6.00 |
Extra Features
Code | Description | Length | Width | Units | Unit Price | AYB | Repl Cost | % Good Condition | Dpr Value* | Final Value |
---|---|---|---|---|---|---|---|---|---|---|
PIPRA | FENCE - METAL PIPE AVG | 48.00 | $26.11 | 2018 | $1,253 | 90% | $1,122 | $1,122 | ||
CNCBW8 | WALL - COMM'L 8" C/BLOCK, REINFORCED | 5423.00 | $18.49 | 2011 | $100,271 | 79% | $79,214 | $79,214 | ||
CNCBW8 | WALL - COMM'L 8" C/BLOCK, REINFORCED | 992.00 | $18.49 | 2011 | $18,342 | 79% | $14,490 | $14,490 | ||
CFW | CONC FLATWORK | 960.00 | $7.26 | 2011 | $6,970 | 79% | $5,506 | $5,506 | ||
ASPHC | ASPH COMMERCIAL | 131593.00 | $9.70 | 2012 | $1,276,452 | 81% | $1,027,544 | $1,027,544 | ||
CFW | CONC FLATWORK | 15470.00 | $6.05 | 2011 | $93,594 | 79% | $73,939 | $73,939 | ||
CG1 | CURBING 6"CONCRETE W/1'GUTTER PER LF | 4444.00 | $21.52 | 2012 | $95,635 | 81% | $76,986 | $76,986 | ||
C6 | CURBING 6"CONCRETE NO GUTTER PER LF | 384.00 | $14.58 | 2013 | $5,599 | 82% | $4,591 | $4,591 | ||
MVL | LIGHTS - MERCURY VAPOR, COST P/EACH | 96.00 | $1,532.00 | 2013 | $147,072 | 82% | $120,599 | $120,599 | ||
CNCBW8 | WALL - COMM'L 8" C/BLOCK, REINFORCED | 648.00 | $18.49 | 2013 | $11,982 | 82% | $9,825 | $9,825 | ||
CFW | CONC FLATWORK | 576.00 | $7.26 | 2013 | $4,182 | 82% | $3,429 | $3,429 | ||
CNCBW8 | WALL - COMM'L 8" C/BLOCK, REINFORCED | 900.00 | $18.49 | 2013 | $16,641 | 82% | $13,646 | $13,646 | ||
WIF | FENCE - RES WR/IRON,STEEL,ALUM, PER SF | 675.00 | $12.15 | 2013 | $8,201 | 82% | $6,725 | $6,725 | ||
CFW | CONC FLATWORK | 21456.00 | $6.05 | 2013 | $129,809 | 82% | $106,443 | $106,443 | ||
CSCCP1 | PORCH-CONCRETE,COVERED W/COMP. SHINGLE | 11 | 34 | 374.00 | $23.62 | 2018 | $8,834 | 90% | $7,906 | $7,906 |
CFW | CONC FLATWORK | 1328.00 | $6.45 | 2018 | $8,566 | 90% | $7,666 | $7,666 | ||
COP2 | PORCH-CONCRETE OPEN W/STEPS | 6 | 10 | 60.00 | $25.46 | 2018 | $1,528 | 90% | $1,367 | $1,367 |
RAMP1 | WALKWAY RAMP CONCRETE P/SF | 130.00 | $35.01 | 2018 | $4,551 | 90% | $4,073 | $4,073 |
Land Lines
Personal Property
Account | Secured/ Unsecured | Owner | Description |
---|---|---|---|
BU240052 | Unsecured | ALISON ITZA CONSULTING | BU - BUSINESS EQUIPMENT |
Disclaimer
All parcel data on this page is for use by the Elko County Assessor for assessment purposes only. The summary data on this page may not be a complete representation of the parcel or of the improvements thereon. Building information, including unit counts and number of permitted units, should be verified with the appropriate building and planning agencies. Zoning information should be verified with the appropriate planning agency. All parcels are reappraised each year. This is a true and accurate copy of the records of the Elko County Assessor's Office as of April 21, 2025.